| 1 | Clearing and scrub/ light jungle by cutting, removing and disposing of all materials such as bushes, scrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness rubbish including cutting of trees up to 300mm girth KM-0/0-3/400 |
| 2 | Picking the existing black top/ WBM surface to 50 MM depth including labour, hire charges d plants and all other incidental charges etc. complete as per MOST specification. KM-0/0-3/400 |
| 3 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A KM-0/0-3/400 |
| 4 | Providing US Gravel with a lead of 2.068 KM including cost and conveyance and stacking at site to departmental gauge for taking pre measurements by departmental officers and including labour charges for spreading the gravel as per standard specification etc Side Beams KM-2/0-3/0 |
| 5 | Providing US Gravel with a lead of 2.068 KM including cost and conveyance and stacking at site to departmental gauge for taking pre measurements by departmental officers and including labour charges for spreading the gravel as per standard specification Side Beams KM-2/0-4/0 |
| 6 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5 KM-0/0-3/400 |
| 7 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.KM-0/0-3/400 |
| 8 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., KM-0/0-3/400 |
| 9 | Providing and laying open graded premix carpet 20mm compacted thick using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC HBG machine crushed chips with 14.60Kg of Bitumen for 10 sqm of pre-mix carpet and laying of Seal coat type \\"A\\" over the premix carpet using 0.09 cum of 6.70mm IRC HBG macine crushed chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of chips and stacking them to departmental gauge for pre-measurement including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condotion appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreding the same by power rolling to the specified lines and grades including all labour charges application of bitumen forseal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 inclyuding all labour charges hire and fuel charges for mini hot mix plantboiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, etc., complete KM-0/0-3/400 |
| 10 | Provision for Hm.stone |
| 11 | Provision for Km stone |
| 12 | Provision for White Marking 4\\" Wide |
| 13 | Labour welfare fund 1% |
| 14 | Provision for Name Board Please Enable Macros to View BoQ information |