| 1 | Height Raising of boundary wall |
| 2 | Entry gate (Behind Guard post) |
| 3 | Brick work with common burnt clay F.P.S (non modular) bricks of class designation 7.5 in superstructure above plinth level in all shapes and size in cements mortar(1:4) (As per direction of EIC |
| 4 | 12 mm cement plaster finished with a floating coat of neat cement of mix |
| 5 | Outer wall, Inner wall, Top of the Wall |
| 6 | Behind Pump house |
| 7 | Brick work with common burnt clay F.P.S (non modular) bricks of class designation 7.5 in superstructure above plinth level in all shapes and size in cements mortar (1:4) (As per direction of EIC). |
| 8 | 12 mm cement plaster finished with a floating coat of neat cement of mix |
| 9 | Outer wall, Inner wall , Top of the Wall |
| 10 | Behind Old Office builidng |
| 11 | Brick work with common burnt clay F.P.S (nono modular) bricks of class designation 7.5 in superstructure above plinth level in all shapes and size in cements mortar (1:4) (As per direction of EIC). |
| 12 | 12 mm cement plaster finished with a floating coat of neat cement of mix |
| 13 | Out wall, Inner wall, Top of the Wall |
| 14 | Painting of Boundary wall, Guard post, transit shed etc, Finishing walls with water proofing cement paint of required shade, Old work (one or more coats applied @2.20 kg/10 sqm) over priming coat of primer applied @0.80 litrs/ 10 sqm complete including cost of Priming coat (As per direction of EIC) |
| 15 | Boundary Wall |
| 16 | At Entry Gate (Behind Guard post) |
| 17 | Side of Entry Gate to Back side of portable cabin |
| 18 | Back side of portable cabin to Fire pump |
| 19 | Side of Temple to DGPS |
| 20 | Fire pump Room (Exterior) |
| 21 | Guard Post (Exterior) |
| 22 | Transit shed (Exterior) |
| 23 | Cemented Railing (Infront of Transit shed to High level jetty) of all side (length, width & height) |
| 24 | Cemented kerb |
| 25 | Installation/fixing of Fire pipe at low level jetty. |
| 26 | Lifting of fire pipe at low level jetty (As per direction of EIC). (2 nos. of labour for 01 day) |
| 27 | Fixing of fire pipe at low level jetty, including Man & Material as required. Please Enable Macros to View BoQ information |