| 1 | Area clearing/jungle clearing by manually/mechanically which is causing hindrance along the alignment of fencing about 2.50 meter in width including uprooting of rank vegetation, grass, brush wood, trees and saplings and removal of rubbish, finally levelling the boundary to the natural slope of the land complete as per the direction of engineer in charge and scope of work. |
| 2 | Earth work excavation Up to 1.50 m depth for foundation, drains etc in all classes of soil except hard rock requiring blasting including filling in basement , back filling the excavated portions and sides of foundation with the spoil earth in layers, breaking clods, watering, ramming, consolidating, conveying and depositing the excess spoil or filling in low lying area and levelling withinan initial lead of 50 m and lift upto 1.5 m |
| 3 | Plain cement concrete 1:2:4 mix with 20mm and downgrade hard granite broken stones or lean mix, including all charges for shuttering, mixing concrete, laying, consolidating, curing, including cost of cement of approved make etc. complete for foundation/ levelling course, flooring, etc. |
| 4 | Providing and fixing reinforcement to RCC works at all levels with MS or deformed bars including all charges for steel, uncoiling and straightening rods, cutting rods, bending cold, placing in position and tying with black annealed tying wire of 22 gauge, cost of wire etc. (The reinforcement shall be of Tata /vizag/ Sail make.) |
| 5 | Supplying and fixing pre-cast RCC fencing posts 150 x 150 mm in section and 2.50 m long in cement concrete 1:2:4 mix using 20 mm and downgrade hard granite broken stones including all charges for shuttering, mixing ,laying ,consolidating ,curing, cost of cement, providing necessary holes for drawing barbed wire through,conveying carefully and fixing in position to lines and levels , etc complete but excluding cost of reinforcement. |
| 6 | Providing new barbed wire fencing with new GI barbed wire drawn through the holes provided in the fencing post or by buckling the pins posts including dipping in hot asphalt 80/100, tightening to full rigidity without any sagging etc. complete with 2 strand 4 points type II barbed wire. including cost of all materials and labour etc.(2.5 mm dia line wire and point wire with barbs at a distance of 75mm) including disposal of debrices at places pointed out anywhere within the company premises. etc. |
| 7 | Supply of unskilled labours for miscellaneous works - Unskilled labour- MALE - with all tools and tackles required for carrying out miscellaneous civil works other than in the schedule of works (unit rate shall be for manday of 8 hrs.) Please Enable Macros to View BoQ information |