| 1 | Name of Work: Betwa Vihar Awasiya Yojna Phase-2 main Filling and Boundary wall ka karya.Note :-(1)- GST Excluded on the aforesaid work. |
| 2 | Earth work in cutting or in Filling in ordinary soil, excavation to be in the form of regular pits not exceeding 1/2 metre (20\\") in depth and earthwork in embankment to be in 20 cm(8\\") layers, including ramming & dressing the surface to required levels and slopes and also including 1.5 metre (5fts) lifts and 30 m. (100') lead. The earth from cutting to be used in making filling or to be deposited as spoil banks within 30 metres (100 fts) distance as directed by Engineer-in- charge including Cartage 5km in distance 253 SOR(2022) |
| 3 | Excavation in Foundation in ordinary soil mixed (Loam clay, or sand) including lift upto 1.5 metre (5 fts) and lead upto 30 m (100 fts) & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer- in-charge upto a distance of 30 m. (100) fts) from the foundation trenches. 252 SOR(2022) |
| 4 | cement concrete with 4cm (1.5\\") gauge approved stone ballast , approved course sand and cement in the proportion of 8:4:1 including supply of all materials,labour and T&P etc. required for proper completion of the work 281 SOR(2022) |
| 5 | Rcc work with cement approved coarse sand and 2cm (3/4\\") gauge approved stone ballast in the proportion of 1:1.5:3 in RCC at foundation and footing with 4cm .excluding supply of Reinforced and its binding but including its fixing and binding the same with 24 B.w.G.I binding wire and including necessary centering and shuttering etc and also including supply of all materials,labour & T&P etc required for proper completion of work .Binding wire cost being include in this item 287(1) SOR(2022) |
| 6 | Rcc work with cement approved coarse sand and 2cm (3/4\\") gauge approved stone ballast in the proportion of 1:1.5:3 in RCC Colomn with 4cm .excluding supply of Reinforced and its binding but including its fixing and binding the same with 24 B.w.G.I binding wire and including necessary centering and shuttering etc and also including supply of all materials,labour & T&P etc required for proper completion of work .Binding wire cost being include in this item As in item no. (283) but on R.C.C. columns in 1.1.5.3 288(1) SOR (2022) |
| 7 | Rcc work with cement approved coarse sand and 2cm (3/4\\") gauge approved stone ballast in the proportion of 1:1.5:3 in RCC T Beam and slab roofs and Rcc coloumn excluding supply of Reinforced and its binding but including its fixing and binding the same with 24 B.w.G.I binding wire and including necessary centering and shuttering etc and also including supply of all materials,labour & T&P etc required for proper completion of work .Binding wire cost being include in this item 285(1) SOR(2022) |
| 8 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage & overlapping & hooks. 504 SOR(2022) |
| 9 | First class brick work in 1:6 cement and fine sand of 1.25 FM. mortar in foundation and plinth including supply of all materials, labour and T & Petc. required for proper completion of the work. 303 SOR(2022) |
| 10 | First class brick work in 1:4 cement and fine sand of 1.25 FM. mortar in foundation and plinth & super- structure including supply of all materials, labour and T & Petc. required for proper completion of the work. (305+309+310) SOR(2022) |
| 11 | 15 mm Cement plaster in single coat on rough side of single or half brick wall for interior plastering upto floor two level including internal rounded angles chamfers, and rounded angles not exceeding 80 mm. In girth and finished even and smooth. 17.59 SOR(2022) |
| 12 | Providing and applying Plaster of Paris Putty of 2 mm Thickness over plastered surface to prepare the surface even and smooth complete. New item Ref DAR 13.26 sor(2022) |
| 13 | Finishing walls with water proofing cement paint of approved make and quality on new work with two coat to give to give an even shade. Including supply of all material, labour and T&P etc. required for proper completion of the work. (660+661) SOR(2022) Please Enable Macros to View BoQ information |