| 1 | SIDEPROTECTION |
| 2 | 2.7.D:Dismantling Stone Masonry as per Technical Specification Clause 202. Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202. (D) Dry Rubble Masonry |
| 3 | 3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 |
| 4 | OD50563/2024-2025:Dry rubble -Dry rubble masonry with departmental stone including all charges etc. |
| 5 | OD50564/2024-2025:Dry rubble masonry without through/bond stone in foundation and superstructure including packing to compactness to lines and levels,cost and conveyance of all materials,labour charges etc complete up to3m height |
| 6 | OD411635/2025-2026:Random rubble masonry (without through stone) in CM 1:6 complete as per drawing and technical specification including all cost and conveyance of materials ,labour etc. complete |
| 7 | OD469454/2025-2026:Construction of subgrade and earthen shoulders with approved material obtained form borrow pits with all lifts and leads transporting to site spreading ,grading to required slope and compacted to meet requirement of table 300.2 with lead upto 1000m as per technical specification clause 303.1 |
| 8 | OD111770/2025-2026:Supplying and fixing in place Granite name board of slab area less than 0.9 sqm including engraving and painting letters etc complete as per direction of Engineer in charge at site |
| 9 | DRAIN |
| 10 | OD51052/2024-2025:RING BUND Type II Putting up ring bund with earth filling gunny bags of top with 0.75m bottomwidth 1.5m height 1.5m side and filling in between with earth to form ring bund andmaintaining the same leak proof till the completion of the work and clearing the site bydismantling the bund after completion of the work etc. complete MODIFIED 60.1.2 |
| 11 | OD51053/2024-2025: Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pumpset including conveyance to site and erection, cost of fuel, lubrication oil and other stores, pay ofstaff etccomplete Modified 60.2.2 |
| 12 | 3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 |
| 13 | OD51084/2024-2025:DR packing under foundation-Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site |
| 14 | 11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I. P.C.C grade M 10 (i) Nominal mix 1:3:6 |
| 15 | 11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 IV. R.C.C grade M 20 |
| 16 | 11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 Please Enable Macros to View BoQ information |