| 1 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 2. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. |
| 2 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 4. (A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) |
| 3 | BUILDING WORKS ( C ) BRICKWORKS, CONCRETE WORKS Etc.A. BRICK WORKS 1. Single Brick Flat Soling of picked jhama bricksincluding ramming and dressing bed to proper level and filling jointswith local sand. |
| 4 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc B.CONCRETE WORKS 1. Cement concrete with graded jhama khoa(30 mm size) excluding shuttering In ground floor and foundation (a)1:3:6 proportion |
| 5 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLESETC 13. Removal of rubbish,earth etc. from the working site anddisposal of the same beyond the compound, in conformity with theMunicipal / Corporation Rules for such disposal, loading into truckand cleaning the site in all respect as per direction of Engineer incharge |
| 6 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 7. Brick work with 1st class bricks in cement mortar (1:4) (a) In foundation and plinth |
| 7 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING,POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor,ceiling etc.) with sand and cement mortar including rounding off orchamfering corners as directed and raking out joints includingthroating, nosing and drip course, scaffolding/staging wherenecessary (Ground floor).[Excluding cost of chipping over concretesurface](ii) With 1:4 cement mortar (a) 20 mm thick plaster |
| 8 | SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 1 (b) Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. (This item is applicable to new work or old work when the original surface has been exposed by removal of old paint.) |
| 9 | SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 2 (A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : (a) On timber or plastered surface :With super gloss (hi-gloss) -(ii) Two coats (white in shade) |
| 10 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages. |
| 11 | Sub Total |
| 12 | GST 18% |
| 13 | CESS 1% Please Enable Macros to View BoQ information |