| 1 | Earthwork in excavation in the canals / drainage channels / borrow pits / River bed / slope of bank as noted below as per designed section & throwing the spoils in layers of 25 cm. for aking banks as per profile or to deposit the same in any other place within an initial lead of 30 metre and initial lift of 1.5 metre including breaking clods, rough dressing etc. complete as per direction of the Engineer-in-charge. (a) Ordinary soil / local soil / soil mixed with moorum or kankar / silt, dry or moist / slushy silt / sticky soil. |
| 2 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary anddepositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge withina lead of,NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking.Beyond 4.00 km and upto 5.00 km |
| 3 | Extra rate over Item Nos.1 for all kinds of soil for every additional lift of 1.50 metre or part thereof beyond the initial lift of 1.50 metre.1 No of Lift = |
| 4 | 2 No of Lift = |
| 5 | 3 No of Lift = |
| 6 | 4 No of Lift = |
| 7 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means.upto 3 m depthWithout pumping out water and shoring |
| 8 | Making rectangular sausage cage with 10 SWG galvanized iron wire of 125mm. x 125mm. mesh wire netting with proper lapping of minimum 150 mm. including sewing the joints with 12 SWG G I wire and supply of all materials and equipments including placing the sausage cage in position, filling the same with boulder or lump agreegates complete as per direction of the Engineer-in-charge but excluding the cost of boulder / lump aggregates and its carriage upto site.(Cost is excluding the cost of end pieces)1.20 metre x 0.90 metre nominal section |
| 9 | 0.60 metre x 0.45 metre nominal section |
| 10 | 0.75 metre x 0.45 metre nominal section |
| 11 | 1.20 metre x 0.60 metre nominal section |
| 12 | 0.90 metre x 0.60 metre nominal section |
| 13 | 1.35 metre x 0.60 metre nominal section |
| 14 | 1.05 metre x 0.60 metre nominal section |
| 15 | Supplying, fitting, fixing end pieces for rectangular / square / circular sausages at the ends, with 10 SWG / 8 SWG G I wire net of different mesh sizes tying & sewing the same maintaning a lap langth of 150 mm all around with 12 SWG G I wire complete, including the cost of supply of wire netting,fitting etc, complete as per direction of the Engineer - in - charge.Mesh size 125 mm x 125 mm with 10 SWG wire |
| 16 | Supplying at site High Density Polyethylene (HDPE) bag of size 0.84 m x 0.38 m conforming to BIS : 14252 : 2015 for bank protective works including all cost of cost of transportation on road by all means, including other incidental charges complete. |
| 17 | Labour charges for filling HDPE bags with filler materials (earth/sand),machine stitching the open end of the bag with thread as per designand placing the same on slope or dumping from bank within initial lead of 30m and all lifts including carriage and hire charges of all materials and equipments but excluding the cost of filler materials as directed byEngineer-in-Charge (Volume of earth/sand filled bag should not be less than 0.0328 cum). |
| 18 | Supplying at site and laying in position UV stabilized polypropylene woven geotextile of 430 gsm as filter, as per specification, including cost of preparing the bed, placing the geotextile as per profile with at least 15cm lapping, wherever required and anchorage at top, sewing / welding the overlapped portion, storage and transportation by all means, complete as per direction of the Engineer-in-charge.Note: 1. Payment to be made on measurement of finished surface without lapping, but including anchoring length at top.2. Payment will be made subject to the result of 3rd Party Testing, to be done by the Engineer-in-charge departmentally. Paragraphs 2.7.7, 2.7.9 and 2.7.10 under the Chapter of \\"Specification for Works” in the USoR shall be reproduced and included in the tender document as “Specification & Special Terms & Conditions for Geotextile” in case of use of this item in the estimate.3. This particular item is to be used in special cases, either in continuation of previous usage or after offering adequate justification from techno-economical angles. |
| 19 | Supply of stone/ laterite boulders at site (from Stackyard Jhargram) each weighing 20 kg and upto 40 kg including cost of material, loading, unloading including stacking and carriage and including all incidental charges like Royalty complete. (Royalty certificate in original from competent authority are to be submitted along with the bill, otherwise amount due towards Royalty of stone/ laterite boulder will be deducted from the bills of works.) Following rates of royalty are to be considered till further modification of prevailing rates by the Department of I dustry, Commerce & Enterprises, Govt. of West Bengal for Pachamil sourced stone boulder and laterite boulder and by the Department of Mines & Geology,Government of Jharkhand for stone boulder of Pakur variety a) Panchami source : Rs. 53 per Cumb) Pakur source : Rs.105 per Cumc) laterite boulder : Rs. 36 per Cum |
| 20 | Labour charge for dumping / laying of Laterite / Stone Boulders / Shingles / Brick Bats, from stack of worksite with all leads and lifts in water or spreading the same on the slope of the bank of River/Sea or the slope of the embankment or in the River/ Sea bed to an uniform thickness as per direction of the Engineer-in-charge including cost of all accessories and other incidental charges.(a) Boulder 20kg & above where boats are not necessary. |
| 21 | Extra rate over item no -19 for carrying boulder by head load for each additional lead of 50 metre or part thereof beyond initial distance of 50 metre, upto a distance of 200 metre3 Nos lead |
| 22 | Cutting uprooting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by Engineer-in-charge. |
| 23 | Providing & fixing Concrete Sign Board as per IRC specification of size 900 x 750 x 37 mm. thick made with RCC 1:1½:3 with pakur variety stone chips reinforced with double layer IRC febric (75 x 75 mm. mesh) and fixed with necessary nuts & bolts on two RC precast posts 100 mm. x 150 mm. of height 2.65 m. of which top 750 mm. is of section 100 x 13 mm. and 1.90 metre above GL & 0.75 metre below GL including digging hole, repacking the same with cement concrete 1:3:6 with jhama khoa or with local stone chips etc. complete including painting two coats on both faces lettering sign marks etc. as per direction of the Engineer-in-Charge. (The rate is inclusive of cost of reinforcement, concrete, shuttering, nuts & bolts, washer etc. complete.) |
| 24 | Sand filling in foundation trenches and at the back of abutments, wing-walls etc. with good local sand free from earth in layers not exceeding 15 cm. including inundating each layer by profuse water and poking and ramming layer by layer complete including supply of sand. Quality of sand is to be approved by the Engineer-in-charge. Note : 1. Labour rate per m³ is provided; Cost of sand is to be added to arrive at the complete item rate. 3. Compaction factor of dry clean sand is 0.835. |
| 25 | Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. |
| 26 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mmnominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. Pakur Variety |
| 27 | Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction.Where staging is not required. |
| 28 | Caulking joints of laterite / stone boulder or Brick pitching with cement mortar 1:4 and flush pointing as per direction of the Engineer-in-charge.Stone / laterite boulder pitching Please Enable Macros to View BoQ information |