Name of Work:- Construction of Pond in Village-Kochang,Panchayat-Kochang,Block-Arki, Dist.-Khunti.(G.N.-1)
Sl. No.
Item Description
1
Earth work in Excavation of canal by hydraulic excavator as per designed section in all kinds of soil, soil mixed with kankar, pebbles & boulders upto 300 mm size and disposal of spoil upto 500 mtr with all lifts by tipper including construction and maintenance of haul road all complete as per specification and direction of E/I.1/ 7.1.43.2 pg.no 138 W.R.D 2022
2
Earth work in excavation in canal by Hydraulic excavator as per designed section in soft rock (where blasting is not needed) vide type of soil item- c with disposal of spoil upto 500 mt with all lifts by tipper including construction and maintenance of haul road all complete as per specification and direction of E/I. 2/ 7.1.43.6 pg no 138 S.O.R w.R.D 2022
3
Trimming and dressing the side slopes of dam to proper section with all lead and lifts as per drawing, specification and direction of E/I 1/5.1.1 pg.no 99 B.C.D 2022
4
Dewatering by 10 HP diesel pump machine 5./S.I 147 Pg.no 54 W.R.D 22
5
E/w in excavation of foundation Trench in all kinds of soil - do- do- as per specification and direction of E/I3/ 5.1.38 pg no 105 S.O.R W.R.D 2022
6
Providing and laying clean sand in filling -do -do- direction of E/I2/5.1.10 pg no.99 B.C.D 2022
7
Providing and laying stone in -do -do- direction of E/I3/5.6.8 Common item SOR 2022 pg no.209
8
Providing and laying P.C.C(1:2:4) in -do -do- direction of E/I4/5.3.1.2 pg no.106 SOR B.C.D 22
9
Providing and laying rough random stone masonary in C.M (1:4) in foundation and plinth do-do- direction of E/I5/5.2.28 pg no.102 SOR B.C.D jun 22
10
Providing and laying R.C.C(1:2:4) in slab -do -do- direction of E/I6/5.3.9.2 pg no.107 SOR B.C.D 22
11
Providing and laying TOR steel in slab -do -do- direction of E/I7/5.5.5 pg no.119 SOR B.C.D 22
12
Providing 25 mm thick cement and plaster (1:4)do-do direction of E/I 8/5.7.12 pg no.129 SOR B.C.D jun 22
13
providing 1.5mm cement punning including curing …direction 9./5.7.11 pg no.129 SOR B.C.D jun 22
14
Filling in foundation trenches and plinth in layers…..direction of 10./5.1.7 pg no.99 SOR B.C.D jun 22
15
Carrege
16
Cement
17
Chips
18
Boulder
19
After adding GST @12% on total estimated value the total estimated amount is
20
Labour Cess @1% on above total estimated amount Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.