| 1 | Clearing and grubbing the road land including uprooting Rank vegetation grass bushes shrubs etc complete. |
| 2 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site by mechanical means within a lead of 5kms, spreading, grading to required slope and compacting to meet requirement of table 300-2 & Clause 305 of MOSRT&H specifications for Road & Bridges work (4th Revision). |
| 3 | Supplying & filling moorum of approved quality including watering to complete saturation & ramming complete with all leads & lifts including cost, conveyance, royalty & taxes of all materials & cost of all labour & T&P required for the work etc. complete as per specification & direction of Engineer in charge. |
| 4 | Providin, laying, spreading & compacting graded stone aggregate to to Wet Mix Macadam specification including pre mixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, laying in uniform layers with paver in sub base/base course on well prepared surface & compacting with vibratory roller to acieve the desired density as per clause 406 of MoSRT & H specifications for road & bridge works.(4th Revision) |
| 5 | Providing & applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20kg per sqm on the prepared bituminous / granular surface cleaned with mechanical broom as per clause 503 of MOSRT&H Specifications for Road & Bridges work (4th Revision). |
| 6 | Providin & laying Semi Dense Bituminous Concret with batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder of 60/70 penetration grade of bitumen, transporting the hot mix to site, laying with a hydrostatic paver finisher with sensore control to the required grade, level & alingment, roling with smooth wheeled,vibratory & tandem rollers to achieve the desire compaction as per clause 508 of MoSRT&H Specifications for road and bridge works |
| 7 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m |
| 8 | Filling sand-Supplying & filling good clean river sand of approved quality including watering to complete saturation & ramming complete with all leads & lifts including cost, conveyance, royalty & taxes of all materials & cost of all labour & T&P required for the work etc. complete as per specification & direction of Engineer in charge. |
| 9 | P.C.C(1:3:6) using 40mm size H.G.metal well rammed with cost, Conveyance , royality,taxes of all material and labour,T & P etc.Complete. |
| 10 | Construction of granular sub-base by providing close grade granular sub-base grading-III material as per table-100-1, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density complete as per clause 401 of MOSRT&H Specifications for Road & Bridges work (4th Revision)(A/R-2006 page-160 item No-39). |
| 11 | Construction of un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M-30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction, expansion and construction joints, applying sealant, admixtures as approved, curing of concrete slabs for 14-days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification as per direction of the Engineer-in-Charge. Please Enable Macros to View BoQ information |