| 1 | Site Investigation |
| 2 | 56.13:Providing access to the site clearing site and making good for surveying in order to provide clear line of site devoid of any hindrance due to vegetation etc. and clearing areas for station points (This item is applicable only for sites without access such as in case of new road formation, bridge and building sites at in accessible locations). |
| 3 | 60.11.2:Taking FLY LEVELS- from the nearest GTS BM and closing on the starting BM including conveyance of instruments etc along road or in heavily built up area or in roads with heavy traffic or in thick jungle ( out turn 4000 m / day ) |
| 4 | 60.11.1:FIXING TBM- Supplying and fixing TBM with RCC 1:1.5:3 pillar block having a size of 30*30*75 cm, steel reinforcement for RCC work, painting top and sides of pillar with synthetic enamel paint, lettering in the pillar block with 8cm high \\"TBM\\" on one face and the reduced level on the outer face, etc complete, fixed in CC1:3:6 using 40 mm metal 55*55*60 cm etc complete and centering and shuttering including strutting , propping and removal of form work for pillar and foundation. |
| 5 | OD14137/2024-2025:Conducting topographic survey in river for taking cross sections at suitable intervals and preparing contour maps showing 2m interval contours using Total Station or such approved methods showing all topographic features like culverts and crossings, survey stones and other permanent objects and the preparation and submission of maps at suitable scale (plan, cross sections, longitudinal sections etc,indicating the contour lines m2 interval ni digitized forms including supplying 5 numbers of soft copies CD/DVD, 5 numbers of hard copies of print outs etc complete as per the direction of departmental officers at site (outturn 6 hect/day |
| 6 | 56.1.a:Mobilization including transportation of all necessary plant and equipment's and materials of boring, field testing and sampling and demobilization after completing the work - For machine boring |
| 7 | 56.2.a:Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location - For machine boring. |
| 8 | 56.9.1:Erecting platform over 2 nos of 2nd Class Boat using Mango wood planks of not less than 30 mm thick, Mango wood joists of 100 mm x 70 mm at 60 cm intervals including labour and hire of all materials and dismantling the platform after completion of work etc complete. excluding hire of boats (A Platform of minimum size 6.00 m x 5.00 m will be required) |
| 9 | 56.10:Hire charges for providing 2 nos of 2nd Class boat with boatman for erecting the platform over which the boring plant is to be erected, and 1 no of 2nd Class boat with 1 boatman for conveying the departmental staff and labour engaged from the banks to platform and back etc. |
| 10 | 56.3.a.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. |
| 11 | 56.3.a.2:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For under water. |
| 12 | 56.4:Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under water and banks of river. |
| 13 | 56.11.a:Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate) - Machine boring for 5 bore holes. |
| 14 | 56.11.c:Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate) - Machine boring - Extra for additional set for bore holes exceeding 5 nos. |
| 15 | OD19752/2024-2025:Conducting topographic survey in bank of river for taking cross sections at suitable intervals and prepering contour maps showing 2m interval contour using total station or such approved methods showing all topographic features like culverts and crossings, survey stones and other permanent objects and the preperation and submission of maps at suitable scale (plan,cross section, longitudunal section etc)indicating the contour lines 2m interval in digitilized forms including supplying 5 numbers of soft copies CD/DVD, 5numbers of hard copies of print outs etc complete as per the direction of department officers at site (outturn 3 hect/day) Please Enable Macros to View BoQ information |