| 1 | PRICE BID EOI No: TCIL/ITTIV/94/2026 Date:12/03/2026 Selection of pre-bid partner for “Establishing Network Operation Centre (NOC) For GRID-INDIA Along with enhanced Hardware Infrastructure for existing SOC \\" Name of the Bidder Company : SN Item Description unit Qty(A) Unit Price(INR)(B) Price exluding GST(INR)C=A x B GST(%)(D) Total Price incl GST(INR)C x (100+D)/100 A Cost of the Software & Hardware including 5 years Back-to-Back OEM Warranty as per TS and Installation and Configuration. |
| 2 | Network Visibility, Management & Configuration including necessary capturing devices (if any) at both Central and all 6 site locations |
| 3 | Network visibility and management tool along with Server monitoring |
| 4 | Network Device Configuration Manager (NCM) |
| 5 | Network and Application Packet Capturing and Analysis System, along with Central Service Dashboard including necessary capturing devices (if any) at both Central and (all 6) site locations |
| 6 | Network Detection & Response (NDR) including necessary capturing devices (if any) at both Central and all 6 site locations |
| 7 | Service management and ticketing tool including necessary systems / subscriptions for complete 5 years tenure of the project along with cost of migration (if any) |
| 8 | Hardware and software for above tools at Remote locations |
| 9 | Network Taps (with unidirectional restrictions at the hardware level) |
| 10 | PFS with 48 x 10G Interfaces SW+HW |
| 11 | Managed L3 Switch (8 X1/10G interfaces with SW+HW) |
| 12 | 1. Other Hardware and software components (such as Trap server/collector with storage) required to collect & store (5 days’ data in case of link failure) data from OT network through Unidirectional gateway (at physical level) for the tools mentioned in item 1.1 (10 nos.) 2. Other Hardware and software components (such as Trap server/collector with storage) required to collect & store (5 days data in case of link failure) data from IT network for the tools mentioned in item 1.1(6 nos.) |
| 13 | Hardware and storage (with necessary software) for the above tool at central NOC location |
| 14 | Server Hardware / Appliance along with required OS, Application, Databases and accessories for storing and retaining all data for at least 01 year at DC Delhi |
| 15 | 2x2 55 inch Video Wall with Controller for integrating the Panels to a single display |
| 16 | 24’ inch Workstation with CPU and OS |
| 17 | Unidirectional air-gapped gate between IT and OT integration |
| 18 | Necessary hardware and software for data and configuration backup of DC at backup site. |
| 19 | Any other software, hardware, DB etc. required to provide end-to-end solution |
| 20 | Bidder Efforts & OEM Cost for Installation and Configuration B Comprehensive Operation and Maintenance |
| 21 | Deputation of L2 Resource on 24 x 7 basis |
| 22 | Cost for initial tuning and system configuration by engaging technical expert (as per qualification available in TS for a period of at least 6 month) till Tuning of the system whichever is later. |
| 23 | Comprehensive Operation and Maintenance cost of Bidder including OEM scope of work (including audit cost and compliance to various external/internal audit finding etc.) Grand total including GST |