|
| 1 | EARTH WORK EXCAVATION IN ALL SOILS AND SUB SOILS EXCLUDING ROCK INCLUDING BACKFILLING IN SIDES OF FOUNDATIONS AND BASEMENT, WATERING, CONSOLIDATION, INCLUDING DEWATERING WHEREVER NECESSARY, ETC., AND DISPOSING OFF THE SURPLUS EARTH WITHIN A LEAD OF 40 MTRS AS DIRECTED IN DEPTH FROM GROUND LEVEL TO -2 MTR. |
| 2 | SUPPLY AND LAYING OF FLY ASH BRICKS IN SUPER STRUCTURE IN CM 1:6 INCLUDING SCAFFOLDING, CURING ETC., COMPLETE ABOVE +0.00 MTR TO +7.00 MTR |
| 3 | BRICK MASONRY WITH APPROVED QUALITY CHAMBER BURNT BRICKS / FLY ASH BRICKS IN HALF BRICK THICK WALL IN CM 1:4, EXCLUDING PLASTERING, INCLUDING SCAFFOLDING, CURING ETC., COMPLETE AT ALL LEVELS. |
| 4 | PREPARE SURFACES OF WALLS AND PLASTER INTERIOR, EXTERIOR AND TOP FACES WITH CEMENT MORTAR, 12MM THICK IN CM 1:4 INCLUDING NECESSARY SCAFFOLDING AND CURING ETC., COMPLETE FROM FFL TO +7.00 MTR LEVEL. |
| 5 | CEMENT CONCRETE M25 USING 20MM SIZE BLUE GRANITE AGGREGATE FOR ALL CEMENT CONCRETE ITEMS SUCH AS COLUMN, BEAM, SUNSHADE, SHELL WALL, ROOF SLAB, STAIRCASE, ETC., EXCLUDING SHUTTERING BUT INCLUDING LEVELLING, CURING, ETC., COMPLETE ABOVE FFL TO +7 MTR LEVEL. |
| 6 | FORM WORK - WROUGHT AND PUT UP WITH GOOD QUALITY MARINE GRADE PLYWOOD FOR ALL TYPES OF SHUTTERING WORKS LIKE COLUMN, BEAM, SUNSHADE, SHELL WALL, ROOF SLAB, STAIRCASE, ETC., AS \\"PLASTER FREE FINISH\\" ABOVE FFL TO +7 MTR LEVEL. |
| 7 | THOROUGHLY PREPARE SURFACES AND LAY PRESSED CLAY TILES OF SIZE 9\\"X9\\" OR 8\\"X8\\" AND LAY TO PROPER SLOPE IN CM 1:3, 20MM THICK BED MORTAR MIXED WITH 5% OF CRUDE OIL BY WEIGHT OF CEMENT AND POINTING THE JOINTS WITH THE SAME OILED MORTAR, CURING ETC., COMPLETE AT ALL LEVELS. |
| 8 | PREPARE SURFACES OF BASE COURSE BY REMOVING ALL LOOSE MORTAR BY HACKING AND LAY TO REQUIRED SLOPE 50MM THICK GRANO FLOOR OF MIX 1:1.5:3 USING 10 TO 12MM GRANITE CHIPS INCLUDING FINISHING THE TOP LAYER WITH A POWER TROWEL AND FLOOR HARDENER WHICH IS SUPPLIED BY TNPL FREE OF COST AT ALL LEVELS. |
| 9 | PREPARE SURFACES OF BASE COURSE BY REMOVING ALL LOOSE MORTAR BY HACKING AND LAY TO REQUIRED SLOPE 25MM THICK GRANO FLOOR OF MIX 1:1.5:3 USING 10 TO 12MM GRANITE CHIPS INCLUDING FINISHING THE TOP LAYER WITH A STEEL TROWEL AND FLOAT WHILE LAYING WITHOUT ANY ADDITIONAL CEMENT OR MORTAR AT ALL LEVELS. |
| 10 | CEMENT CONCRETE 1:2:4 USING 20MM AND DOWN GRADED BLUE GRANITE AGGREGATE IN 75MM THICK PRECAST COVER SLAB FOR SHELVES/DRAINS EXCLUDING REINFORCEMENT BUT INCLUDING NECESSARY FORMWORK, FIXING IN POSITION, PERFORMING THE EDGES OF REBATES OF DRAINS TO STRAIGHT LINE,FINISHING THE TOP SURFACE SMOOTH IN ALL FLOORS. |
| 11 | SUPPLYING OF WALL TILES OF APPROVED MAKE, SIZE AND DESIGN / SHADE AND FIXING THEM IN POSITION FOR WALLS WITH BED MORTAR IN CM 1:3, 20MM THICK, PREPARING THE SURFACES AND POINTING THE JOINTS WITH TILE MAT COMPOUND AS DIRECTED BY ENGINEER INCHARGE. |
| 12 | SUPPLYING AND FIXING OF CERAMIC FLOOR TILES ANTI SKID OF SIZE 300 X 300MM X 8MM THICK OF APPROVED MAKE AND SHADE WITH BED MORTAR IN CM 1:3, 20MM THICK TO DESIRED SLOPE AND POINTING THE JOINTS WITH TILE MAT COMPOUND, CURING, ETC., COMPLETE AT ALL LEVELS FOR TOILETS. |
| 13 | FOR SMALL WORKS WHICH IS UNQUANTIFIED EXACTLY, SUPPLY OF ELECTRICAL CONCRETE BREAKER (BOUSH MAKE -MODEL NO.11E) WITH LABOUR FOR DISMANTLING OF COCNRETE, BRICK WORK, CR MASONRY, ETC., THE WORK INCLUDES DISPOSAL OF DISMANTLED DEBRIS WITHIN THE LEAD OF 2KM APART AS DIRECTED. |
| 14 | DISMANTLING OF RCC M20/M25 CONCRETE WITH BREAKERS AND CUTTING OF THE STEEL REINFORCEMENTS, ETC., AND DISPOSE OFF THE DEBRIS TO A LEAD OF 2 KM APART AS DIRECTED. |
| 15 | CHIPPING OF WEAK / CRACKED PORTION OF DAMAGED RCC STRUCTURE AND APPLYING ONE COAT OF ZINC RICH EPOXY ANTI CORROSIVE PRIMER FOR REINFORCEMENT ROD AT ALL LEVELS AS DIRECTED BY ENGINEER INCHARGE. THE RATE INCLUDES SCAFFOLDING ALL CONSUMABLES, TOOLS AND TACKLES ETC., COMPLETE. |
| 16 | PREPARE SURFACES OF EXISTING RCC STRUCTURES AND PLASTER WITH CM 1:3, UPTO 20MM THICK USING SBR - RG LATEX (DOSAGE - 200 ML / 50 KG OF CEMENT) INCLUDING COST OF SBR - RG LATEX, CURING, SCAFFOLDING, ETC. COMPLETE AT ALL LEVELS. |
| 17 | PROVIDING TEMPORARY PLATFORM BY USING PIPES / SCAFFOLDING MATERIAL AND LAYING OF WOODEN PLANKS TO REQUIRED HEIGHT PROVIDE TARPAULIN OVER THE PLATFORM TO AVOID FALLING OBJECT ABOVE THE MACHINERY, ALSO REMOVE THE TEMPORARY PLATFORM AFTER COMPLETION OF THE WORK AS PER ENGINEER INSTRUCTION AT ALL LEVELS. |
| 18 | PROVIDING MANPOWER ASSISTANCE FOR ATTENDING PIPELINE WORKS - PLUMBER |
| 19 | PROVIDING MANPOWER ASSISTANCE FOR ATTENDING MISCELLANEOUS CIVIL WORKS - MASON. |
| 20 | PROVIDING MANPOWER ASSISTANCE FOR ATTENDING MISCELLANEOUS CIVIL WORKS - CARPENTER |
| 21 | PROVIDING MANPOWER ASSISTANCE FOR ATTENDING MISCELLANEOUS CIVIL AND STRUCTURAL WORKS – HELPER FOR MASON / PLUMBER / CARPENTER / FITTER / WELDER, ETC., |
| 22 | UNSKILLED HELPER - PROVIDING MANPOWER ASSISTANCE FOR ATTENDING MISCELLANEOUS CIVIL WORKS. |
| 23 | SUPPLY AND APPLICATION OF TWO COMPONENT CEMENTIOUS ACRYLIC MODIFIED ELASTOMERIC BASED COATING AS SEAMLESS WATERPROOF MEMBRANE APPLIED IN TWO COATS (1.2 MM THICK) OF APPROVED MAKE LIKE THERMAX/BASF/SIKA ETC., |
| 24 | SUPPLY AND FIXING IN POSITION OF IWC OF PARRYWARE/ HINDUSTAN MAKE OF WHITE COLOUR OR ANY OTHER APPROVED MANUFACTURE OF ORISSA PAN OF SIZE 23\\" COMPRISING \\"S\\" OR \\"P\\" TRAP AT ALL LEVELS. THE COST INCLUDES DISMANTLING OF EXISTING DAMAGED WATER CLOSET AT ALL LEVELS. |
| 25 | TAKE DELIVERY OF HIGH STRENGTH RIBBED DEFORMED BARS/ MS BARS ISSUED BY TNPL FREE OF COST, CUT, BEND AND TIE UP IN POSITION INCLUDING COST OF SUPPLYING NECESSARY 18 GAUGE BINDING WIRE FOR ALL TYPES OF RCC WORKS AT ALL LEVELS. |
| 26 | SUPPLY OF CRACK FILLING MATERIAL BY CUTTING OF ‘V’GROOVE TO A WIDTH OF MORE THAN 5MM AT CRACK SURFACE AND APPLICATION OF POLYURETHANE SEALANT OVER THE JOINTS INCLUDING ALL TOOLS AND TACKLES, LABOUR ETC., COMPLETE AS DIRECTED BY ENGINEER IN CHARGE.MATAERIAL MAKE : BOSTIK(SEAL ‘N’ FLEX 1 ) BOSS OR EQUIVALENT. |
| 27 | THROUGHLY CLEANING THE EXISTING PAINTED SURFACES OF WALLS USING BUFFERING MACHINE. SCRAP THE EXISTING PAINTED SURFACE AND DISPOSE THE SAME AS DIRECTED. RATE INCLUDES LABOUR CHARGES AND ALL OTHER INCIDENTIAL CHARGES ETC., COMPLETE AT ALL LEVELS. |
| 28 | SUPPLY AND APPLICATION OF ONE COAT OF WEATHER PROOF EXTERIOR PRIMER AND TWO COATS OF EXTERIOR EMULSION OF APPROVED COLOUR SHADE INCLUDING SCAFFOLDING, LABOUR ETC., COMPLETE AT ALL LEVELS. (ASIAN OR BERGER). |
| 29 | SUPPLY AND APPLICATION OF TWO COATS OF SYNTHETIC ENAMEL PAINT OVER ONE COAT OF WALL (CEMENT) PRIMER INCLUDING SURFACE PREPERATION, NECESSARY SCAFFOLDING WHEREVER REQUIRED, ETC., AS DIRECTED. COMPLETE AT ALL LEVELS |
| 30 | TRANSPORT EXCAVATED EARTH / OTHER DEBRIS FROM INSIDE THE PLANT PREMISES AND FILL IN LOW LYING AREAS, INCLUDING SPREADING, LOADING, UNLOADING (25% VOIDS TO BE DEDUCTED IN LORRY/TRACTOR MEASUREMENTS) Please Enable Macros to View BoQ information |