|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. |
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. |
| 3 | Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material: All kinds of soil |
| 4 | Hand-packing stones in wire-crates; excluding cost of crates and stones |
| 5 | Supply Stone boulder (nallah) nominal size 225 mm |
| 6 | Dumping stone excluding cost of stones in Horizontal on level |
| 7 | Filling available excavated earth (excluding rock) in trenches, plinth, sides ofoundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. |
| 8 | Felling of trees of girth (measured at height of 1 mtr above ground) including cutting of trunk and branches, removing of roots and stacking of seviceable material and disposal of unserviceable material beyond Beyond 30cm girth upto and including 60 cm girth |
| 9 | Beyond 60cm girth upto and including 120cm girtth |
| 10 | Supplying and stacking of good earth at site including royalty ( earth measured in stacks will be reduced by 20% for payment) |
| 11 | Filling E/c bags with availalble earth including cost of strings and sewing |
| 12 | Placing of earth filled bags in position(Dry) |
| 13 | Placing of earth filled bags in position(Wet) |
| 14 | Laying of poythene sheets to prevent leakages (labour only) |
| 15 | Providing and fixing of DWC (Double walled Corrugated) SN8 pipes including all sorts of carriages upto site of work. 12\\" dia |
| 16 | 10\\" dia |
| 17 | 8\\" dia |
| 18 | 6\\" dia |
| 19 | Silt clearance from canals in(Wet) |
| 20 | Silt clearance from canals in(Dry) |
| 21 | Removal of unhygienic materials (so classified by the site engineer) from designated sites and its disposal as per directions, all inclusive carriages. |
| 22 | Slip Clearance n ordinary soils disposal lead upto 50m and lift upto 1.5m |
| 23 | Removing of slips in soils;mixed with moorum/Kankar/Shingle/Boulders;disposal lead upto 50m and lift upto 1.5m |
| 24 | Weed clearance from canals( including extraction of roots) |
| 25 | Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge. |
| 26 | Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar |
| 27 | Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar |
| 28 | Dismantling wooden ballies in posts and struts including stacking within 50 meters lead. |
| 29 | Dismantling and stacking within 50 meters lead, fencing posts or struts including all earth work and dismantling of concrete etc. in base of: R.C.C. |
| 30 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix). |
| 31 | Providing & fixing of plain GI tin sheets over flumes for arresting leakages including all accessories material and all sorts of carraiges. |
| 32 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
| 33 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Riveted and bolted. |
| 34 | Welded |
| 35 | Hire charge of Hydraulic excavator (3D) with driver and fuel. |
| 36 | Hire charges of pumpset of capacity of 4000 litres/Hour having 8 hours working including all charges with all carriages, fuel and other required lubricants. |
| 37 | Holting charges of pumpset of capacity of 4000 litres/Hour including all charges with all carriages, fuel and other required lubricants. |
| 38 | Construction of muthu bunds,comprising boulders and wood bushes in alternate layers;including working in water situations |
| 39 | Supply /fixing of poplar sawed wood in the form of joists,planks,struts etc for providing of wooden including all accessiories materials like nails,washers etc and all sorts of carriages. Complete job as per direction of Engineer incharge. |
| 40 | Reparing of existing steel/work Gates by way of Oiling/Greasing/welding if required at site applying of priming coats including painting of regarding shade to intial as per direction of Enginer in charge. |
| 41 | Supplying of paper ream A4 size for office use (75 GSM) of reputed quality. (Trident Spectra, JK Easy Copier) |
| 42 | Supply of printer ink for epson 13150 (pack of 4). |
| 43 | Supply of printer cartirage for HP Laser Jet M1136 MFP |
| 44 | Overhauling of winch machines including all sorts of carriages ,cleaning , greasing, oiling, replacement /worn out nuts /bolts etc and refixing /realighnment of lever system after application of lubricants as per engineer In charge |
| 45 | Refixing of trash guards of canals including welding ,denting etc |
| 46 | Supply of items for repairing of winch machines:- Greese |
| 47 | Nut bolts of required size |
| 48 | Gears of required size |
| 49 | Handles of operating gates |
| 50 | worm wheel of required size |
| 51 | 40mm winch rod of required size |
| 52 | 50 mm winch rod of required size |
| 53 | 60 mm winch rod of required size |
| 54 | good quality paint |
| 55 | Hire charges of chain Mounted Earth moving equipment LNT including fuel, diver ,and crawling charges etc complete job |
| 56 | Providing and laying of PVC Pipes with all the required accesssories and carriages of approved brand and quality and complete job 1) 100 mm dia |
| 57 | 2) 150 mm dia |
| 58 | 3) 200 mm |
| 59 | Supply of Labours |
| 60 | Cost of E/C bags . |
| 61 | Polythene (including all Carriage) |
| 62 | Crate Mesh (including Mechnical Transport) |
| 63 | Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete job. 100mm dia RCC Pipe |
| 64 | 150mm dia RCC Pipe |
| 65 | 250mm dia RCC Pipe |
| 66 | 300mm dia RCC Pipe |
| 67 | 450mm dia RCC Pipe |
| 68 | 500mm dia RCC Pipe |
| 69 | 600mm dia RCC Pipe |
| 70 | 700mm dia RCC Pipe |
| 71 | 800mm dia RCC Pipe |
| 72 | 900mm dia RCC Pipe |
| 73 | 1000mm dia RCC Pipe |
| 74 | 1100mm dia RCC Pipe |
| 75 | 1200mm dia RCC Pipe |
| 76 | Carriage of Materials from source upto road site by Mechnical transport including cost of loading unloading and stacking Earth for Ist km |
| 77 | for every additional km (actual as per site) |
| 78 | Stone boulders for 1km |
| 79 | for every additional km (actual as per site) |
| 80 | E/C bags from source for Ist Km |
| 81 | for every additional km (actual as per site) |
| 82 | Carriage of Un-hygenic Material/ Sludge (Wet) 1st km |
| 83 | for every additional km (actual as per site) |
| 84 | Extra carriage of Materials from road site to site of work by Mannual labour Including loading unloading and stacking ( Earth for Ist 50mtrs |
| 85 | for every additional 50mtrs (actual as per site) |
| 86 | Stone boulders for Ist 50 mtrs |
| 87 | for every additional 50mtrs (actual as per site) |
| 88 | E.C bags 1st 50mtrs |
| 89 | for every additional 50mtrs (actual as per site) |
| 90 | Crate Mesh 4\\"x4\\" for 1km |
| 91 | for every additional 50m (actual as per site) |
| 92 | Cost of Geo Tagged Photographs |
| 93 | Dismentaling of Tin walling/CGI sheets erected on embankments of irrigation canals by any means as per Directions of engineer In charge. Please Enable Macros to View BoQ information |