| 1 | Dismantling clearing away for Floor finish and dadooing walls in cement mortar including Mosaic Tiles / Glazed Tiles / Cuddapah Slabs etc and clearing the debries and depostiting the same at the place as shown by the departmental officers. |
| 2 | Dismantling clearing away plain cement concrete from the sannathi and and clearing the debries at site of work including cost of conveyance charges etc. all complete and complying with standard specification |
| 3 | Dismantling clearing away brick Masonry in Cement Mortar walls under 3 m high and clearing the debries and depositing the debries in the place as shown by the departmental officers. |
| 4 | Cleaning and removal of lime plastering in brick wall and clearing the debries shown in the site as directed by the departmental officers. |
| 5 | Cleaning the stone surfaces with water such as wall stones, pillar, pothiyal, Uthiram, flooring and pavukkal from white wash/colour wash including cost of necessary soap/brushes labour charges for cleaning etc, complete as directed by the departmental officers. |
| 6 | Pointing the cut stone flooring and masonry work with lime mortar 1:1.5 excluding cost and conveyance of cut stone but including all labour charges scaffolding etc complete with standard specifications. The lime used which is highly iron fortified and suitable for structural and masonry works. |
| 7 | Earth work excavation for foundation in all classes of soils and sub soils and todepth as may be directed except in hard rock, requiring blasting, including initial leads and lifts and re-filling the sides of foundation, with excavated earth in 150mm layers well watered rammed and consolidated, including depositing surplus earth clearing and levelling the site, shoring shuttering baling out water wherever necessary etc., complete complying with standard specification. |
| 8 | Supplying and filling in foundation, basement, etc with filling M sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. Complete complying with standard specification |
| 9 | Plain cement concrete 1:5:10(One of cement five of sand and ten aggregate) using 40mm gauge hard granite broken stone jelly for foundation and basement including cost and conveyance of all materials labour for mixing, laying, compacting, curing, dewatering, side shuttering, wherever necessary including curing etc., complete complying with standard specification. |
| 10 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, Sill slabs etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid with silver oak joists of size 10cm x 5cm & 7.5cm x 5cm as support runner , vertical stiffener , side support and Top Horizontal stiffener spaced at about 60cm to 90cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid). |
| 11 | Footing and grade beam |
| 12 | Column |
| 13 | Providing and laying in position, standardised concrete Mix M-20 Grade in accordance with IS:456-2000, using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser/super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m) 7730 kg. of 20mm machine crushed stone jelly with about (3.3 cu.m) 5156kg. of 10-12mm machine crushed stone jelly with about (4.79 cu.m) 7670 kg. of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mehanical vibrators, finishing, curing etc. and providing fixtures like fan clamps extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the excess usage of materials). |
| 14 | Foundation upto basement |
| 15 | Ground floor |
| 16 | Supplying and fabricating and placing in position Mild Steel /Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I binding wire in all floors etc. Complete complying with standard specification. (The steel and binding wire contractor own supply. Foundation & Basement |
| 17 | For superstructure |
| 18 | Brick work in following cement mortar using best quality clay bricks of Size 8 ¾ x 4 ¼” x2 ¾” with class destination of 7.5 for foundation and basement including cost and conveyance charges of all materials to site and including labour charges and incidental charges curing etc, complete complying with standard specification. |
| 19 | For Kerb wall for foundation and basement in CM 1:5 |
| 20 | Ground floor in CM 1:6 |
| 21 | Plastering with Cement Mortar 1:5(One cement and five sand),12mm thick in all floors including curing, finishing etc, complete complying with standard specifications. |
| 22 | Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with Lime Mortor 1:1.5 using pollachi lime complete including shapping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embdding broken bricks of shaped/chiselled bricks, rough-plastering with Lime mortar 1:1.5 and finishing with final ornamental plastering and nayam theervani including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete inculding all axtra for folding and inculuding clearing from the vimanams/gopurams 100sft superficial area. excluding kalkaram upto 25' ht |
| 23 | Painting new plastered wall surface with two finishing coats of ready mixed (emulsion) of approved quality and colour over the existing wall in all floors etc, complete complying with standard specification and as directed by the departmental officers. (The make quality and colour of paint should be got approved by the Executive Engineer before use on work) (Interior painting) |
| 24 | Scrapping the existing paint thoroughly and repainting two coat with approved water based exterior emulsion over the cement plastered wall surface, ceiling and other new surface over priming coat including clearing preparing the surface curing in all floors including brushes etc., complete as per standard specification. (External surface) |
| 25 | Scaffolding charges for Vimanams and gopurams with casurina posts coconut or plam trees wherever necessary for main, form work and providing ladder arrangements, country wood plank for working, inspection etc, complete hire charges only for erection, maintainance and removing the same on completion of the work. |
| 26 | Vimanam/gopuram Upto 25-0\\" feet |
| 27 | Vimanam/gopuram Upto 50-0\\" feet |
| 28 | Supplying and fixing mild steel grill gate, grills for doors and windows welding, grinding and including cost conveyance of all materials and fixing in position including priming coat etc complete with standard specifications. |
| 29 | Painting new iron works such as steel doors, windows, ventilators, window bars, balustrated etc, with two coats of best approved first quality and colour of synthetic enamel paint over the existing zinc chromide priming coat in all floors etc, complete complying with standard specification. (The make quality and colour of paint should be got approved by the Executive Engineer before use on works). |
| 30 | Painting old iron works such as gate, steel doors windows ventilators with two coats of approved quality and color of synthetic enamel paint over the existing zinc chromate yellow primer in all floor etc, complete complying with standard specifications. |
| 31 | Supplying and fixing teak wood temple type door using well seasoned best quality teak wood including wrought and put up all materials, labour charges and fixing in position including all furniture fittings making grows in the frame and door shutter for housing the shutter etc complete with standard specifications.Upto 7'feet ht |
| 32 | Painting new wood work with two finishing coats with synthetic enamel ready mixed paint of approved quality and colour over one coat priming coat including brush, labour charges etc, complete complying with standard specification. |
| 33 | Providing new sudhai vigrahams in the vimanams and Rajagopurams with copper rod reinforcement of suitable dia with binding wires wherever necessary, shaping the core with broken bricks set in Lime mortar 1:3 finishing the same with Lime mortar 1:3 bringing to the correct shape (Lakshana) in conformift with silpa sastra inclusive of special ornaments, weapons, peedam etc., complete and providing L.M. Nayam theervai wherever necessary. inclusive of cost and conveyance of all materials, such as cement broken bricks, and copper rods.binding wire all labour for working in heights, curing lifiting of materials etc., complete including cement painting 2 coats over a primary coat (one vigraham is accountable with one head, 4 hands with weapons, ornamental costumes etc., as per prathima lakshans, Vigraham height is measurable from the crown top to the bottom of foot only If peetam is provided the rate with peetam may be adopted as datailed hereunder) |
| 34 | Sudhai 1'6\\"-2'6\\" |
| 35 | Sudhai 2'6\\"-3'6\\" |
| 36 | Flooring with cut stone slab of size 600mmX600mm and other sizes suitable for site requirement not less than 100mm thick with machine cut edges and top surface dressed as directed by the departmental officers including cost and conveyance of materials to site and labour charges for paving and Pointing With Lime Mortor1:1.5 etc complete. |
| 37 | Sub Total |
| 38 | GST 18% Please Enable Macros to View BoQ information |