| 1 | 2.31 Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared |
| 2 | 2.6.1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil |
| 3 | 2.26.1 Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil |
| 4 | 60.7.3 DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. |
| 5 | 7.1.1 Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with: Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 6 | 60.7.1 DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site |
| 7 | 60.7.8 DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site |
| 8 | 100.55.5 Removing filter media from the filter beds without making any damages to the existing structures and back manifolds and stacking at a safe and convenient place for segregation process and as per the directions of the department officers etc. complete. |
| 9 | OD-2 Desilting and removal of accumulated sludge from the pond using suitable means such as pumping or excavator or any other approved method without causing any damage to existing structures including removal of debris impurities and vegetation and depositing the sludge in the excavated pit or any other suitable location as directed by Rubber Park officials and the work shall include deployment of diesel pump with necessary connecting hoses wherever required for pumping sludge mixed with water and supply of all materials, fuel, lubricants, consumables, labour, transportation, loading, unloading, handling and all incidental charges complete in all respects as per the direction and satisfaction of the Engineer in Charge Rubber Park. |
| 10 | OD-3 Supplying and laying 40 mm broken stone in filter bed in required thickness. The rate inclusive of cost and conveyance of all materials, labour charges etc complete all as per detailed specifications and directions of the Engineer in charge at all levels. |
| 11 | OD-4 Supplying and laying 20 mm to 12.5mm broken stone in filter bed in required thickness. The rate inclusive of cost and conveyance of all materials, labour charges etc complete all as per detailed specifications and directions of the Engineer in charge at all levels. |
| 12 | OD -5 Supplying and laying 10mm to 6mm broken stone infilter bed in required thickness. The rate inclusive of cost and conveyance of all materials, labour charges etc complete all as per detailed specifications and directions of the Engineer in charge at all levels. Please Enable Macros to View BoQ information |