| 1 | Taking down Chowkhats or frames with shutters (without taking off shutters from the frames) not exc. 1.5 sq. m each, complete all as specified and as directed by Engineer-in-charge. |
| 2 | Taking down Chowkhats or frames with shutters (without taking off shutters from the frames) exc 1.5 sqm but not exc. 4.0 sq. m each, complete all as specified and as directed by Engineer-in-charge. |
| 3 | Dismantling timber scantlings 40 sq. cm and over in section, in any position and in unframed work, complete all as specified and as directed by Engineer-in-charge. |
| 4 | Demolition of Brickwork or stone/ boulder masonry, built in cement mortar including all quoins, arches, pillars, etc, complete all as specified and as directed by Engineer-in-charge. |
| 5 | Demolition of Cement concrete (unreinforced) of any description and in any position not otherwise specifically provided for, complete all as specified and as directed by Engineer-in-charge. |
| 6 | Demolition of reinforced Cement concrete of any description and in any position not otherwise specifically provided for, complete all as specified and as directed by Engineer-in-charge. |
| 7 | Demolition of reed, lathing, single or double, including battens and plaster or chicken wire lathing, complete all as specified and as directed by Engineer-in-charge. |
| 8 | Dismantling Plain or corrugated steel sheeting, any gauge, thickness, including Nainital or similar pattern roof coverings, complete all as specified and as directed by Engineer-in-charge. |
| 9 | Dismantling framed trussess (wooden) of span upto 10 mtr, complete all as specified and as directed by Engineer-in-charge. |
| 10 | Excavation in trenches n.exc 1.5m wide and n.exc 1.5 m in depth for foundation etc or for shafts, wells, cesspits, manholes, pier holes etc. and getting out in soft/loose soil complete all as per specified and as directed by Engineer-in-charge. |
| 11 | Returning, filling in, including spreading, leveling, watering and well ramming in layers n exc 25cm complete all as per specified and as directed by Engineer-in-charge. |
| 12 | Removing excavated material not exc. 50 m & depositing where directed at a level not exc. 1.5 m above starting point complete all as per specified and as directed by Engineer-in-charge. |
| 13 | M&L for Hardcore with broken stones/ boulders of gauge n exc. 63 mm, deposited, spread and levelled in layers n exc. 15 cm thick, watered and rammed to a true surface, complete all as specified and as directed by Engineer-in-charge. Please Enable Macros to View BoQ information |
| 14 | M&L for Hardcore with broken stones/ boulders of gauge n exc. 63 mm, deposited, spread and levelled in layers n exc. 15 cm thick, watered and rammed to a true surface, complete all as specified and as directed by Engineer-in-charge. Please Enable Macros to View BoQ information |