|
| 1 | (4.10.1.1) Earth work in excavation in foundation,trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.In all types soils/ saturated soil such as moorum, sand, sandy silt,clay, black cotton soil, kankar,etc.Depth upto 1.5 m |
| 2 | (4.10.1.2) Add extra for over all depth of excavation above 1.5 m and upto 3.0 m over item no 4.10.1.1 |
| 3 | (1.1.3) Carriage of Materials by mechanical transport including loading,unloading and stacking ::Stone,boulders,gravelly material uptp 5Km. |
| 4 | (21.1.2) Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). |
| 5 | (25.1.2) Random rubble masonry with hard stone in foundation and plinth : Cement mortar 1:4 (1 cement : 4 coarse sand) |
| 6 | (32.3.2) Cement plastering including T&P, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 20 mm cement plaster of mix : including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar 1:4 (1 cement : 4 fine/ coarse sand) |
| 7 | (32.9) Neat cement punning |
| 8 | (12.7.1) Providing and fixing stone slab covering of required size over drains including filling of joints with cement sand mortar 1:3 complete as per direction of Engineer-in-charge.Average thickness 60 to 75 mm |
| 9 | (23.19.6) Reinforcement for R.C.C. work at all levels including straightening,cutting, bending,placing in position and binding all complete.Thermo-Mechanically Treated bars. |
| 10 | (34.35.1) Constructing masonry Chamber 60x45x50 cm, inside with 75 class designation brick work in cement mortar 1:4 (1 cement : 4 coarse sand) for water meter complete with C.I. double flap surface box 400x200x200 mm (inside) with locking arrangement and RCC top slab 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) necessary excavation foundation concrete 1:5:10 ( 1 cement : 5 fine sand :10 graded stone aggregate 40 mm nominal size) and inside plastering with cement mortar 1:3 (1 cement : 3 coarse sand) 12 mm thick finished with a floating coat of neat cement complete as per standard design : With F.P.S. bricks |
| 11 | (20.2.1.1) Construction of tube-well from ground levels and upto 100 Meter depth and above to accommodate housing and assembly pipe of following sizes in all types of alluvium strata by percussion/ rotary drilling method and with gravel as per IS:4097-1967 and packing as per IS:2800 (Part I -& II) 1979 as amended upto date (the work includes the cost of gravel & its primary packing and packing during development, lowering of housing & strainer assembly pipes, with supply and wrapping of coir-rope, wherever necessary for arresting fine sand particles. The work will not include cost of housing pipe and strainer pipe assembly and development work, but work would be completed after obtaining sand free water).150 mm Nominal bore |
| 12 | (20.5.1) Supply of strainer pipes made of ERW M.S. black pipe ISI mark of following sizes at the site of work including required size of slotting as per IS:8110-1985 of following nominal bore sizes at site of work.150 mm dia |
| 13 | (20.4.3) Supply of ERW M.S. black casing pipe ISI marked (IS: 4270/1992) 20.4.3of grade Fe410 of following nominal bore sizes at site of work.150 mm dia |
| 14 | (20.1.3) Construction of Tube-well upto 100 Meter depth and above in all type of rocks by DTH system and over burden to accommodate casing pipe of following sizes in all types of soils and over burden including lowering of casing pipes but excluding cost of casing pipes as per IS : 2800 (Part I & II) 1979 specifications. The work would be completed after obtaining sand free water. The tube well should have a throughout bore as per nominal dia of casing pipe:150 mm dia Nominal bore |
| 15 | (34.7.3) Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes,having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge.25 mm nominal outer dia .Pipes. |
| 16 | () Providing, lowering, laying in trenches, aligning, fixing in position and jointing socketed rubber gasket type ISI marked uPVC pipes of Class III (6 Kg/sqcm) suitable for potable water with rubber ring joints (as per IS 4985-2000) of following outer dia with all accessories (excluding specials) complete including all material,labour, hydraulic testing and commissioning as per Technical Specifications and as per direction of Engineer. |
| 17 | (19.1.2) 110 mm diameter |
| 18 | (19.1.4) 140 mm diameter |
| 19 | (19.1.4) 140 mm diameter |
| 20 | (19.1.4) 140 mm diameter |
| 21 | (19.1.4) 140 mm diameter |
| 22 | (19.1.4) 140 mm diameter |
| 23 | (19.1.4) 140 mm diameter Please Enable Macros to View BoQ information |