| 1 | Complete re-winding and re-insulation of 1 nos. of 315 KVA FLP TSU, Type T3sb315/6 with Sl.No. 7915398 and 1 Nos. 200 KVA FLP TSU, Type T3sob200/6 with Sl.No. 689291 for the main substation, Moonidih |
| 2 | 315 KVA |
| 3 | Supply of new Electrolytic copper conductor in place of burnt/damaged coils (HV & LV) |
| 4 | Stripping of old insulation of remaining HV & LV coils and re-insulation with proper grade of insulation as per the original design of all coils |
| 5 | Supply & Fitting of copper studs with nut and washer in LT side |
| 6 | Supply & Fitting of copper studs with nut and washer in HT side |
| 7 | Supply of additional insulating materials as per the original specification (Such as glass mica polyester tape, fibre glass tape, mica tube, prisponpaper, Dr. Beck barnish, Bectol red, brazing and soldering materials etc.) |
| 8 | Supply & fitting of copper jumper with lugs in HT side |
| 9 | Supply & fitting of copper jumper with lugs in LT side |
| 10 | Less scrap value of the damaged Copper coil |
| 11 | Labour cost for above job and maintenance of doors and flanges |
| 12 | 200 KVA |
| 13 | Supply of new Electrolytic copper conductor in place of burnt/damaged coils (HV & LV) |
| 14 | Stripping of old insulation of remaining HV & LV coils and re-insulation with proper grade of insulation as per the original design of all coils |
| 15 | Supply & Fitting of copper studs with nut and washer in LT side |
| 16 | Supply & Fitting of copper studs with nut and washer in HT side |
| 17 | Supply of additional insulating materials as per the original specification (Such as glass mica polyester tape, fibre glass tape, mica tube, prispon paper, Dr. Beck barnish, Bectol red, brazing and soldering materials etc.) |
| 18 | Supply & fitting of copper jumper with lugs in HT side |
| 19 | Supply & fitting of copper jumper with lugs in LT side |
| 20 | Replacement of epoxy molded bushing LT side |
| 21 | Replacement of epoxy molded bushing HT side |
| 22 | Less scrap value of the damaged Copper coil |
| 23 | Labour cost for above job and maintenance of doors and flanges |
| 24 | Transportation (UP DOWN) |
| 25 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |