| 1 | Cutting, uprooting of roots & stumps of trees of different girth up to 1 meter depth below ground level or bed level & filling the root holes by soil and removal of branches, roots & stumps etc. including carriage and stacking as per instruction of the Engineer-in-charge (Measurement of girth at breast height of 90 cm)(a) Bamboo cluster (each cluster to be measured separately) / Tea bushes. |
| 2 | Cutting uprooting and clearing jungles including shrubs, water weeds, bushes, trees, plants, up to 30 cm. girth including removing as directed by Engineer-in-charge. |
| 3 | Earthwork in excavation in the canals / drainage channels / borrow pits /River bed / slope of bank as noted below as per designed section & throwing the spoils in layers of 25 cm. for making banks as per profile or to deposit the same in any other place within an initial lead of 30 metre and initial lift of 1.5 metre including breaking clods, rough dressing etc. complete as per direction of the Engineer-in-charge.(a) Ordinary soil / local soil / soil mixed with moorum or kankar / silt, dry or moist / slushy silt / sticky soil. |
| 4 | Quarrying, Carrying, Supplying stone boulders from the quarrying site selected by the Engineer-In-Charge to the site of work including cost of materials, loading, unloading and carriage including all incidental charges like royalty and labour charges for laying boulder/ shingles in apron or within wire netting of sausage for slope pitching including carriage up to 30 metre and all lifts & dressing the exposed faces etc. complete as per direction of the Engineer-in-charge.( Quarry bed belongs to Forest Department, Govt. of W.B). a) Comprising Boulder above 30 Kg each 60%, above 20 Kg each 30% & above 10 Kg each 10 % for making loose boulder Apron.N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal.(a) For Forest area, Royalty including entry fee and TP fee : Rs. 178.33 per CumRoyalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amoun t due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works . |
| 5 | Supply of G.I wire netting of different mesh and made with different SWG G I wire at site as per direction of the Engineer-in-charge.a) Mesh size 150 mm x 150 mm with 10 SWG wire |
| 6 | Labour charges for constructing sausage crates with 8 Gauge/10 Gauge dia. G.I Wire netting of different shapes and sizes in embankment,apron,slope etc. including with 12 S.W/G , G.I wire and tied at required interval as per direction of the Engineer- in Charge (rate exclude cost of wire net and laying of boulders but includes cost of binding wire a) Mesh size 150 mm x 150 mm with 10 SWG wire |
| 7 | Quarrying, Carrying, Supplying stone boulders from the quarrying site selected by the Engineer-In-Charge to the site of work including cost of materials, loading, unloading and carriage including all incidental charges like royalty and labour charges for laying of boulders in apron or wire netting of sausage for pitching with all leads & lifts and dressing the exposed faces etc. complete as per direction of the Engineer-In-Charge( Quarry bed belongs to Forest Department, Govt. of W.B).a) Comprising Boulder above 30 Kg each 60%, above 20 Kg each 30% & above 10 Kg each 10 % for making trapezoidal deflectorN.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal.(b) For Non-Forest areaRoyalty : Rs.106.00 per CumRoyalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amoun t due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works . |
| 8 | Quarrying, Carrying, Supplying stone boulders from the quarrying site selected by the Engineer-In-Charge to the site of work including cost of materials, loading, unloading and carriage including all incidental charges like royalty and dressing the exposed faces etc. complete as per direction of the Engineer-In-Charge( Quarry bed belongs to Forest Department, Govt. of W.B). a) Comprising Boulder above 30 Kg each 60%, above 20 Kg each 30% & above 10 Kg each 10 % for making Boulder Sausage workN.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal.(a) For Forest area, Royalty including entry fee and TP fee : Rs. 178.33 per CumRoyalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amoun t due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works . |
| 9 | Supplying, fitting, fixing end pieces for rectangular / square / circular sausages at the ends, with 10 SWG / 8 SWG G I wire net of different mesh sizes tying & sewing the same maintaining a lap length of 150 mm all around with 12 SWG G I wire complete, including the cost of supply of wire netting, fitting etc., complete as per direction of the Engineer - in - charge.i) Mesh size 150 mm x 150 mm with 10 SWG wire |
| 10 | Quarrying, Carrying, Supplying stone boulders from the quarrying site selected by Engineer-In-Charge to the site of work including cost of materials, loading, unloading and carriage including all incidental charges like royalty and labour charges for boulder pitching on top and slope by placing required boulders (each weighing 20 Kg. and above within lead of 100 metres and all lifts) including filling the interstices with fragments as required, preparing sub-grade by cutting or filling the earth on slope up to 7.5 cm. depth, watering and ramming where necessary complete as per direction of the Engineer-in-charge. ( Quarry bed belongs to Forest Department, Govt. of W.B)c) Boulder above 20 Kg. each for slope pitching workN.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal.(a) For Forest area, Royalty including entry fee and TP fee : Rs. 178.33 per CumRoyalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amoun t due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works . |
| 11 | Quarrying, Carrying, Supplying Shingles from the quarrying site selected by the Engineer-In-Charge to the site of work including cost of materials, loading, unloading, stacking and carriage including all incidental charges like royalty as per direction of the Engineer-In-Charge including cost of accessories or other incidental charges.( Quarry bed belongs to Forest Department, Govt. of W.B). Shingles for filling Interstice of boulder pitching workN.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal. (a) For Forest area, Royalty including entry fee and TP fee : Rs. 178.33 per CumRoyalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amount due towards Royalty( including other charges wherever applicable, but including GST) will be deducted from the bills of works . |
| 12 | Supplying of Bitumen VG-10 (80/100) at site of work with 156.50 kg sealed Bitumen drum including cost of Bitumen at source and loading, unloading, carriage etc. complete. |
| 13 | Labour charges for caulking the slope of Boulder pitching by bitumen including supply of sand, shingles & bazri for filling interstices but excluding cost of bitumen within boulder or shingles at bazree region. .i) 0.230 m thick boulder pitching |
| 14 | Making rectangular / circular sausage cage with 10 SWG galvanizediron wire of 150 mm. x 150 mm. mesh wire netting with proper lappingof minimum 150 mm including sewing the joints with 12 SWG G I wireand supply of all materials and equipments including placing thesausage cage in position, filling the same with boulder or lumpaggregates complete as per direction of the Engineer-in-charge butexcluding the cost of boulder / lump aggregates and its carriage uptosite.(Cost is excluding the cost of end pieces) i) 1.50 Metre x 0.60 metre nominal section |
| 15 | Quarrying, Carrying, Supplying Shingles from the quarrying site selected by the Engineer-In-Charge to the site of work including cost of materials, loading, unloading, stacking and carriage including all incidental charges like royalty, labour charges for providing filter with well graded 40 m.m. down stone metal / shingles and laying uniformly below pitching on bed, side slopes including preparing bed with earthwork up to 30 cm depth, where necessary and compacting as per direction of the Engineer- in - Charge and including all leads and lifts complete but excluding the cost of supply and carriage of stone metals up to site.as per direction of the Engineer-In-Charge including cost of accessories or other incidental charges.( Quarry bed belongs to BL & LRO Deptt, Govt. of W.B). a) Shingles for filter in back filling side of the boulder sausage steps.N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal.(a) For Forest area, Royalty including entry fee and TP fee : Rs. 178.33 per CumRoyalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amoun t due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works . |
| 16 | Quarrying, Carrying, Supplying stone boulders from the quarrying site selected by Engineer-In-Charge to the site of work including cost of materials, loading, unloading, stacking and carriage including all incidental charges like royalty and Labour charge for dumping /laying of Laterite / Stone Boulders / Shingles / Brick Bats, from stack of worksite with all leads and lifts in water or spreading the same on the slope of the bank of River/Sea or the slope of the embankment or in the River/ Sea bed to an uniform thickness as per direction of the Engineer-in-charge including cost of all accessories and other incidental charges ( Quarry bed belongs to Forest Department, Govt. of W.B). a) Boulder above 10 kg. each for hard crust of the road.(a) For Forest area, Royalty including entry fee and TP fee : Rs. 178.33 per CumRoyalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amount due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works. |
| 17 | Quarrying, Carrying, Supplying river bed materials from the quarrying site selected by the Engineer-In-Charge to the site of work including cost of materials, loading, unloading, stacking and carriage including all incidental charges like royalty and labour charges for laying river bed materials with all leads & lifts in slope, base of apron , on the road surface and dressing the exposed faces and laying uniformly including preparing bed with earth up to 30 cm, where necessary and compacting as per direction of the Engineer-In-Charge ( Quarry bed belongs to Forest Department, Govt. of W.B). a) River Bed materials for hard crust of the embankmentN.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal. (a) For Forest area, Royalty including entry fee and TP fee : Rs. 178.33 per CumRoyalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amount due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works. |
| 18 | Extra rate over item no 2.22 for carrying boulder by head load for each additional lead of 50 meter or part thereof beyond initial distance of 50 meter, up to a distance of 200 metre (Two no head load for additional lead for Item no-04, 08 &10) |
| 19 | Making rectangular / circular sausage cage with 10 SWG galvanized iron wire of 125 mm. x 125 mm. mesh wire netting with proper lapping of minimum 150 mm including sewing the joints with 12 SWG G I wire and supply of all materials and equipments including placing the sausage cage in position, filling the same with boulder or lump aggregates complete as per direction of the Engineer-in-charge but excluding the cost of boulder / lump aggregates and its carriage upto site.(Cost is excluding the cost of end pieces i) 0.90 Metre x 0.60 metre nominal section Please Enable Macros to View BoQ information |