| 1 | Earthwork excavation in all classes of soils and depositing on bank with an initial lead and liftsuch as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom,and hard stiff, black cotton soil, red earth, earth mixed with |
| 2 | Filling with good river sand into foundation and basement including cost and conveyance ofall materials to work site and all labourcharges for filling, watering etc., complete. |
| 3 | CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials towork site and all labour charges for mixing, laying and watering etc., complete. |
| 4 | Reinforced Cement concrete 1:1.5:3 mix using 20mm ISSHBG metal from approved sourcesincluding cost and conveyance of all materials to work site and all labour charges for mixing,laying, and watering etc., complete. Above basement |
| 5 | Brickwork in CM 1:5 mix using country bricks of standard size including cost and conveyanceof all materials to work site and including all labour charges and all incidential charges etc.,complete. Upto basement |
| 6 | Brickwork in CM 1:5 mix using country bricks of standard size including cost and conveyanceof all materials to work site and including all labour charges and all incidential charges etc.,complete. For Superstruture. |
| 7 | Special ceiling plastering in CM 1:3 –10mm thick including cost and conveyance of allmaterials and all labour charges etc., complete. |
| 8 | Plastering in CM 1:5 ,12mm thick including cost and conveyance of all materials to work siteand all labour charges etc., complete. |
| 9 | Flooring with Granolithic flooring to 25mm thick using CC 1:2:4 mix using 20mm ISSHBGmetal including cost and conveyance of all materials to work site and all labour charges etc.,complete.. |
| 10 | Painting the newly plastered wall surface with two coats of Plastic Emulsion Paint outside thebuilding over one coat of cement primer including clearing the surface in all floors etc.,complete as per standard specification. |
| 11 | Painting two coats with ready mix paint of approved colour and trade for doors & windowsincluding cost and conveyance of all materials and all other labour charges etc., complete. |
| 12 | Supplying and erriecting, centring for plane surfaces structures such as RCC slab, beam etc.,inlcuding strutting upto 3m height using mild steel sheets of size 90cm x 60cm x and B.G 10stiffened with M.s angles of size 25 mm x 25mm x 3mm for boarding lai |
| 13 | Supplying and erriecting, centring for plane surfaces structures such as RCC slab, beam etc.,inlcuding strutting upto 3m height using mild steel sheets of size 90cm x 60cm x and B.G 10stiffened with M.s angles of size 25 mm x 25mm x 3mm for boarding lai |
| 14 | Supply and fabrication of steel including cost and conveyance of steels to worksite includinglabour for cutting, jointing and welding if necessary including all labour charges for dyingwith binding wire etc., complete. |
| 15 | Supplying Steel Door and windows as per standard specification |
| 16 | Towards Labour charges for Fixing of Steel Doors |
| 17 | Wiring with 2 x 1.50 sqm ( 22/0.3 ) PVC insulated unsheathed single core Copper Conductorof 1100 v Grade in suitable PVC Rigid Pipe on wall and ceiling with PVC accessaries with TWSwitch box with 5 A F . T . Switch with painting of suitable colour for Light Point and FanPoint ( For Electronic Regulator ) S D N o 18 |
| 18 | Supply and fixing of 15w CFL Lamp (spiral lamp) for existing holder on wall etc complete. |
| 19 | Supply and fixing of 16amps DP Switch with metal clod of 500v with tube connection32Amps and netural on suitable T.W Plug plante with supplying on reeper on Either sideWith PWD Earthen etc. |
| 20 | Supply and run of 2 of 6s.qm 84/100 pvc SC Unstrenthed on condition of 1100v grade in25mm side GI Pipe lend with both ends with necssary angles etc |
| 21 | Provision for Name Board Please Enable Macros to View BoQ information |