|
| 1 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. |
| 2 | Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling. |
| 3 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at a minimum distance of 1.5 m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil & backfilling. |
| 4 | Additional rate for excavation of one Earth Pit (2.5m depth) in Soft Rock. |
| 5 | Additional rate for providing one disc set, PG clamp etc. complete, on any type of HT pole for making cut point. |
| 6 | Fitting and erecting one HT Double Pole Structure using PSC pole in position including fitting 2 channel cross arms, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing). |
| 7 | Fitting one Additional V cross arm in existing single pole including conveyance of materials. |
| 8 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole including conveyance of materials. |
| 9 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 10 | Fitting one Additional 2.4/3m Channel cross arm (75x40x6mm), in existing 11kV DP including conveyance of materials. |
| 11 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Soft Rock. |
| 12 | Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole including digging and back filling pits in ordinary soil, drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing). |
| 13 | Fitting and erecting one HT PSC Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 14 | Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. |
| 15 | Providing midspan joint for 11kV 99sqmm AAAC covered conductor (1 conductor) |
| 16 | Doing one cable end termination on 11kV 99sqmm AAAC covered conductor (1 conductor) and connecting to existing MVT or other terminals, including charges for cable jointer etc. complete as per the direction of the departmental officers. |
| 17 | Stringing of one km 3 PH 11kV line with XLPE Insulated ACSR Raccoon or equivalant (3 conductors) after fitting insulators, binding conductors to pin insulators using suitable tie and anchoring with wedge type anchoring clamps including cutting and removing tree branches wherever necessary excluding cut point works. |
| 18 | Fiting One No MVT on existing cross arm excluding termination work (for One phase) of any rating for 11 kV AB Cable |
| 19 | Fitting and providing one Strut using HT PSC pole including digging and back filling pit in ordinary soil. |
| 20 | Fitting and erecting one HT A type Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 21 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 22 | Providing concrete muffing of size 0.45x0. 45x1.5m (0.5m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm) 0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5sides. |
| 23 | Additional rate for excavation of Pit for A type pole in Soft Rock. |
| 24 | Fitting one set AB switch on existing DP, giving connection and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing. |
| 25 | Drilling hole of various sizes on existing Channel/Cross Arm. |
| 26 | Fitting one LT 2 line cross arm on HT or LT existing poles including fitting insulators and binding the same with LT Line. |
| 27 | Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 28 | Dismantling (without damage) one Channel cross arm from existing DP structure and bringing back to section store. |
| 29 | Stringing of one km 11kV line with ACSR Raccoon (3 conductors) after fitting insulators and giving jumper connections including cutting and removing tree branches wherever necessary excluding cut point works. |
| 30 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 31 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 32 | Transferring LT single phase 2/3 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete. |
| 33 | Dismantling (without damage) one km 11kV line (three conductors) including dismantling cross arm, insulators, disc, disconnecting jumper connection, rolling the conductor and stacking the materials. |
| 34 | Dismantling one damaged 11kV PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 35 | Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 36 | Dismantling (without damage) one HT stay including digging pit in all classes of soil and backfilling, and bringing back to section store. |
| 37 | Dismantling (without damage) one AB switch from existing structure and bringing back to section store. |
| 38 | Dismantling (without damage) one V cross arm/Channel cross arm from existing Pole and bringing back to section store. Please Enable Macros to View BoQ information |