|
| 1 | Surface Dresśing of the gro\Jnd in any kind of soil including removing vege tation inequaIiti‹ s nc! exceeding 1ú cm depth ‹tn d disp cs al of the ruUbi I›within a lead upto /S m as dii ectetJ. |
| 2 | Earth work in excavat'on uf fuunJatiun trenches or drains, in all sorts ct soil (includii1{ț mixed soil hut excluding latei ite ur sa\\"ndstonc) including removing, spreading or stacking the spoils within a lead of 7S m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ranaming the bottom, bailing out water as requii ud «omplcte.(a) Depth of excavation not exceeding 1,500 mm. |
| 3 | Earth work in fiIlir\g in fou‹1datior\ trenches or pIir\th with good earth, in loyers not etc ceding 1S0 mm. including watering ar\d ramrniiat, etc. I‹tyer by layer complete. (Payment t‹› be made on tf›e basis of measurement of finished cjuantity uf work)(a) With earth obtained fi rJrn cxcavation uffoundation. |
| 4 | (A) Fi!ling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidatin{› the sï›me by tł›urough s»turatior› with watur, ramming complet.e including the cost uf supply of sat›d. (payment to be made on measurement of |
| 5 | Single Brick Flat Suli n{* u I pickud jharria hi icksincluding rainmint* anrl c!re ssing Ueó to proper level and filling joints with local sand. |
| 6 | 7.5mm. t ftick ther:I\› {›ruuf cour s‹* w ith ct rr\en Icor›rrete with stone t:mips (1:1. :3) |with t,°raded stune aȘgrrgate 10 mm nr›rninaI sizej aiid admi.xture of water t›roofing compuund as per ri›anufact‹/rer's speci(icatiun followed by two cuat uf puly'mer ba sed p‹\int, (1st coat after 4 to 5 days cf cun«rete la /it‹łś and 2 n¢ł coat just be form th ick mascn ry work) asdirected (cost of woter proofing* compound & pulymur based p4t itd o be pa id scp‹ rate ly) t Cl cq utrin{' nut rtquirf'd |
| 7 | PseUal S H: Brick work with 1st class bricks in cement mort»r (1:6) (a) In foundation and linth Brick WorkSte s„ |
| 8 | BUIL SCH: P-16 1-16.125 mm. thick brick work with 1st class bricks in cement mortar (1:4)a In su erstructure Ground floorBrick Work Para et wall Less Door Less Counter |
| 9 | Ordinary Cement Concreet with graded (20mm size) excluding suttering in ground floor and foundation (As per Rate analysis) |
| 10 | BUIL SCH: P-26, 1-10. Ordinary Cerrient concrete (mix 1:1.5:3) with graded sto‹ e chips (20 mm nominal size) excluding stuttering and reinforcement if any, in ground floor os perrelevant IS codes. |
| 11 | Hire and labour charges fcr shuttering with centeringand necessary staging upto 4 m using approvc°d stout props and thick hard wood planks of appr oved thickness with requirecT oracing for concrete slabs, beams and columns, lintels curved or strai/jht including fitting, tixirlg and strikinP out afteryomoi • ‹n ‹›f works luato roof of |
| 12 | 6UIL SCH: P-43 1-40Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removalof loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every interstc tion, complete as per drawing |
| 13 | BUIL SCH: P-64, 1-35 Supplying, fitting & fixing 1st quality Ceramic tiles inwalls and floors to match with the existing work & 4 nos. of key stones (10mm) fixed with araldite at the back of each tile & finishing the joints with white cement mixed with colouring nxide if required to match the colour of tiles including roughening of concrete surface, if necessary ur by synthetic adhesive & grout materials etc. |
| 14 | Artificial stone in fluor, da‹Jo, staircase etc wil'h ce ne!›tconcrute (1:2:4) with stonu chips, laid ii\ pui›cIs as clirected with topping made with ordinary or white cemen I (as necessary) and marble dust in proportiui› (1:7.) including smooth finishing and rounding off corners including raking out joints or ruughcnint; cf concrete surface ‹›r\d |
| 15 | gUIL SCH: P-10§ I-*1A (a) M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows. railing etc. fitted and fixed with necessary screws and lugs in ground floor. |
| 16 | BUIL SCH: P-189 1-01 Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).(Excluding cost of chipping over concrete surface](i) With 1:6 cement mortar(a) 20 mm thick plaster (Inside) |
| 17 | Neat cement punning about 1.Smm thick in wal!,dado, window sill, flcor etc. NOTE:Cement 0.152 cu.mper100 so m |
| 18 | BUIL SCH: P-192, 1-01.Labuur for Chipping of concrete surface before takingvp Plastering work. |
| 19 | BUIL SCH- P-1'?4 I-01White washing including cleaning and smuothcning surface thoroughly. |
| 20 | BUIL SCH: P-2IXI 1-01 (a) Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. |
| 21 | BUIL SCH- P-200. 1-02 (A) Painting with best quality synthetic enamel paint of approved makeand brand including smoothening surface by sand papering etc. includingusing of approved putty etc. on the surface, if necessary :(b) On steel or other metal surface |
| 22 | Applying decorative cement based paint of approved quality after preparing the surface including scraping the same thoroughly (plastered or concrete surface) as per manufacturer's specification. (iii) Two coats. [P- 197,Item No.15) |
| 23 | Providing & installing of Aquaguard/Bluestar StorageWater Cooler Cum Purifier of water storage capcity 150 litres. 3 S.S faucets, with 2 sets of iron remover & Sediment filter with inbuilt pressure pump.(UV Based water purifire gum cooler Bluestar/Aquaguard) including I year warranty with AMC |
| 24 | (PWD Sanitary & Plumbing SOR VP -49, Item no 1 Labour for boring tube well of required dia. by water jet system through any type of soil strata including hire and labour charges for boring pipes, scaffolding, tools and plants as necessary and taking out them and lowering pipes, strainers, blind pipe etc. and fitting and fixing the same complete including bucket washing and other incidental works in the cunnec tion. The tube well should have a minimum 50 mm gap in betwwen the outside of the tubewell pipe and the bore. [ SI. No.-1) di), dii) & fi)]a) For depth upto 150 metre for 10 mm dia. Tube well with topenlargement of 80 mm dia. |
| 25 | Supply of PVC pipes & fittings Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes as per IS : 1239 (Part - I).[Pg 13ltem no 19-llll |
| 26 | Supplying PVC strainer of approved make with adapter conforming to I.S.12818 specifications. at work site. a) 40mm dia. [Page- 52/ SI. No.- 6ii)) |
| 27 | Supplying, fitting and fixing steel cutter piece upto 450mn\ long wirh sockets. a) 40mm dia {Page- 53/ SI. No. - 9ii)) |
| 28 | Nipple (150 mix long) 40 mm (Dia) [Pg-16 Item no F(iii) |
| 29 | Supplying, fitting and fixing plug of approved make conforming to LS. spe«ificatior›. a) 40rr›rn dia |Page- 53/ SI. No.- 10ii)] |
| 30 | Supplying, fitting and fixing heavy type PVC reducing sucketa) 80rnmx40mm |Page- 18 ,I Sl. No.- 19]iii}L}J |
| 31 | Sulvent Cernent (@ Rs.130.00 / 250 Gm.) al work site age- 19 / SI. No.- 19-0)] |
| 32 | SU T§TAg. firting and fixing G.I. Cap at top i) 100 mm dia.|Page- 54 / SI. Mo.- 18i)] |
| 33 | Washing and developing tube well with air compressor pump and engine for 8 (eight) hours continuous pumping per day with necessary arrangements for testing the yield in gallons per hour with ‘V’ notch including hire and labour charges for all tools and plants and scaffolding as required. (Page- 5S / SI. No.- ZO)] |
| 34 | Collecting sample of water for bacteriological and chemical test from any depth at any time during execution of work including hire and labour charge» tor tools and plants and sterilising the equipments, paying all charges and fees, testing etc. complete in all respect as per direction. [Page- 51 / SI. No.- 23] |
| 35 | Supplying , fitting & fixing submersible pump 1 H.P.ofKSB/CRI brand including control panel, 2.5 Sqmm Finolex cable 220V single phase , 6mm gauge steel wire rope(Usha martin Make), M.S. Clarnp Cap and iron cover with locking system etc. as per direction of Engineer-In-Charge. L.S. |
| 36 | Supplying P.V.C. water storage tank of approved quality with closed top with lid (Black)- MultiIayer(1000 Ltr) [Page- 37 / SI. No.- 6aJ |
| 37 | Labour for hoisting plastic water storage tank. (i) Upto 1500 litre capacly. (a) Upto 1st story fromG.L. [Page- 37 / SI. No.- 10i)-a)J |
| 38 | Labour for punching hole in plastic water storage tank upto 50 mm dia. [Page- 38 / SI. No.- 13J |
| 39 | Supplying, fitting and fixing PVC pipes of approved make of (medium duty) conforming to ASTMD -1785 and threaded to match with GI pipes as per IS : 1239 (Fart - I). With all necessary accessories, specials viz. socket, hend, tee, union, cross, elbo, nipple, longscrew, reducing »ucket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes, making threads, fitting, fixing etc. complete in all respect including cost of all necessary fittings as required, jointing materials and two costs uf painting with approved paint in any position above gruund. (Payment will be made on the centre line measureme«ts of toral pipe line includingBI! specials.loo seperate payment will be made for accesuries, specials. Payment for painting will be made seperately)i) For Exposed Work : PVC Pipes |
| 40 | Ref: PWD S & P V.P.12 item no. 19filISupply of PVC pipes & fittings Schedule 8(J (mcdiurr› dutyj conformingto ASTMD - 1785 and threaded to match with GI Pipes |
| 41 | Wiring with 1.1 KV grade single core PVC insulated stranded Copper wire in El conduit/GI conduit and painting 2x6 sqmm wire in 19 mmconduit incl. S&F {PWD Electrical Pg : E1 Item no 1d|Iv a rVt/ ml Frr |
| 42 | Supply and fixing 240V,5 watt LED lamp White withIU?_ Can as ner direction of EIC. |
| 43 | Supply, deliuary and fitting fixing the following itmes at site:e) 16 Amps. SP MCB(Make-Havells/L&T/Other approved make) |
| 44 | Distribution wiring in 1.1 KV grade 2x2Z/0.3 (1.5 sqmm) single core stranded 'FR’ PVC insulated & unsheathed copper wire (Brand approved by EIC) in suitable size PVC casing-capping(Precision make) with 1x22/0.3 (1.5 sqmm) single cure stranded ’FR‘ PVC insulated & unsheathed copper wire for ECC, incl. necy. fittings etc. to light/fan/call bell point with Modular type switch (Brand approved by EIC) fixed on Modular GI / PVC switch board with top cover plate on wallincl. mending good damages to original finish. [PVC casingcapping and Switch board both on surfacej Avg |
| 45 | Earthing with 50 mm dia GI pipe 3.64 mm thick x 3.04 Mts. long and 1 x 4 SWG GI (Hot Dip) wire (4 Mts. longj, 13 mm dia x 80 mm long GI bolts, double nuts, double washers incl. S &F 15 mm dia GI pipe protection (1 Mts. lung) to be filled with bitumen partly under the ground level and partly above ground level driven to an average depth of 3.65 Mts. below the ground level as below(PWDRlorrrirut crhpzIrat¥• ID nn Ww8 I |
| 46 | Supply, delivery & fitting fixing of the followinga) 16 A 5 pinplug socket (make-Havells) |
| 47 | Supllying fitting & fixing m0rble block( size 600mm X 450 mm) at the front side of water purifier cum chiller for wide visibility to the public”Embossing- |
| 48 | Supplying fitting fixing ” ’ with the stainless steellettering at the front side of water purifier & Cooler for wide visibility to the public Please Enable Macros to View BoQ information |