| 1 | MAINTENANCE OF DWSS |
| 2 | 15.44.1:Dismantling G.I. pipes ( external work) including excavation and refilling trenches after taking out the pipes, manually / by mechanical means including stacking of pipes within 50 metres lead as per direction of Engineer- in- Charges:15 mm to 40 mm nominal bore |
| 3 | 50.18.9.16.1:Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge 50 mm dia 10Kgf/cm2 - External work - Exposed on wall |
| 4 | 50.18.9.6.1:Providing and fixing PVC pipes includings jointing of pipes with one step PVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. 50 mm dia 10Kgf/cm2 |
| 5 | 50.18.9.15.1:Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge 40 mm dia 10Kgf/cm2- External work- Exposed on wall |
| 6 | 22.23.1:Providing and applying integral crystalline slurry of hydrophilic in nature forwaterproofing treatment to the RCC structures like retaining walls of the basement,water tanks, roof slabs, podiums, reservior, sewage & water treatment plant, tunnels/ subway and bridge deck etc., prepared by mixing in the ratio of 5 : 2 (5 partsintegral crystalline slurry : 2 parts water) for vertical surfaces and 3 : 1 (3 partsintegral crystalline slurry : 1 part water) for horizontal surfaces and applying thesame from negative (internal) side with the help of synthetic fiber brush. The materialshall meet the requirements as specified in ACI-212-3R-2010 i.e by reducingpermeability of concrete by more than 90% compared with control concrete as perDIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystallineslurry shall be capable of self-healing of cracks up to a width of 0.50mm. The workshall be carried out all complete as per specification and the direction of the engineerin-charge. The product performance shall carry guarantee for 10 years against anyleakage.For vertical surface two coats @0.70 kg per sqm |
| 7 | OD504169/2025-2026:Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS : 15622, of approved make, in all colours and shades, laid on 20 mm thick cement mortar 1:4(1 cement : 4 coarse sand) etc., complete.Size of Tile 600 x 600 mm.(OD modified 11.41.2) |
| 8 | 11.48.2:Grouting the joints of flooring tiles having joints of 3 mm width, using epoxy grout mix 0.70 kg of organic coated filler of desired shade (0.10 kg of hardener and 0.20 kg of resin per kg). including filling /grouting and finishing complete as per direction of Engineer-in-charge.Size of Tile 600x600 mm |
| 9 | 14.1.1:Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground within 50 meters lead:With cement mortar 1:4 ( 1 cement : fine sand) |
| 10 | 13.112.1:Finishing walls with Premium Acrylic Smooth exterior paint with Siliconeadditives of required shadeOld work (Two or more coats applied @ 1.43 ltr/ 10 sqm) over existing cementpaint surface |
| 11 | 50.6.1.4:Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x20cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 20cm and above in: CM 1:6 ( 1 cement : 6 coarse sand ) etc complete |
| 12 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) |
| 13 | 10.25.2:Item Shifted to Sub head 14 as item 14.73Item Shifted to head 14 as item 14.74Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works |
| 14 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work |
| 15 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete |
| 16 | OD399646/2025-2026:Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.35 mm (+0.05%), total coated thickness with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling/self tapping screws of size (5.5x55mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. (OD based 12.50) Please Enable Macros to View BoQ information |