|
| 1 | Loading of Poles |
| 2 | ST Pole 8.0m Long |
| 3 | ST Pole 9.0m Long |
| 4 | ST Pole above 11Mtr. Flange type |
| 5 | ST Pole above 13Mtr. Flange type |
| 6 | Unloading of pole at road side and its carriage upto 25 Mtr. |
| 7 | ST Pole 8.0m Long |
| 8 | ST Pole 9.0m Long |
| 9 | ST Pole above 11Mtr. Flange type |
| 10 | ST Pole above 13Mtr. Flange type |
| 11 | Dragging/ Manual carriage of pole to site of work upto first 100 Mtr. |
| 12 | ST Pole 8.0m Long |
| 13 | ST Pole 9.0m Long |
| 14 | ST Pole above 11Mtr. Flange type |
| 15 | ST Pole above 13Mtr. Flange type |
| 16 | Dragging/ Manual carriage of pole to site of work for every subsequent 50 Mtr. |
| 17 | ST Pole 8.0m Long |
| 18 | ST Pole 9.0m Long |
| 19 | ST Pole above 11Mtr. Flange type |
| 20 | ST Pole above 13Mtr. Flange type |
| 21 | Loading of line material. |
| 22 | A.C.S.R conductor Squirrel /Weasel /Rabbit /Dog etc. |
| 23 | 11KV AB Cable/LT2.5Core/11KV PVC/XPLE Insulated Cable etc. |
| 24 | M.S channel/Angle/Flat/Nuts & Bolts/Guy wire/G.I wire etc. |
| 25 | Polymer/Porcelain items/ Insulator/Disc/Shackle/G.O Set/Link Set/D.O Set/LA etc. |
| 26 | Unloading and manual carriage of line material upto 25 Mtr. |
| 27 | A.C.S.R conductor Squirrel /Weasel /Rabbit /Dog etc. |
| 28 | 11KV AB Cable/LT2.5Core/11KV PVC/XPLE Insulated Cable etc. |
| 29 | M.S channel/Angle/Flat/Nuts & Bolts/Guy wire/G.I wire etc. |
| 30 | Polymer/Porcelain items/ Insulator/Disc/Shackle/G.O Set/Link Set/D.O Set/LA etc. |
| 31 | Manual carriage of line material to site of work beyond 25 Mtr. for first 100 Mtr . |
| 32 | A.C.S.R conductor Squirrel /Weasel /Rabbit /Dog etc. |
| 33 | 11KV AB Cable/LT2.5Core/11KV PVC/XPLE Insulated Cable etc. |
| 34 | M.S channel/Angle/Flat/Nuts & Bolts/Guy wire/G.I wire etc. |
| 35 | Polymer/Porcelain items/ Insulator/Disc/Shackle/G.O Set/Link Set/D.O Set/LA etc. |
| 36 | Carriage of line material manually to site of work for every additional 50 Mtr or part thereof. |
| 37 | A.C.S.R conductor Squirrel /Weasel /Rabbit /Dog etc. |
| 38 | 11KV AB Cable/LT2.5Core/11KV PVC/XPLE Insulated Cable etc. |
| 39 | M.S channel/Angle/Flat/Nuts & Bolts/Guy wire/G.I wire etc. |
| 40 | Polymer/Porcelain items/ Insulator/Disc/Shackle/G.O Set/Link Set/D.O Set/LA etc. |
| 41 | Erection of pole with X-arm/U-Clamp , Top-hamper pin clamp, insulator & braces ( with plantation depth equal ot 1/6th of the pole length) for HT/LT including pit excavation in all soil and Cement Bottoming as per REC Standards ammended upto date. |
| 42 | ST Pole 8 Mtr. Long |
| 43 | ST Pole 9 Mtr. Long |
| 44 | ST Pole 11 Mtr. Long flange type |
| 45 | ST Pole 13 Mtr. Long flange type |
| 46 | Erection of pole with X-arm/U-Clamp , Top-hamper pin clamp, insulator & braces ( with plantation depth equal ot 1/6th of the pole length) for HT/LT including pit excavation in all soil and without Cement Bottoming as per REC Standards ammended upto date. |
| 47 | ST Pole 8 Mtr. Long |
| 48 | ST Pole 9 Mtr. Long |
| 49 | ST Pole 11 Mtr. Long flange type |
| 50 | ST Pole 13 Mtr. Long flange type |
| 51 | Errection of DP Structure with GI Channel X-arm including clamps and braces (the detail specification of X-arms for DP Structure can be refered from REC Constructional Specifications) |
| 52 | Straightening of tilted pole including installation of Guy set if required. |
| 53 | ST Pole 8 Mtr. Long |
| 54 | ST Pole 9 Mtr. Long |
| 55 | ST Pole 11 Mtr. Long flange type |
| 56 | ST Pole 13 Mtr. Long flange type |
| 57 | Re-erection of uprooted Poles |
| 58 | ST Pole 8 Mtr. Long |
| 59 | ST Pole 9 Mtr. Long |
| 60 | ST Pole 11 Mtr. Long flange type |
| 61 | ST Pole 13 Mtr. Long flange type |
| 62 | Dismentling and Re-erection of Poles |
| 63 | ST Pole 8 Mtr. Long |
| 64 | ST Pole 9 Mtr. Long |
| 65 | ST Pole 11 Mtr. Long flange type |
| 66 | ST Pole 13 Mtr. Long flange type |
| 67 | Laying , Stringing of A.C.S.R Conductor. |
| 68 | A.C.S.R conductor up to 30 mm² (Squirrel / Weasel ) |
| 69 | A.C.S.R conductor 50 mm² (Rabbit) |
| 70 | A.C.S.R conductor 100mm² (Dog) |
| 71 | Re-stringing/Tightening of snapped /loose conductor |
| 72 | A.C.S.R conductor up to 30mm² (Squirrel / Weasel ) |
| 73 | A.C.S.R conductor 50mm² ( Rabbit) |
| 74 | A.C.S.R conductor 100mm² (Dog) |
| 75 | Dismantling of overheated/Damaged/ worn out Conductor and Bundling. |
| 76 | A.C.S.R conductor up to 50mm² (Squirrel / Weasel) |
| 77 | A.C.S.R conductor 50mm² (Rabbit) |
| 78 | A.C.S.R conductor 100mm² (Dog) |
| 79 | Thickening of ACSR conductor in LT/HT Line |
| 80 | Thickening from 20mm² to 30mm² |
| 81 | Thickening from 30mm² to 50mm² |
| 82 | Thickening from 50mm² to 100mm² |
| 83 | Dismentling and Re-stringing of ACSR Conductor in LT/HT Line |
| 84 | A.C.S.R conductor up to 50mm² (Squirrel / Weasel) |
| 85 | A.C.S.R conductor 50mm² (Rabbit) |
| 86 | A.C.S.R conductor 100mm² (Dog) |
| 87 | Erection of guy rod complete |
| 88 | LT Line |
| 89 | HT Line |
| 90 | Tightening of Loose guy wire |
| 91 | Dismantling of D.Wood/ broken/under size pole in HT/LT Line. |
| 92 | Fixing of Jumper sets |
| 93 | HT Line |
| 94 | LT Line |
| 95 | Laying and stringing of overhead LT(3.5Core )/11 KV PVC/XLPE Insulated cable |
| 96 | Upto 16 mm² - 35mm² |
| 97 | Above 35mm² - 70mm² |
| 98 | Above 70mm² - 120mm² |
| 99 | Above 120mm² and including 300mm² |
| 100 | Laying of single core 3P 4W LT U/G Cable |
| 101 | Laying of 3½ core 3P 4W LT U/G Cable |
| 102 | Laying of single core 2P 1W LT U/G Cable |
| 103 | Laying of 3½ core 2P 1W LT U/G Cable |
| 104 | Earthing of ST pole of all length |
| 105 | Spike Earthing |
| 106 | Pipe Earthing |
| 107 | Spiral Earthing |
| 108 | Survey, Route alignment |
| 109 | HT Line |
| 110 | LT Line |
| 111 | HT/LT Line Patrolling for locating of fault |
| 112 | Branch Cutting |
| 113 | Route clearance |
| 114 | Fixing of pre fabricated bracket and cross arm bed for placement of Transformer as per REC standard |
| 115 | Guard Netting (Single Span) |
| 116 | Installation/ Erection of equipments |
| 117 | L.A Set |
| 118 | D.O Set |
| 119 | Link Set |
| 120 | G.O Set |
| 121 | H.G Set |
| 122 | Iron work such as fabrication of steel work. |
| 123 | Drilling of holes |
| 124 | Decorative Lights |
| 125 | Decorative Lights Tri Colour |
| 126 | Loading of 11/0.4 KV Distribution transformer |
| 127 | Up to and including 100 KVA |
| 128 | Above 100 KVA upto and including 300 KVA |
| 129 | Above 300 KVA upto and including 630 KVA |
| 130 | Above 630 KVA upto and including 1500 KVA |
| 131 | Unloading of 11/0.4 KV Distribution transformer |
| 132 | Up to and including 100 KVA |
| 133 | Above 100 KVA upto and including 300 KVA |
| 134 | Above 300 KVA upto and including 630 KVA |
| 135 | Above 630 KVA upto and including 1500 KVA |
| 136 | Dragging of 11/0.4 KV Distribution transformer upto first 50 Mtr. |
| 137 | 16 KVA upto and including 25 KVA |
| 138 | 25 KVA upto and including 100 KVA |
| 139 | 100 KVA upto and including 300 KVA |
| 140 | 300 KVA upto and including 630 KVA |
| 141 | 630 KVA upto and including 1500 KVA |
| 142 | Dragging of 11/0.4 KV Distribution transformer for every subsequent 10 Mtr. |
| 143 | 16 KVA upto and including 25 KVA |
| 144 | 25 KVA upto and including 100 KVA |
| 145 | 100 KVA upto and including 300 KVA |
| 146 | 300 KVA upto and including 630 KVA |
| 147 | 630 KVA upto and including 1500 KVA |
| 148 | Mounting of Transformer on X-arm bed including HV and Earth connections. |
| 149 | Upto and including 25 KVA |
| 150 | Above 25 KVA upto and including 100 KVA |
| 151 | Above 100 KVA upto and including 250 KVA |
| 152 | Mounting of Transformer on plateform including HV and Earth connections. |
| 153 | 300 KVA and 400 KVA |
| 154 | 500 KVA and 630 KVA |
| 155 | 1.0 MVA and 1.5 MVA |
| 156 | Erection/ Installation of LT Cable circuit complete job. |
| 157 | Upto and including 25 KVA |
| 158 | Above 25 KVA upto and including 100 KVA |
| 159 | Above 100 KVA upto and including 630 KVA |
| 160 | Above 630 KVA upto and including 1500 KVA |
| 161 | Dismantling of LT Cable circuit complete job. |
| 162 | Upto and including 25 KVA |
| 163 | Above 25 KVA upto and including 100 KVA |
| 164 | Above 100 KVA upto and including 630 KVA |
| 165 | Above 630 KVA upto and including 1500 KVA |
| 166 | Replacement of Bushing only of Distribution Transformer of Various capacities |
| 167 | Replacement of Bush Rod only of Distribution Transformer of Various capacities |
| 168 | Crimping of thimbles |
| 169 | 25mm2 upto 70mm2 |
| 170 | Above 70mm2 to 185mm2 |
| 171 | Above 185mm2 |
| 172 | Erection/ Installation of MCCB complete job |
| 173 | Fixing of service line. |
| 174 | Single phase upto 10 Mtr. |
| 175 | Single phase from11 Mtr. to 20 Mtr.per meter. |
| 176 | Single phase from 21 Mtr. to 30 Mtr.per meter. |
| 177 | Opening of service line and re-connection |
| 178 | Installation of Single Phase Energy Meter |
| 179 | Installation of Three Phase Energy Meter/ Prodigy Meter |
| 180 | Sealing of Energy Meter |
| 181 | Shifting of Single phase meter |
| 182 | Shifting of Three phase meter |
| 183 | Dismentling of Single Phase/Three Phase Meter |
| 184 | Laying and Stringing of 11 KV AB cable |
| 185 | 25,35 and 50 mm2 |
| 186 | 70, 95 and 120 mm2 |
| 187 | 150, 185 mm2 and above |
| 188 | Dismentling of 11 KV AB cable |
| 189 | 25,35 and 50 mm2 |
| 190 | 70, 95 and 120 mm2 |
| 191 | 150, 185 mm2 and above |
| 192 | Laying and Stringing of LT AB cable |
| 193 | 25,35 and 50 mm2 |
| 194 | 70, 95 and 120 mm2 |
| 195 | 150 and 185 mm2 |
| 196 | 240 and 300 mm2 |
| 197 | Dismentling of LT AB cable |
| 198 | 25,35 and 50 mm2 |
| 199 | 70, 95 and 120 mm2 |
| 200 | 150 and 185 mm2 |
| 201 | 240 and 300 mm2 |
| 202 | Installation and dismantling of LT AB cable jointing kit. |
| 203 | Installation of CT/PT Unit alongwith Meter (Complete job) |
| 204 | Fixing of heat shrinkable outdoor 11 KV Cable Kits of all specification |
| 205 | Fixing of heat shrinkable indoor 11 KV Cable Kits of all specification |
| 206 | Fixing of heat shrinkable LT Cable Kits of all specification |
| 207 | Fixing of danger Plates (HT/LT) |
| 208 | Fixing of Anti Climbing Device |
| 209 | Painting of MS cross arms, braces and clamp with one basecoat and two coats of aluminum Paint. |
| 210 | Painting of Steel Tubular poles including cross arm & clamp etc. with one basecoat and two coats of aluminum paint. |
| 211 | 8 Mtr long |
| 212 | 9 Mtr long |
| 213 | 11 Mtr. Long flange type |
| 214 | 13 Mtr. Long flange type |
| 215 | Fixing of spacers for LT lines |
| 216 | For 5 wire system |
| 217 | For 4 wire system |
| 218 | For 3 wire system |
| 219 | For 2 wire system |
| 220 | Installation of Meter Board/Meter Box including MCCB/Main Switch |
| 221 | Un-reeling and making of bundles of ACSR Conductor |
| 222 | A.C.S.R conductor up to 50mm² (Squirrel / Weasel / Rabbit) |
| 223 | A.C.S.R conductor 100mm² (Dog) |
| 224 | Erection of MS cross arm |
| 225 | up to 3 feet long |
| 226 | above 3 feet to 6 feet long |
| 227 | above 6 feet to 10 feet long |
| 228 | Erection of MS V-cross arm |
| 229 | Fixing of Braces |
| 230 | Fixing of HT Pin insulator |
| 231 | Fixing of LT Pin/Shackle insulator |
| 232 | Fixing of Disc insulator |
| 233 | Fixing of Top clamp for pin insulator (HT)/ PG clamp |
| 234 | Fixing of U/D clamp for LT insulators |
| 235 | Transportation of Distribution transformers (25KVA, 63KVA, 100KVA etc), ST Poles, Line Materials ,Conductor, DG's, Panels etc from Site upto Divisional Store Choglamsar. |
| 236 | Transportation of Distribution transformers (25KVA, 63KVA, 100KVA etc), ST Poles, Line Materials ,Conductor, DG's, Panels etc from Divisional Store Choglamsar to site. |
| 237 | Loading/Unloading charges of items as mentioned below |
| 238 | DG's of various Capacities (installation of DG sets of various capacity for providing backup supply) Transportation charges will be provided by the Division. |
| 239 | Breakers/Control Panels |
| 240 | Battery Charger, Consumable items, other store material etc. |
| 241 | Manual Carriage of DGs of Various Capcities upto 50mtrs |
| 242 | Per Day Charges of Skilled labour (Electrician) |
| 243 | Per Day Charges of labour |
| 244 | Checking/Repairing of HV/LV Connections, Topping up of less Transformer Oil etc. by way of Opening and refixing of top Cover of Transformer of various capacities. |
| 245 | Refitting of transformer lid after repair |
| 246 | Installing of pole mounted alongwith connections (Sub- Main Distribution Board) SMDB. |
| 247 | Dismantling of Pole mounted (Sub- Main Distribution Board) SMDB |
| 248 | Installation of Cantilever type cross Arm with braces of HT and LT network Please Enable Macros to View BoQ information |