| 1 | Percentage BoQ BoQ_Ver3.0 Percentage Normal INR Only INR CIL Hide Select GST Registered Bidder under regular scheme GST Registered Bidder under composition scheme GST Unregistered Bidder Not Applicable Tender Inviting Authority: Staff Officer (Civil), WCL, Majri Area. Name of the Work / Contract No: Slope protection work by sand bag pitching cleaning and disilting of drain culverts and assistance of excavator ( JCB ) in mines area and Repair and maintenance of internal mine haul road , coal transporatation road, dump roads at NMUG to OC mine and NMOC Mine during mansoon period under New Majri Sub Area of Majri Area / ma9511cive044-25-26/711 Dated 12.03.2026 / Sr. No.01. . Category of services (To be selected by department) Category of bidder (To be selected by bidder) To be entered by department Service Tax Category ( To Be Selected by Bidder) ITC Available Works Contract Bidder's status (mandatory) Rate of GST (in %) Total GST(in Rs.) GST to be paid by bidder (in Rs.) GST to be paid by WCL (in Rs.) Name of the Bidder/ Bidding Firm / Company : Select 18.0 0.0 0.0 0.0 PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the bidder name and values only.) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # S. No. Item Description Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category Total amount inRs. P TOTAL AMOUNT With Taxes Total amount in words |
| 2 | Surface dressing of the ground including removing vegetation and in- equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50m and lift upto 1.5m. All kind of soils |
| 3 | Supplying and placing at position empty cement bags filled with OB/loose earth stitching the bags with thread and placing in position as directed complete as per insstruction of department |
| 4 | Deployment of excavator machine ( JCB or equivalent) including cost of opertator deisel , mobil oil etc. for levelling / road sides excavation and stacking within a lead of 50 meter etc. all complete job as per instructions of E.I. |
| 5 | Day to day cleaning of Hume pipes, culverts, making kutcha nallah etc. for proper passing of rain water at required places as per instruction of Engineer-in-charge by providing 2 menpower in a day with all safety measures. |
| 6 | Earth work in excavation by manual in drains (not exceeding 1.5 m in width )lift upto 6 m including getting out the excavated soil and disposal of surplus excavated soil as directed ,within a lead of 50 m with all safety measures etc. |
| 7 | Earthwork in excavation by mechanical means (Hydraulic excavator) in trenches/ drain in specified length width slope and lift upto 3.0 m and disposing the earth lead upto 50m as per direction of Engineer Incharge |
| 8 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. |
| 9 | Carriage of materials by mechanical transport including loading, unloading and stacking earth lead upto 1 km |
| 10 | Supplying and stacking at site. 90 mm to 45 mm size stone aggregate |
| 11 | Supplying and stacking at site.63 mm to 45 mm size stone aggregate |
| 12 | Supplying and stacking at site. Hard Moorum |
| 13 | Laying, spreading stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, in stages to proper grade and camber, applying and brooming requisite type of screening / binding material to fill up interstices of coarse aggregate, watering to the required density . |
| 14 | Day to day cleaning of mud/muckfrom road surface and culvert making raincuts on both sides of road, maintenance of berm and road side drains,kachha nallah etc.complete job & disposing the material within a lead of 50 mas per instruction of E.I.C.by engaging 4 men shift per day including necessary tools & plants |
| 15 | Total impact of GST for the purpose of CTC Total in Figures 2073751.5736000002 2073751.5736000002 INR Twenty Lakh Seventy Three Thousand Seven Hundred & Fifty One and Paise Fifty Seven Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 INR Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |