| 1 | Construction and commissioning of RCC INTZE type Over Head Service Reservoir of following capacity and staging as per the Scope of work and Technical specifications, consisting of the following main activities: - a) Topographic survey, preparation of site contour plan, conducting SBC test and its approval from department before construction. Submission and approval of concrete mix design and water quality test report for water to be used in construction.b) Excavation in all types of soil, PCC below foundation, all RCC Work, Plinth protection all around the structure including all material, labour, shuttering, scaffolding etc.c) OHSR shall be provided with adequate plinth protection all around the structure in a width starting from edge of structure at GL and extending at least up to 1.0m beyond the edge of outer most projection of OHSR. The plinth protection shall consist of 150mm thick PCC in M-15 grade concrete laid over 150mm thick layer of compacted soil.d) Providing and applying two coats of food grade epoxy paint on the inside surface on the top dome, edge beam and 600 mm height of the vertical wall.e) Conducting successfully hydro test and water tightness test as per I.S. code.f) Providing and applying three coats of anti-carbonation paint on the top surface of the Top Dome.g) Providing and applying three coats of cement-based paint on the external surface of the container, balcony, cone wall, columns & beams etc..h) Providing and fixing SS-304 ventilator, SS 304 manhole frame and cover and SS-304 ladder from top dome/Slab to bottom dome/Slab inside container.i) Providing and fixing of MS section ladder from the last landing to balcony having railing all around it and MS ladder with safety cage from balcony to top dome/slab.j) Providing and fixing water level indicator (float type). k) Providing and fixing of hand railing all around the balcony, top dome and staircase consisting of 25mm diameter Class-B GI pipe in two rows and 1000 mm high, 50X50X6mm angle iron vertical post at a maximum spacing of 1500mm centres.l) All MS parts to be painted with two coats of the enamel paint over the primer coat of red oxide.m) Providing and fixing of 150mm wide PVC water bar for the construction joints in the container (vertical wall & cone wall).n) Providing one Aluminium portable ladder of appropriate length to access first landing (3.5 to 4.5m above GL) from ground.o) Lighting arrestor consisting of providing and fixing of 2 Nos. of chemical earthing and connecting it to the conical cover of SS ventilator with two separate GI strips of 50mmX3mm.p) CI/DI puddle collar shall be fixed in the bottom dome/ slab for connecting inlet, outlet, overflow and washout pipe of the reservoir.q) Painting the name of the scheme and other details on the reservoir, and any other work related to structure as per the directions of Engineer-in- Charge, Technical Specification and Scope of Work.r) Inlet, outlet, overflow, washout pipes and valves are not included in this work, provision for the same shall be taken separately.Rates for RCC OHSR,SBC 7 T/sqm, SEISMIC ZONE-III & STAGING 20 M 200KL capacity |
| 2 | Construction of RCC (Dome type) Clear Water Reservoir of following capacity as per Scope of work and Technical specification, consisting of the following main activities: -a) Topographic survey, preparation of site contour plan, conducting SBC test and its approval from department before construction. Submission and approval of concrete mix design and water quality test report for water to be used in construction. .b) Excavation in all types of soil, PCC below foundation & all RCC Work including all labour and material charges including providing and fixing of accessories such as SS ladder, SS manhole frame and covers, water level indicator (float type), SS ventilator with SS screen, float valve, puddle collars, G.I. pipe railing around walk way, Top Dome/Slab, Staircase.c) CWR shall be provided with adequate plinth protection all around the structure in a width starting from edge of structure at GL and extending at least up to 1.0m beyond the vertical wall of CWR. The plinth protection shall consist of 150mm thick PCC in M-15 concrete over 150mm thick compacted soil fill.d) Providing and applying two coats of food grade epoxy paint on the inside surface of the roof slab, and 600 mm height of the vertical wall.e) Successful hydro test and water tightness test as per I.S. code.f) Providing and applying three coats of anti-carbonation paint on the roof Slab.g) Providing and applying three coats of cement-based paint on the remaining external surface area of the structure.h) Providing and fixing SS-304 ventilator, SS 304 manhole frame and cover and SS 304 ladder from roof slab to bottom Slab, inside container. Providing and fixing water level indicator (Float type).i) Providing and fixing MS ladder from ground to top slab.j) All MS parts to be painted with two coats of the enamelled paint over the primer coat of red oxide.k) Providing and fixing of 150mm wide water bar for the construction joints in the container.l) Providing and fixing CI/DI puddle collars the vertical wall for connecting inlet, outlet, overflow and washout pipes of the reservoir.m) Inlet, outlet, overflow, washout pipes and valves are not included in this work, provision for the same shall be taken separately.Rates for RCC Partially Underground type clear water reservoir SBC 7 T/sqm, SEISMIC ZONE2,3 & 4 400 KL capacity |
| 3 | Providing and fixing double flanged ISI marked DI Class K-9 pipes as per IS:8329-2000 (amended up to date), as vertical pipes for RCC Reservoirs including specials required such as duck foot bend, bend, tee etc. providing and fixing clamps at every 3 mtr, jointing materials such as nuts, bolt, rubber packing, hydraulic testing etc. complete in all respect up to and from valve chamber as per direction of EIC, Technical Specification and Scope of work. 100 MM |
| 4 | Providing and fixing double flanged ISI marked DI Class K-9 pipes as per IS:8329-2000 (amended up to date), as vertical pipes for RCC Reservoirs including specials required such as duck foot bend, bend, tee etc. providing and fixing clamps at every 3 mtr, jointing materials such as nuts, bolt, rubber packing, hydraulic testing etc. complete in all respect up to and from valve chamber as per direction of EIC, Technical Specification and Scope of work., 150 mm |
| 5 | Dismantling/Demolishing of elevated service reservoir situated at I/A Shahpura of capacity 150 KL using barricading, scaffolding etc whenever necessary. The contractor will have to deposit pipes and sluice valves etc in RIICO store to store in- charge in good condition before breaking off structure. However the broken cement concrete and reinforcement of demolished structure shall be property of contractor.He has to dispose off these serviceable/un serviceable material away from industrial area. The site shall have to be leveled and cleared after demolishing complete in all respect. The reinforcement taken out after dismantling will also be property of contractor. Rate to be quoted by agency as complete job. Contractor should take all safety measures as per site requirement at the time of dismantling of SR. The whole safety measures should be on the part of Contractor. Department shall not be liable for this. Work is to be done as per instructions given by Engineer-In-Charge |
| 6 | Providing, installation, testing and commissioning of Centrifugal Monoblock pump set conforming to IS 9079 , 2 pole motor operating at synchronised speed of 3000 RPM with requisite MOC impeller, priming funnel, cock, suitable flanges at suction and delivery side. Pump shall have common shaft for pump and motor. Motor shall be suitable for working on 415 V ± 10%, 3 Ph, 50 Hz A.C. Supply. Motor shall be TEFC type and Pump set shall be suitable for working at various discharge and head requirements as per scope of work. Pump shall be erected on C.C. foundation / cross channels / RSJ frame block with suitable foundation bolts grouted in C.C. foundation block etc. complete in all respect as per specification, scope of work and direction of Engineer in Charge of following power rating, suitable for prescribed duty conditions mentioned in TD., Centrifugal Monoblock Pump set (Single Stage), 15.0 KW (20.0 HP) |
| 7 | Supply and Fixing of electric control feeder panel comprising of suitable rating MCCB , fully automatic star-delta starter, over load relay, ampere meter with CTs, volt meter, phase preventer, suitable starting capacitors, phase indicators, lighting arrangement etc. complete suitable for three phase pump set. The panel should have space for energy meter ( supplied by DISCOM). All these equipments shall be housed by panel box made out from 18 gauge M.S. Sheet with powder coating. Panel should be of minimum size 900 x 600 x 450 mm with Stand ( made of angle iron of size 35x35x5mm) duly bolted/screwed with enclosure box having 4 legs, each leg’s length 18\\" and double door including in built locking system. The legs should be embedded in M-15 cement concrete plat form. The size of CC platform should be equal or bigger than the base size of panel having height of at least 200 mm from ground level. The panel should have opening of suitable size in front of space for energy meter with glass for meter reading. The operation of panel should be suitable for on 440 Volt AC Supply., Above 20 HP and up to 30 HP |
| 8 | Construction of Pump house of brick/ stone masonry of required size suitable for installation of maximum 4 no. Monoblock pump sets as per approved GA drawing, scope of work and technical specification complete work in all respect including electrical works for lighting and fans, rain water drainage. The plinth area of pump house shall be area of measurement. |
| 9 | Providing and fixing steel, gate, grating and grills made of angles, tees, square bars, flats or black pipe with hold fast and fitting complete as per design and drawing including cutting welding and fabrication with priming coat of red oxide and two coat of enamel paints. Please Enable Macros to View BoQ information |