| 1 | Clearing jungle including uprooting trunk vegetation grass,bush wood trees and saplings of girth upto 30cm meassured at a height of 1 mtr. above ground level and removal of rubbish upto a distance of 50m outside the periphery of area cleared. (S.I. No-259) |
| 2 | Construction of embankment with approved material obtained from borrow pits with a lift up to 1.5 meter transporting to sites spreading grading to require slope and compaction to meet requirement of table 300.1 & 300.2 with a lead up to 1000 meter as per MORD technical specification clause 301.5 MORD sepecification 301.5(i) S.No. 3.4(Ordinary soil) |
| 3 | Construction of subgrade with approved material obtained from borrow pits with all lifts and leads. transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead up to 1000 m as per Technical specification cause 303.1. including Stablization with 2% slaked lime including its mixing with rotabator complete. |
| 4 | Cement treated subbaseProviding, laying, spreading Material on prepared sub grade adding cement @ 2% by weight to the spread Material manually mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength to form a layer of subbase. |
| 5 | cement treated BaseProviding, laying, spreading Material on a prepared sub base, cement @ 4% by weight to the spread Material manually mixing in place with rotavator and compacting with the road rollar at OMC to achieve the desired unconfined compressive strength to form a layer of base. |
| 6 | Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.35 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical pecification Clause 503. |
| 7 | 20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508.Case - I By Manual Means(I)Bitumen (S-90) |
| 8 | Seal CoatProviding and laying seal coat by Manual Means with VG-10 Grade Bitument sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 |
| 9 | Construction of subgrade with approved material obtained from borrow pits with all lifts and leads. transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead up to 1000 m as per Technical specification cause 303.1. including Stablization with 2% slaked lime including its mixing with rotabator complete. |
| 10 | Excavation in foundation in ordinary soil ( Loam clay or sand) including lift up to 1.5 meter (5ft) and lead upto 30m (100ft) and including filling,watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as direction by the Engineer-in-charge upto a distance of 30m(100ft) from the foundation trenches.S.I. No-251 |
| 11 | Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8km (5 miles) from the side of work & including watering ,dressing etc. Rate to include cost of all materials,labour and tools & plants,etc. required for proper completion of the work.S.I. No-255 |
| 12 | Providing Concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clauses 802, 803, 1202 & 1203 (PCC 1:2:4) |
| 13 | Providing Concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clauses 802, 803, 1202 & 1203 (RCC 1:1.5:3) |
| 14 | Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in Substructrue complete as per drawing and Technical Specifications Clauses1002,1005, 1010 and 1202 |
| 15 | Providing and laying boulder apron for bed protection with stone boulders of mainimum size and weight as per table 1300.1 no fragment weighing not less then 25 kg laid dry complete as per drawing and Technlcal Specification Clauso 1301 |
| 16 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications Clause 2706 & 2200 of MORTH. (S.I. NO- ch-1 36 (31) |
| 17 | Providing and laying Filter material underneath pitching in slopes complete as per drawing and Techical Specification Clause 1302. |
| 18 | Dewatering |
| 19 | Providing Concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clauses 802, 803, 1202 & 1203 (1:3:6) |
| 20 | Stone masonry in cement mortar for substructure complete as per drawing & technical specification clauses 702.704, 1202 and 1204 (RCR) |
| 21 | Providing and laying reinforced Cement Concrete Pipe NP-3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, back filling, concrete and masonry works in head walls and parapets Clause 1106. (1000mm dia) |
| 22 | Pointing with cement mortar (1:3) on brick work as per drawing and technical specification clauses 613.3 and 1204 |
| 23 | Plaster with cement mortar (1:4) 15mm thick on brick work in subsructrure as per technical specification clauses 613.4 and 1204 |
| 24 | Providing and laying reinforced Cement Concrete Pipe NP-3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, back filling, concrete and masonry works in head walls and parapets Clause 1106. (600 mm dia) |
| 25 | Providing and laying reinforced Cement Concrete Pipe NP-3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, back filling, concrete and masonry works in head walls and parapets Clause 1106. (350 mm dia) |
| 26 | Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing etc per drawing and Technical Specification clause 1703 (Km stone) |
| 27 | Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing etc per drawing and Technical Specification clause 1703 (Hectometer stone) |
| 28 | Poviding & fixing of retro reflective sign board size 1200x900 mm made of 2mm alloy aluminium sheet and 4 mm thick aluminium composite panel sheet fully covered with high intensity retro reflective sheet with MS angle frame of 35x35x5 mm angle iron aluminium sheet painted with 2 coat smoke grey or sky blue paint leg 75x40 mm channel 3 m long complete (size 1200x900mm) (1.08 sq. Mtr.) |
| 29 | Providing and erecting a ''W'' metal beam crash barrier comprising of 3mm thick corrugated sheet metal beam rail, 70cm above road/ground level, fixed on ISMC series channel vertical post, 150x75x5 mm spaced 2m centre, 1.8m high 1.1m below ground/ road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS. 1367 and IS:1364 metal beam rail to be fixed on the vertical post with a spacer of channel section 150x75x5mm, 330mm long complete as per clause 810. (Crash Barrier) |
| 30 | Maintenance Charge including @ Earth work ,repair of painted surface, earthwork on patri ,culvert,road furniture etc.as direction of E.I for the period of five years from the actual completion of workMaintenance cost for 1st year (@0.00 % of total work amount S.No.1-25) |
| 31 | Maintenance Charge including @ Earth work ,repair of painted surface, earthwork on patri ,culvert,road furniture etc.as direction of E.I for the period of five years from the actual completion of workMaintenance cost for 2st year (@0.75 % of total work amount S.No.1-25) |
| 32 | Maintenance Charge including @ Earth work ,repair of painted surface, earthwork on patri ,culvert,road furniture etc.as direction of E.I for the period of five years from the actual completion of workMaintenance cost for 3st year (@1.5 % of total work amount S.No.1-25) |
| 33 | Maintenance Charge including @ Earth work ,repair of painted surface, earthwork on patri ,culvert,road furniture etc.as direction of E.I for the period of five years from the actual completion of workMaintenance cost for 4st year (@2.25 % of total work amount S.No.1-25) |
| 34 | Maintenance Charge including @ Earth work ,repair of painted surface, earthwork on patri ,culvert,road furniture etc.as direction of E.I for the period of five years from the actual completion of workMaintenance cost for 5st year (@3 % of total work amount S.No.1-25) Please Enable Macros to View BoQ information |