| 1 | (Supply Part) of prop. 250 KVA 11/0.4 kV S/Stn. PMKSY Zone -3 Tullah at Village Chulla(Kothi) |
| 2 | Prov. Distribution Transformer (Ordinary) 11/0.4KV, 250 KVA |
| 3 | Prov.Steel Tubular Pole ( 9 Mtrs Working Load͕͕ ͕ 200Kgf/m²) for common pole |
| 4 | Prov.R.C.C.Muff with Concrete filling |
| 5 | Prov.X-Arm (Channel Iron (100x50x6 mm),Length:2800 mmx 2 Nos) |
| 6 | Prov.M.S Angle Iron (50x50x6 mm),Length:2800 mmx( 1 Nos for LA's) |
| 7 | Prov.X-Arm (Channel Iron (75x40x6 mm),Length:2800 mmx 4 Nos) for Supporting D.O.fuse Unit & G.O.Switch |
| 8 | Prov. X-Aram Channel iron 100x50x6 mm length 2800 mm x 2 Nos. for transformer Bed. |
| 9 | Prov. X-Aram Channel iron 100x50x6 mm length 460 mm x 2 Nos. for supporting Main channel of transformer. |
| 10 | Prov.M.S Angle Iron (50x50x6 mm),Length:2800 mm x 2 Nos. |
| 11 | Prov.M.S Angle Iron (35x35x6 mm),Length: 460 mm x 2 Nos. |
| 12 | Prov.M.S Angle Iron (35x35x6 mm),Length: 950 mm x 2 Nos. for Bed Knee Bracing |
| 13 | MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos |
| 14 | MS Angle Iron (50X50x6 mm), Length : (450 mm) x 1 Nos |
| 15 | GO Switch Handle Supporting: [Channel Iron (75x40x6 mm), Length : 460 mm |
| 16 | GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type |
| 17 | D.O Fuse Unit |
| 18 | Surge Arrester, 9 kV Station Class (Porcelain Type) |
| 19 | Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) |
| 20 | Stay set complete (i/c Stay Clamps) |
| 21 | Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set) |
| 22 | Pipe Earthing Set |
| 23 | 6 SWG GI wire For Earthing |
| 24 | Prov. L.T. distribution panel box with ACB (400 A, 50 kA, 1 Nos.) and SFU (100 A, 6 Nos. rewirable). |
| 25 | Half Clamp (M.S. Flat 50X6 mm) |
| 26 | Full Clamps (M.S. Flat 50X6 mm) |
| 27 | Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)] |
| 28 | Aluminium Thimble |
| 29 | Copper Thimble 95Amp |
| 30 | Danger Plate |
| 31 | Barbed Wire |
| 32 | LT Cable (3.5 Core) 400 mm² |
| 33 | Energy meter (3-phase, 4-wire) DLMS compliant 400/5 A, CT type for 250 KVA DTR. |
| 34 | Aluminium Paint. |
| 35 | Red Oxide |
| 36 | GOBBLER 16 Step ( 24 Feet/ 7.20meter) Portable & Compact Ultra-Stable Extendable Aluminium Telescopic Ladder -GB-TL16 7.2m SKU: TI-G1-46338 |
| 37 | (Supply Part) of 11 KV H.T. Line re-conductring for prop. 250 KVA 11/0.4 kV S/Stn. PMKSY Zone -3 Tullah at Village Chulla(Kothi) |
| 38 | Prov. AAAC 7/3.15mm2 (55 mm²) |
| 39 | Prov.Steel Tubular Pole 9 Mtr Long W/L 200 Kgf/m² |
| 40 | Prov.RCC Muff with concrete filling |
| 41 | Prov.Pole Top Bracket MS Channel iron 100x50x6 mm ,Length 180mm (Top) |
| 42 | Prov. Cross Arm: (Channel Iron(100x50x6 mm), Length (1270) mm for Single Pole Str. |
| 43 | Prov.Knee bracing of Angle Iron (50x50x6mm), Length (2x750) mm |
| 44 | Prov.11 KV Pin Insulators (Porcelain,12 KV.10 KN) for Single Pole |
| 45 | Prov.H.T.Stay Set Complete in all respects |
| 46 | Prov.Stay Wire (7/3.15 mm) (10.0 Kg Per Stay Set) |
| 47 | Prov. H.T.Earthing Set Complete |
| 48 | Prov.Single Continous Earth Wire ( G.I. 8 SWG) |
| 49 | Prov, Eye hook for earth wire |
| 50 | Prov.Danger Plate (250x200x1.6 mm) |
| 51 | Prov.Nuts & Bolts of various Sizes(Galvanised)/Coated) 16 mm Φ or more ( With flat and spring washer) |
| 52 | Full clamp |
| 53 | Prov. Half clamp. |
| 54 | Prov.Barbed Wire |
| 55 | Prov.Red oxide Paint |
| 56 | Prov.Alluminium Paint |
| 57 | GOBBLER 15 Step (20.5 Feet/ 6.2meter) Portable & Compact Ultra-Stable Extendable Aluminium Telescopic Ladder -GB-TL 6.2m |
| 58 | (Supply Part) of 1 No. 11/0.4 kV HT Metering unit for prop. 250 KVA 11/0.4 kV S/Stn. PMKSY Zone -3 Tullah at Village Chulla(Kothi) |
| 59 | CT-PT Combined Unit [PT:11 kV/110 V) ; CT:50/5A] |
| 60 | 3-phase, 3/4-Wire CT-PT operated Static Trivector Meter (DLMS Compliant) |
| 61 | PVC Multistrand 4 mm² copper wire with Φ-1 inch GI pipe for concealing |
| 62 | Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)] |
| 63 | Aluminium Thimble |
| 64 | Copper tinned Thimble |
| 65 | Danger Plate |
| 66 | (Supply Part) of New L.T. Line to prop. 250 KVA 11/0.4 kV S/Stn. PMKSY Zone -3 Tullah at Village Chulla(Kothi) |
| 67 | Prov. AAAC 7/3.15mm2 (55 mm²) |
| 68 | Prov. Steel Tubular Pole 9 Mtr Long |
| 69 | Prov.RCC Muff with Concrete Filling |
| 70 | Prov.Shackle Insulator (18 KN) |
| 71 | Prov.D-Iron (U-Clamps) |
| 72 | Prov.Earth Knob |
| 73 | Prov.L.T.Stay Set Complete |
| 74 | Prov.Stay Wire (@ 6 Kg per Stay Set) |
| 75 | Prov. Full clamp for L.T.Stay Set |
| 76 | Prov.Earthing Set Complete |
| 77 | Prov.Earth wire (G.I.8 SWG) ( Additional 1% ( Sag and Wastage) @ 0.102 Kg/Mtrs |
| 78 | Prov.Nuts & Bolts of various Sizes(Galvanised)/Coated) 16 mm Φ or more ( With flat and spring washer) |
| 79 | Prov.Alluminium Paint |
| 80 | Prov. PVC Spacer |
| 81 | (Erection Part ) of prop. 250 KVA 11/0.4 kV S/Stn. PMKSY Zone -3 Tullah at Village Chulla(Kothi) |
| 82 | Digging of pit for pole & Earthing ( 2 Nos for Poles & 3 Nos for Earth) , Drilling of holes in X arm , Preparation of plate form str. Member CI, AI, i.e X arm and Knee Bracing set. Erection of Double structure , Concreting of RCC Muff, Erection of plate form, Erection of X-Arm, Drop out, Lightening Arrestors, MCCB, Switch L.T.Box, Energy Meter , Erection of 63 kVA Transformer, Providing earthing to G.O.Switch, Transformer Lightening Arrestor , Erection of two No stay sets. Erection of Jumpers, Erection of L.T.Cable and Fixing of barbed wire and painting. Loading & unloading of 63 KVA 22/0.4 KV transformer . Complete in all respect as directed by the Engineer-In-Charge including all types of risk & incedental at site. |
| 83 | Loading & Unloading of transformer through JCB/Hydra |
| 84 | Add Transporation Charges |
| 85 | (Erection Part) ) of 11 KV H.T. Line re-conductring for prop. 250 KVA 11/0.4 kV S/Stn. PMKSY Zone -3 Tullah at Village Chulla(Kothi) |
| 86 | Dismantalling of ACSR conductor off size complete in all respects |
| 87 | Erection of ST Pole 9 Mtr. Long (Single pole structure) of 11 kV HT line with RCC Muffs including Digging of Pit,drilling of Holes in poles, X-Arm,Fixing of pin/disc Insulators,X-Arm, Knee Bracing set, Top clamp, Fixing of barbed wire danger plate, filling of pit+ramming, painting of pole , fixing of nuts-bolts ,half/full clamps etc. complete in all respects. |
| 88 | Erection of HT Stay sets comprising of Digging of pit,fixing of stay rod,filling of pit,Nozzeling and tighting etc.complete in all respect |
| 89 | Erection of Earthing comprising of Digging of pit,Fixing of GI wire to earth System ,eye hook & filling of pit etc. complete in all respects. |
| 90 | Laying, stringing, sagging & binding of AAAC 7/3.15mm2 (55 mm²) complete in all respects |
| 91 | Laying, stringing, sagging & binding of GI Wire 8 SWG complete in all respects. |
| 92 | Add manual carriage from road head to site of work with average lead 0.5 km( includes 4 nos ST pole with muff, stay set with stay wire, Gi wire, x-arms & AAAC conductor) |
| 93 | Add Transporation Charges 50% of total charges for 1 KM Line |
| 94 | Erection Part) of New L.T. Line to prop. 250 KVA 11/0.4 kV S/Stn. PMKSY Zone -3 Tullah at Village Chulla(Kothi) |
| 95 | Erection of ST Pole 9 mtr long of LT line with RCC Muffs including Digging of Pit,drilling of Holes in poles, X-Arm,Fixing of shackle Insulators with D-iron,filling of pit+ramming, painting of pole , fixing of nuts-bolts ,half/full clamps etc. complete in all respects. |
| 96 | Erection of LT Stay sets comprising of Digging of pit,fixing of stay rod,filling of pit,Nozzeling and tighting etc.complete in all respect |
| 97 | Erection of Earthing comprising of Digging of pit,Fixing of GI wire to earth System ,eye hook & filling of pit etc. complete in all respects. |
| 98 | Laying, stringing, sagging & binding of AAAC 7/3.15mm2 (50mm²) complete in all respects |
| 99 | Laying, stringing, sagging & binding of GI Wire 8 SWG complete in all respects. |
| 100 | Add Transporation Charges |
| 101 | (Erection Part) of 1 No. 11/0.4 kV HT Metering unit for prop. 250 KVA 11/0.4 kV S/Stn. PMKSY Zone -3 Tullah at Village Chulla(Kothi) |
| 102 | Erection of CT/PT Unit Complete in all respect as directed by the Engineer-In-Charge complete in all respect. |
| 103 | Add Transporation Charges |
| 104 | CIVIL PART (DTR foundation & chain link fencing of existing 1 No. 22/0.4 kV, 250 kVA distribution transformer PMKSY Zone -3 Tullah at Village Chulla(Kothi ) |
| 105 | C/O RCC Foundation for 250 KVA Transformer:- Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. ordernary rock. |
| 106 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:3:6 (1 Cement : 3 coarse sand): 6 graded stone aggregate 40 mm nominal size) |
| 107 | Centering and shuttering including strutting, propping etc. and removal of form for:-Foundations, footings, bases of columns, etc. for mass concrete. |
| 108 | Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. |
| 109 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:1.5:3 (1 cement : 1.5 coarse sand): 3 graded stone aggregate 20 mm nominal size) |
| 110 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 111 | Chain link fencing (For 250KVA Transformer):- Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. |
| 112 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand) : 8 graded stone aggregate 40 mm nominal size) |
| 113 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand) : 3 graded stone aggregate 20 mm nominal size) |
| 114 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works |
| 115 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-in-charge. Made of G.I. wire of dia 4 mm |
| 116 | Providing and fixing ISI marked M.S. pressed butt hinges bright finished with necessary screws etc. complete :100x58x1.90 mm |
| 117 | Providing and fixing ISI marked oxidised M.S. sliding door bolts with nuts and screws etc. complete :250x16 mm Please Enable Macros to View BoQ information |