| 1 | Construction of New Toilet P U P School at Pallur Panchayat |
| 2 | Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation. |
| 3 | Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., |
| 4 | Brick work in CM 1:5 mix using country bricks ground moulded of size 23 x 11 x 7 Cm for the following including curing etc., complete complying with standard specifications. |
| 5 | Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers Lintels, Staircase waist slabs, Landing slabs, Landing beam, Portico beam etc.) |
| 6 | Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers Lintels, Staircase waist slabs, Landing slabs, Landing beam, Portico beam etc.) |
| 7 | Supplying and Fabricating and placing in position MS Steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and blinding wire all floors etc., complete complying with standard specification. |
| 8 | Rainforcement Cement Concrete 1:1 1/2:3 using 20 mm ISS HBG metal for all RCC item of works excluding cost of reinforcement and fabricating charges, centering and shuttering but icluding curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls, sides and bottom of the slabs, beams, etc., shall be finished smooth with cement mortar 1:3, 12mm thick and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. |
| 9 | Paving the floor with pre-polished concrete anti-skid tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) Using anti-skid tiles (Observed Data) |
| 10 | Dadooing of walls with glazed tiles of size 15 cm x15cmx6mm laid in CM 1:2, 10mm thick & pointing with white cement using 0.4kg/cm2 including cost and conveyance of all materials and labour charges , etc, complete. |
| 11 | Plastering with CM 1:5, 12mm thick over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. |
| 12 | Plastering with CM 1:3, 10mm thick over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. |
| 13 | Plastering with CM 1:4, 20mm thick over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. |
| 14 | Cost and Supply of steel doors and windows of Specified Gauge and thicness as Directed by the departmental offcers, including all labour charges and fabrication charges etc, complete. |
| 15 | Steel door 1.10m X 2.10m |
| 16 | Steel door 0.75m X 1.80m |
| 17 | Jolly |
| 18 | Cost and Supply of Warter Closet,PVC Pipe Including all cost and convenyance for etc complete |
| 19 | Water Closet Indian types |
| 20 | Wash Basin |
| 21 | 1000 litre HDPE Tank |
| 22 | RCC Ring with Cover Slab |
| 23 | Painting Two coat approved Plastic Emulsion over the plastered surface including cost and all other charges etc., |
| 24 | Painting TWO coats of new iron works such as steel doors, windows,ventilators, window bars, balustrades etc., |
| 25 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \\"BB\\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) Please Enable Macros to View BoQ information |