Name of Work:- Construction of Bait Arch at Thomaiyarpuram Village of Radhapuram Taluk in Tirunelveli District.
Sl. No.
Item Description
1
Formation of Filter Layer for rubble mound Groyne with quarry run hard blue granite stone of weight upto 1Kg-10kg having a specific gravity of not less than 2.65 as per approved design and drawing including quarrying, loading transporting by tippers/lorries weighing in the electronic weigh bridge for measurement, dumping, placing in position to required level, profile and finishing the side slopes 1 : 1.5 on both sides with necessary equipment and devices as per the drawings and specification etc complete as directed by the Departmental Officers. The rate is also inclusive of placing, sectioning and finishing with necessary equipment and devices and hire and operational charges of tools and plants etc. (The payment shall be made on weight basis (ie) ladden weight minus unladden weight). The contractor has to make his own arrangements for weigh bridge.
2
Formation of Core Layer for rubble mound Groyne with quarry run hard blue granite stone of weight upto 50kg - 200kg having a specific gravity of not less than 2.65 as per approved design and drawing including quarrying, loading transporting by tippers/lorries weighing in the electronic weigh bridge for measurement, dumping, placing in position to required level, profile and finishing the side slopes 1 : 1.5 on both sides with necessary equipment and devices as per the drawings and specification etc complete as directed by the Departmental Officers. The rate is also inclusive of placing, sectioning and finishing with necessary equipment and devices and hire and operational charges of tools and plants etc. (The payment shall be made on weight basis (ie) ladden weight minus unladden weight). The contractor has to make his own arrangements for weigh bridge.
3
Formation of Toe Berm Layer for rubble mound Groyne with hard blue granite stone of weight ranging from 500 Kg to 800 Kg having a specific gravity of not less than 2.65 and as nearly cubical as possible as per approved design and drawing. The rate is inclusive of quarrying, loading at quarry using crane and other tools and plants as required, transporting by tippers/ lorries weighing on the electronic weigh bridge for measurement, Unloading/dumping placing in position to required level, profile and finishing the side slopes of 1 :1.5 using crane and floating equipment and devices as per the drawing and specification etc., complete and as directed by the Departmental Officers. The rate is inclusive of placing sectioning and finishing with necessary equipments and devices and hire and operational charges of tools and plants etc. (The payment shall be made on weight basis (ie) ladden weight minus unladden weight). The contractor has to make his own arrangements for weigh bridge.
4
Formation of Armour Layer for rubble mound Groyne with hard blue granite stone of weight ranging from 1500 Kg to 2000Kg having a specific gravity of not less than 2.65 and as nearly cubical as possible as per approved design and drawing. The rate is inclusive of quarrying, loading at quarry using crane and other tools and plants as required, transporting by tippers/ lorries weighing on the electronic weigh bridge for measurement, Unloading/dumping placing in position to required level, profile and finishing the side slopes of 1 : 1.5 using crane and floating equipment and devices as per the drawing and specification etc., complete and as directed by the Departmental Officers. The rate is inclusive of placing sectioning and finishing with necessary equipments and devices and hire and operational charges of tools and plants etc. (The payment shall be made on weight basis (ie) ladden weight minus unladden weight). The contractor has to make his own arrangements for weigh bridge.
5
Supplying and Filling with conveyed earth / Sea Rough sand in the sea shore for forming beach laying in layers of not more than 15cm thick well rammed and consolidated sectioning etc., completed as per standard spectification
6
Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
7
Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting in- clusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.A). Upto 2.40m Depth.
8
Sub total Amount for above all items (excluding GST)
9
GST 18% for above SubTotal Amount Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.