| 1 | Toing of 250 P.S.I air Compressor by tractor from store to site and back from site. |
| 2 | Carting of compressor's T&P by Truck from store to site and back from site… |
| 3 | Loading and unloading of Compressor's T&P and back from site. |
| 4 | Return trip of above after completion of work |
| 5 | Toing of O.P Unit by tractor from store to site and back from site. |
| 6 | Carting of O.P Unit's T&P by Truck from store to site and back from site. |
| 7 | Loading and Unloading of O.P Unit's T&P and back from site. |
| 8 | Return trip of above after completion of work |
| 9 | Erection of 250 PSI Air Compressor, T&P and camp equipages |
| 10 | Development of T.W by 250 P.S.I Air Compressor upto 60 hrs. |
| 11 | Dismantling of Air Compressor and its T&P |
| 12 | Erection of O.P Unit, T&P and camp equipages |
| 13 | Development of T.W by O.P Unit upto 150 hrs. |
| 14 | Dismantling of O.P Unit and its T&P |
| 15 | Supply and Shrouding of Pea Gravel |
| 16 | Making Chemical treatment of T/W by Sodium try poly phosphate/Sodium hexa meta Phosphate solution |
| 17 | Making arrangement for pulling out of M.S protection ring from T/W for lowering and lifting of air line. |
| 18 | Yield and verticality test of T.W alongwith chemical and bacterialogical analysis of tubewell's water (UPJN-2019-20-EP-1 Attached) |
| 19 | Cleaning of site for soil and send including filling of pit and disposal lead up to 10 km for way from site by tractor trolly and labour including loading unloading after completion of drilling and development work. |
| 20 | Repairing of old pump house with Distempering work with all labour and materials T&P all complete work |
| 21 | Repairing of old pump house with two coat primer oil paint, putti with all labour and materials T&P all complete work |
| 22 | Electric wiring and other electric work with all laboour material etc all complete work |
| 23 | Mild Steel or iron work in heavy sizes such as trusses, builts up gates, Coor frames, records racks roof work, gates etc. wrought to required form, including drillimg holes, rivetting or welding where necessary, and also including supply of steel, bolts, nuts and wastages etc. and kabza, belan etc. and their fixing required for completion of the work as per site. |
| 24 | Less 5% for departmentel efficency Please Enable Macros to View BoQ information |