| 1 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum |
| 2 | Supplying and filling in foundation and basement with filling Quarry Dust in layers of not more than 15cm.thick wellrammed watered andcompacted etc., complete complying with standard specification. |
| 3 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification |
| 4 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. |
| 5 | Plain Cement Concrete 1:2:4 (one cement, two fine aggregates and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification |
| 6 | Fabriction supply and erection of tubulor post with Truss(100mm,80mm,75mm) The Rate shall be include the cost of tobulor postTruss members,labour charges for manufacturing and erection and Painting etc., complete. as per departmental specification and drawings. |
| 7 | Supplying and fixing in position of best approved colour design and quality Polycarbonate Sheet of 6 mm thick with necessary 'U' or 'J' bolts, bitumen washers and cutting the Polycarbonate Sheet to the required size.etc. complete. |
| 8 | Providing and laying ,spreading and compacting 0.396 m3 of 45-22.40mm & 0.528 m3 of 22.40-2.36mm & 0.396m3 of 2.36mm and below metal graded stone aggregate to wet mix macadam (WMM ) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. |
| 9 | Fabricating, Supplying and fixing M.S.Pipe Posts for Chain Link 2\\" x 2\\" using 10Gauge Galvanized Iron Wire (of all sizes) Chain Link fencing of size100mm MS Pipe Below ground level of 60cm and above ground level of 2.40m including cost of steel and binding wire and laying cement concrete 1:2:4 20mm size |
| 10 | ADD GST 18% Please Enable Macros to View BoQ information |