| 1 | BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. A. ORIGINAL WORKS 1. M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length,fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire chargeof all tools and plants and labour required for the work including allincidental chages such as electricity charges, labour insurancecharges etc. Payment to be made on the basis of calculated weight ofstructural members only in finished work as per IS specified weight.Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7% of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15 % of weight for finished structal members weighing less than 22.5 Kg. / m. may be increased allow for bracket, cleat, rivet, bolts and nuts etc. and noseperate payment being made for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level from the ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initiial 8m. or part thereof. II) For Structural Works in Roof Trusses etc. using joists, channels and angles of specified section weighing less than 22.5 kg/ m |
| 2 | Gas cutting of M.S. pipes and/or M.S.plates of different thikness allcomplete as per specification and direction of the Engineer-in-charge. |
| 3 | BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS,GATES ETC. B. REPAIRING 2. Welding in M.S. structural work withgas or electric: (b) Continuous weld. |
| 4 | SECTION 1. ------------BUILDING WORKS (K) PAINTING,VERNISHING ETC A. ORIGINAL WORKS 1 (a) Priming one coat onsteel or other metal surface with synthetic oil bound primer ofapproved quality including smoothening surfaces by sand paperingetc (This item is applicable to new work or old work when the originalsurface has been exposed by removal of old paint.) |
| 5 | BUILDING WORKS (K) PAINTING, VERNISHING ETC?(A)ORIGINAL WORKS.(2)(A) Painting with best quality synthetic enamelpaint of approved make and brand including smoothening surface bysand papering etc. including using of approved putty etc. on thesurface, if necessary :(b) On steel or other metal surface : With otherthan hi-gloss of approved quality-(iv) Two coats (with any shadeexcept white) |
| 6 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem :3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of10% contractors profit and 1% Labour welfare cess which would beadmissible to the Contractors, but contractual percentage will not beapplicable. (II) The workersemployed on high rise building or anystructure over 30 ft in height and also workers engaged in Tunnelshall be paid 20% extra wages. |
| 7 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem :17)Fitter Mechanic. Note: (I)The above rates of labour are exclusiveof 10% contractors profit and 1% Labour welfare cess which would beadmissible to the Contractors, but contractual percentage will not beapplicable. (II) The workersemployed on high rise building or anystructure over 30 ft in height and also workers engaged in Tunnelshall be paid 20% extra wages. |
| 8 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem :18)Fitter Mechanic (Helper). Note: (I)The above rates of labour areexclusive of 10% contractors profit and 1% Labour welfare cesswhich would be admissible to the Contractors, but contractualpercentage will not be applicable. (II) The workersemployed on highrise building or any structure over 30 ft in height and also workersengaged in Tunnel shall be paid 20% extra wages. |
| 9 | Sub Total |
| 10 | GST 18% |
| 11 | CESS 1% Please Enable Macros to View BoQ information |