|
| 1 | Earth work in hard soil or gravelly soil within 50mtr. initial lead and 1.50mtr initial lift including rough dressing and levelling the bed |
| 2 | Filling F&P with sand well watered and rammed. |
| 3 | C:C: (1:4:8) using 4 cm. size H.G. metal (C.B) including the cost of all materials, labour etc complete. |
| 4 | Providing and Laying Factory made Chamfered edge Cement Concrete Paver Bliocks of required strength, thickness & size/shape made by table Vibratory method , to attain superior smoth finish using PU or Equivalent moulds ,Laid in required gray colour and Pattern over 50mm thick Compacted bed of coarse sand , copmacting and proper embedding / laying of interlocking Paver Blocks into the sand bedding layer through vibratory compaction by using plate vibrator, Filling joints with Fine sand and cutting of Paver blocks as per required size/Pattern, finishing and sweeping extra sand in footpath , parks, lawns, drive ways, or light traffic parking and Lanes/Road etc, all complete as Per Manufacturers Specifications and Driection of Engg -In -Charge. 60mmm thick Flyash based Paver Pervious Concrete Blocks With approved colour design Pattern etc. complete. |
| 5 | Supplying laying Pre-cast Kerb stone (300 x 300x 150 mm) with all cost. |
| 6 | Removing and dismentlling cement plaster from walls including raking out the joints 12mm deep and removing the drbries within 50mtr lead. |
| 7 | Scraping the old surface with all cost. |
| 8 | 12mm thick C:P (1:4) over brick work |
| 9 | Supplying all material labour T & p for 3D paint with all cost |
| 10 | Painting two coats with weather seal coat over a coat of water bound wall primer. |
| 11 | Painting two coats over a coat of priming over new wood work & Iron work with the cost of primer & paint. |
| 12 | Dismantlling paver blok road & stacking the useful material for re-use & removing the debries away from site |
| 13 | Re-laying of old paver with all cost |
| 14 | Dismantlling and removing old tiled flooring including removing the base coarse and stacking the useful materials for re-use and removing the debries within 50mtr lead. |
| 15 | Fixing granite in dados, skirting and risers of steps on 12mm C:P (1:3) jointed with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing complete including cost of precast tiles. |
| 16 | Supplying, fixing Pre-cast RCC benches with all cost. |
| 17 | Supplying all material for repair the light at Amibhy tiater |
| 18 | Repair the children play items & Gym items |
| 19 | Supplying fixing PVC Dustbin (Duble) with all cost |
| 20 | Display Board Please Enable Macros to View BoQ information |