| 1 | 01.Construction of 3.0 m RCC Slab culvert at Balasupramniya Near house in Theruku Rajan Voical in Thulsapuram Paanchayat |
| 2 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead and lift including all labour charges and incidental charges such as shoring strutting providing coffer dams baling out water and other item which may be necessary or convenient to the successful completion of the excavation to the bottom of foundation and of back filling in a compacted condition a quantity of materials not |
| 3 | Supplying and filling with good river sand including cost and conveyance of sand from approved sources to worksite and stacking the same to departmental metric gauge for taking premeasurement laying layers of not more than 150mm thick watering and tamping with all leads for soft water and including labour charges and all other incidental charges etc. complete as per standard specification for C.D. works |
| 4 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m3 |
| 5 | Cement concrete 1:3:6 mix using 40mm ISS size HBG metal including all cost and conveyance of materials from approved sources to worksite including cost of cement which will be suplied by the department at the rate and place as specified in the special conditions appended including handling charges for the same cost of form work whenever necessary baling out water labour charges for mixing concrete laying compacting curing with all leads for good water including hire and fuel charges for all T&P employed and all other incidental charges etc. complete complying with standard specification for foundation concrete for C.D. works |
| 6 | Cement concrete 1:3:6 mix using 40mm ISS size HBG metal including all cost and conveyance of materials from approved sources to worksite including cost of cement which will be suplied by the department at the rate and place as specified in the special conditions appended including handling charges for the same cost of form work whenever necessary baling out water labour charges for mixing concrete laying compacting curing with all leads for good water including hire and fuel charges for all T&P employed and all other incidental charges etc. complete complying with standard specification for foundation concrete for C.D. works. |
| 7 | Cement concrete 1:2:4 mix using 20mm ISS size HBG metal including all cost and conveyance of materials from approved sources to worksite including cost of cement which will be suplied by the department at the rate and place as specified in the special conditions appended including handling charges for the same cost of form work whenever necessary baling out water labour charges for mixing concrete laying compacting curing with all leads for good water including hire and fuel charges for all T&P employed and all other incidental charges etc. complete complying with standard specification for bed block concrete for C.D. works |
| 8 | Reinforced Cement concrete 1:1 1/2:3 mix using 20mm ISS size HBG metal including all cost and conveyance of materials from approved sources to worksite including cost of cement which will be suplied by the department at the rate and place as specified in the special conditions appended including handling charges for the same cost of form work whenever necessary baling out water labour charges for mixing concrete laying compacting curing with all leads for good water including hire and fuel charges for all T&P employed and all other incidental charges etc. complete complying with standard specification for bed block concrete for C.D. works |
| 9 | Supplying and fabrication to steel Fe 415 (Tor. Steel) required for reinforced cement concrete work including cost and conveyance of steel to work spot handling charges for the rods straightening cutting bending, tying grills using binding wire (No welding should be done to steel item) hoisting placing positioning binding wire, provision of space hard cover blocks necessary stays and supporting devices including labour materials hire charges for all tools and plants employed and all other incidental charges, etc. complete as per standard specification for C.D. works @ Km |
| 10 | Supply and errecting of shuttering including of all charges etc. complte |
| 11 | Supply and errecting of centering including of all charges etc. complte |
| 12 | Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab |
| 13 | Providing and fixing Tar Paper for Bearing Between Bed Block and Deck Slab |
| 14 | Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, |
| 15 | Providing and fixing 100mm Dia Ac Pipes for Weep Holes in Abutument |
| 16 | Providing andName Board |
| 17 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \\"BB\\" for all works in this package} 18% for other than Earth Quantity Please Enable Macros to View BoQ information |