|
| 1 | Appendix A-Covered Loading Area |
| 2 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) |
| 3 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. |
| 4 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil |
| 5 | 2.17.1:Close timbering in case of shafts, wells, cesspits, manholes and the like including strutting, shoring and packing cavities (wherever required) etc. complete (Measurements to be taken of the face area timbered).Depth not exceeding 1.5 m |
| 6 | OD9059/2025-2026: Based on approved OD from CTE .Coconut Pile - Supplying and stacking well matured straight 6m long coconut post avg dia 25cm for driving down through various strata bellow bed level including cost conveyance labour charges etc complete. |
| 7 | OD9893/2024-2025:Based on approved OD from CTE Coconut Pile - Driving down coconut pile to lines and levels through soft to medium clay soil strata including all hire charges and labour and all other appliances necessary for pile driving down after pointing the bottom end Details for one post of 6m long15 numbers per day 6x15=90m,Details for 90 m length. |
| 8 | 60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site. |
| 9 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 10 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete |
| 11 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 12 | 4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3graded stone aggregate 20 mm nominal size derived from natural sources) |
| 13 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete |
| 14 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more |
| 15 | OD10075/2024-2025:Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses hot dip galvanized TATA STRUCTURA make or equivalent including cutting, hoisting,fixing position and finishing with epoxy paint two or more coats including appropriate priming coat including welding and bolted with special shaped washers etc complete |
| 16 | 10.25.2:Item Shifted to Sub head 14 as item 14.73Item Shifted to head 14 as item 14.74Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works |
| 17 | OD9894/2024-2025:od6633/2021_2022 :Providing Aluminum Trafford profile sheet, powder sheet roofing including vertical/ curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with aluminum limpet washers filled with white lead, including a coat of approved steel primer and two coats of<br>approved<br>paint on overlapping of sheets complete ( up to any pitch in horizontal / vertical or curved<br>surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. |
| 18 | 13.52.1:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work |
| 19 | 12.41.2:Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes.110 mm diameter |
| 20 | 12.42.2.2:Providing and fixing on wall face unplasticised- PVC moulded fittings/ accessories for unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansionSingle pushfit Coupler110 mm |
| 21 | 12.42.5.2:Providing and fixing on wall face unplasticised- PVC moulded fittings/ accessories for unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansionBend 87.50110 mm bend |
| 22 | 13.6.1:20 mm cement plaster of mix:1:4 ( 1 cement : 4 coarse sand) |
| 23 | OD9895/2024-2025:Providing fly proof net in the sides and ceiling of shade provided in front of<br>new<br>auction<br>hall using nylone net<br>spl. data<br>details for 10m2 based on TS No 13/05- 06/CE<br>dtd<br>29)08)2005 Please Enable Macros to View BoQ information |