|
| 1 | SEQUENTIAL DISMANTLING OF ACTUATOR INCLUDINGDISCONNECTIONS OF ALL THE ELECTRICAL LINES, GEAR BOX,WHEEL ETC OF 750MM DIA ACTUATOR-OPERATEDNON-RISING TYPE SLUICE VALVE, PN1.6 OF CWPS-II, GRWWAND KEEPING THEM AT A SUITABLE PLACE INCLUDING ALLSORTS OF ALLIED WORKS, ALL COMPLETE, ADOPTING ALLSORTS OF REQUIRED PRECAUTIONS, SAFETY ETC AND USINGALL SORTS OF MACHINES, INSTRUMENTS, TOOLS ANDTACKLES, ARRANGEMENTS, SUPPORTS ETC AS PERSITE-REQUIREMENT AND DIRECTION OF THE EIC. |
| 2 | DISMANTLING, LIFTING ETC OF THE ENTIRE EXISTING 750MMDIA ACTUATOR-OPERATED NON-RISING TYPE SLUICE VALVE,PN1.6 OF CWPS-II, GRWW FROM THE EXISTING PIPE-BAYSEQUENTIALLY BY OPENING, DISMANTLING AND REMOVINGOF THE EXISTING SCRAP HOLDING, OPENING ANDDISMANTLING OF ALL THE NUTS, BOLTS ETC OF BOTHSUCTION AND DELIVERY SIDE AND KEEPING IT AT A SUITABLE PLACE, ADOPTING ALL SORTS OF REQUIRED PRECAUTIONS,SAFETY ETC AND USING ALL SORTS OF MACHINES,INSTRUMENTS, TOOLS AND TACKLES, ARRANGEMENTS,SUPPORTS ETC AS PER SITE-REQUIREMENT AND DIRECTIONOF THE EIC. |
| 3 | TRANSPORTATION OF THE 750MM DIA ACTUATOR-OPERATED NON-RISING TYPE SLUICE VALVE, PN1.6 FROM CWPS-II, GRWW FROM GRWW TO MACHINE SHOP WITH FULL SAFETY TO AVOID ANY FURTHER DAMAGE INCLUDING LOADING & UNLOADING WITH THE ARRANGEMENT OF CRANE AND/OR TEPOY ALONG WITH ALL REQUIRED TOOLS AND TACKLES AS PER SITE-REQUIREMENT AND DIRECTION OF THE EIC. |
| 4 | DISMANTLING ALL COMPONENTS OF THE 750MM DIAACTUATOR-OPERATED NON-RISING TYPE SLUICE VALVE,PN1.6 OF CWPS-II, GRWW PART BY PART, LIKE GLANDPUSHER WITH PACKINGS, TOP CHAIR, BEARING, TOP BONNET, GASKET, SS STEM, GM NUT, BODY SEAT RING, WEDGE SEAT RING, GUIDE SHOE, GUIDE CHANNEL ETC FOR THOROUGH SERVICING AND REPAIRING OF THE VALVE IN ALL RESPECTS ADOPTING ALL SORTS OF REQUIRED PRECAUTIONS, SAFETY ETC AND USING ALL SORTS OF MACHINES, INSTRUMENTS, TOOLS AND TACKLES, ARRANGEMENT, SUPPORTS ETC AS PER SITE -REQUIREMENT AND DIRECTION OF THE EIC. |
| 5 | MAKING PATTERN FOR THE SEAT RING OF THE BODY OR THEWEDGE OF THE 750MM DIA ACTUATOR-OPERATEDNON-RISING TYPE SLUICE VALVE, PN1.6 OF CWPS-II, GRWWFOR CASTING OF NEW RINGS, COMPLETE IN ALL RESPECTS INCASE OF REQUIREMENT OF NEW ONE, INCLUDING ALL ALLIEDWORKS, ALL COMPLETE, AS PER SITE-REQUIREMENT ANDDIRECTION OF THE EIC. |
| 6 | CASTING OF SS 410 FOR THE SEAT RING OF THE BODY ORTHE WEDGE OF THE 750MM DIA ACTUATOR-OPERATEDNON-RISING TYPE SLUICE VALVE, PN1.6 OF CWPS-II, GRWWAND MACHINING, FINISHING AND MATCHING THE SAME ASPER SAMPLE IN ALL RESPECTS INCLUDING ALL SORTS OFALLIED WORKS IN THE CASE OF REQUIREMENT OF NEW RING,ADOPTING ALL SORTS OF RQUIRED PRECAUTIONS, SAFETYETC AND USING ALL SORTS OF REQUIRED MACHINES,INSTRUMENTS, TOOLS AND TACKLES, ARRANGEMENTS,SUPPORTS ETC AS PER SITE-REQUIREMENT AND DIRECTIONOF THE EIC. |
| 7 | INSERTING AND FITTING-FIXING OF THE SEAT RING ON THEBODY OR WEDGE OF THE 750MM DIA ACTUATOR-OPERATEDNON-RISING TYPE SLUICE VALVE, PN1.6 OF CWPS-II, GRWWPROPERLY FOR SMOOTH FUNCTIONING OF THE SAME ANDCOMPLETE IN ALL RESPECTS, ALL COMPLETE, ADOPTING ALL SORTS OF REQUIRED PRECAUTIONS, SAFETY ETC AND USING ALL SORTS OF REQUIRED MACHINES, INSTRUMENTS, TOOLS AND TACKLES, ARRANGEMENTS, SUPPORTS ETC AS PER SITE-REQUIREMENT AND DIRECTION OF THE EIC. |
| 8 | MAKING PATTERN FOR THE GUIDE CHANNEL OF THE VALVEBODY OF THE 750MM DIA ACTUATOR-OPERATED NON-RISINGTYPE SLUICE VALVE, PN1.6 OF CWPS-II, GRWW FOR CASTINGOF GUIDE CHANNEL INCLUDING ALL SORTS OF ALLIED WORKS LAND COMPLETE IN ALL RESPECTS IN THE CASE OF REQUIREMENT OF NEW ONE AS PER SITE-REQUIREMENT AND DIRECTION OF THE EIC. |
| 9 | CASTING OF SS 410 FOR THE GUIDE CHANNEL OF THE BODYOF THE 750MM DIA ACTUATOR-OPERATED NON-RISING TYPESLUICE VALVE, PN1.6 OF CWPS-II, GRWW AND PROVIDING,LAPPING AND FIXING OF GM SHEET WITH PROPER THICKNESSAND LENGTH IN THE ENTIRE INNER SIDE (U-SHAPE) ANDMACHINING, FINISHING, MATCHING AND THE SAME AS PERSAMPLE IN ALL RESPECTS INCLUDING ALL SORTS OF ALLIEDWORKS IN THE CASE OF REQUIREMENT OF NEW ONE, ALLCOMPLETE, ADOPTING ALL SORTS OF REQUIREDPRECAUTIONS, SAFETY ETC AND USING ALL SORTS OFREQUIRED MACHINES, INSTRUMENT, TOOLS AND TACKLES,ARRANGEMENTS, SUPPORTS ETC AS PERSITE-REQUIREMENT AND DIRECTION OF THE EIC. |
| 10 | INSERTING AND FITTING-FIXING OF GUIDE CHANNEL ON THEBODY OF THE 750MM DIA ACTUATOR-OPERATED NON-RISINGTYPE SLUICE VALVE, PN1.6 OF CWPS-II, GRWW PROVIDINGALL SORTS OF REQUIRED NUTS, BOLTS ETC, PROPERLY FORSMOOTH FUNCTIONING OF THE SAME AND COMPLETE IN ALLRESPECTS, ALL COMPLETE, ADOPTING ALL SORTS OFREQUIRED PRECAUTIONS, SAFETY ETC AND USING ALLSORTS OF REQUIRED MACHINES, INSTRUMENTS, TOOLS ANDTACKLES, ARRANGEMENTS, SUPPORTS ETC AS PERSITE-REQUIREMENT AND DIRECTION OF THE EIC. |
| 11 | MAKING PATTERN FOR THE GUIDE SHOE OF THE WAGE OFTHE 750MM DIA ACTUATOR-OPERATED NON-RISING TYPESLUICE VALVE, PN1.6 OF CWPS-II, GRWW FOR CASTING OFGUIDE SHOE INCLUDING ALL SORTS OF ALLIED WORKS ANDCOMPLETE IN ALL RESPECTS IN THE CASE OF REQUIREMENTOF NEW ONES AS PER SITE REQUIREMENT AND DIRECTIONOF THE EIC. |
| 12 | CASTING OF STAINLESS STEEL 410 FOR THE GUIDE SHOE OFTHE WEDGE OF THE 750MM DIA ACTUATOR-OPERATEDNON-RISING TYPE SLUICE VALVE, PN1.6 OF CWPS-II, GRWWAND PROVIDING, LAPPING AND FIXING OF GM SHEET WITHPROPER THICKNESS AND LENGTH IN THE ENTIRE OUTER SIDE(U-SHAPE) AND MACHINING, FINISHING, MATCHING THE SAME AS PER SAMPLE IN ALL RESPECTS INCLUDING ALL SORTS OF ALLIED WORKS IN THE CASE OF REQUIREMENT OF NEW GUIDE SHOE, ALL COMPLETE, AS PER SITE-REQUIREMENT AND DIRECTION OF THE EIC. |
| 13 | INSERTING AND FITTING-FIXING OF GUIDE SHOE ON THEWEDGE OF THE 750MM DIA ACTUATOR-OPERATEDNON-RISING TYPE SLUICE VALVE, PN1.6 OF CWPS-II, GRWWPROVIDING ALL SORTS OF REQUIRED NUTS, BOLTS ETC,PROPERLY FOR SMOOTH FUNCTIONING OF THE SAME ANDCOMPLETE IN ALL RESPECTS, ALL COMPLETE, ADOPTING ALL SORTS OF REQUIRED PRECAUTIONS, SAFETY ETC AND USING ALL SORTS OF REQUIRED MACHINES, INSTRUMENTS, TOOLS AND TACKLES, ARRANGEMENTS, SUPPORTS ETC AS PER SITE-REQUIREMENT AND DIRECTION OF THE EIC. |
| 14 | MANUFACTURING AND FITTING-FIXING OF NEW NUT (GM) OFTHE 750MM DIA ACTUATOR-OPERATED NON-RISING TYPESLUICE VALVE, PN1.6 OF CWPS-II, GRWW WITH MAKINGSQUARE OF ACKME THREAD AS PER IS STANDARD,MACHINING, FINISHING AND MATCHING, AS PER SAMPLE ANDCOMPLETE IN ALL RESPECTS, INCLUDING ALL SORTS OFALLIED WORKS, ALL COMPLETE, ADOPTING ALL SORTS OFPRECUATIONS AND SAFETY AND USING ALL SORTS OFMACHINES, INSTRUMENTS, ARRANGEMENTS, TOOLS &TACKLES ETC. AS PER SITE-REQUIREMENT AND DIRECTIONOF THE EIC. |
| 15 | COMPLETE ASSEMBLY OF THE ENTIRE 750MM DIAACTUATOR-OPERATED NON-RISING TYPE SLUICE VALVE,PN1.6 OF CWPS-II, GRWW PART BY PART, INCLUDINGPROVIDING REQUIRED NUTS & BOLTS (EN-8), GASKET ETCAND OTHER SPARE INCLUDING ALL SORTS OF ALLIED WORKS, ALL COMPLETE, ADOPTING ALL SORTS OF PRECUATIONS AND SAFETY AND USING ALL SORTS OF MACHINES, INSTRUMENTS, ARRANGEMENTS, TOOLS & TACKLES ETC. AS PER SITE-REQUIREMENT AND DIRECTION OF THE EIC. |
| 16 | PERFORMING HYDROSTATIC TESTS OF THE ASSEMBLED750MM DIA ACTUATOR-OPERATED NON-RISING TYPE SLUICEVALVE, PN1.6 OF CWPS-II, GRWW AND COMPLETE IN ALLRESPECTS(NECESSARY TEST CERTIFICATE/S FROM THECOMPETENT AGENCY IS TO BE PROVIDED) INCLUDING ALLSORTS OF ALLIED WORKS, ALL COMPLETE, ADOPTING ALLSORTS OF PRECUATIONS AND SAFETY AND USING ALL SORTS OF MACHINES, INSTRUMENTS, ARRANGEMENTS, TOOLS & TACKLES ETC. AS PER SITE-REQUIREMENT AND DIRECTION OF THE EIC. |
| 17 | REPLACING THE EXISTING GASKET WITH NEW MATERIAL ASPER SAMPLE, THEN PLACING THE ENTIRE BONNET-UNIT ONTHE BOTTOM PART (BODY) OF THE VALVE, TIGHTENING ALLTHE NUTS-BOLTS ETC, REASSEMBLING AND RESETTING THEENTIRE SCRAP HOLDING UNIT WITH ALL SORTS OF REQUIREDPRECAUTIONS, SAFETY ETC AND MACHINES, INSTRUMENTS,TOOLS AND TACKLES, ARRANGEMENTS, SUPPORTS ETC ASPER SITE-REQUIREMENT AND DIRECTION OF THE EIC. |
| 18 | TRANSPORTATION OF THE 750MM DIA ACTUATOR-OPERATED NON-RISING TYPE SLUICE VALVE, PN1.6 OF CWPS-II, GRWW FROM MACHINE SHOP TO GRWW, KEEPING IT AT A SUITABLE PLACE WITH FULL SAFETY AND PRECAUTIONS INCLUDING LOADING AND UNLOADING WITH THE ARRANGEMENT OF CRANE AND/OR TEPOY ALONG WITH ALL REQUIRED TOOLS AND TACKLES AS PER SITE-REQUIREMENT AND DIRECTION OF THE EIC. |
| 19 | LIFTING, PUTTING AND INSTALLATION OF THE 750MM DIAACTUATOR-OPERATED NON-RISING TYPE SLUICE VALVE,PN1.6 OF CWPS-II, GRWW IN EXISTING PIPE-BAYSEQUENTIALLY BY PROVING, INSERTING, TIGHTENING ETC OFTHE REQUIRED SS NUTS, BOLTS, WASHER ETC OF BOTHSUCTION AND DELIVERY SIDES AND REASSEMBLING OF THESCRAP HOLDING PART BY PART, INSERTING AND TIGHTENINGOF ALL THE NUTS, BOLTS ETC OF THE SCRAPHOLDING,ADOPTING ALL SORTS OF REQUIRED PRECAUTIONS, SAFETY ETC AND USING ALL SORT OF MACHINES, INSTRUMENTS, TOOLS AND TACKLES, ARRANGEMENTS, SUPPORTS ETC AS PER SITE -REQUIREMENT AND DIRECTION OF THE EIC. |
| 20 | INSTALLATION OF THE ACTUATOR INCLUDING CONNECTIONSOF ALL THE ELECTRICAL LINES, GEAR BOX, WHEEL ETC OFTHE 750MM DIA ACTUATOR-OPERATED NON-RISING TYPESLUICE VALVE, PN1.6 OF CWPS-II, GRWW AND INCLUDINGREQUIRED GREASING AND ALL OTHER ALLIED WORKS, ALLCOMPLETE, ADOPTING ALL SORTS OF REQUIREDPRECAUTIONS, SAFETY ETC AND USING ALL SORT OFMACHINES, INSTRUMENTS, TOOLS AND TACKLES,ARRANGEMENTS, SUPPORTS ETC AS PER SITE-REQUIREMENT AND DIRECTION OF THE EIC. |
| 21 | TRIAL OPERATION OF THE 750 MM DIA ACTUATOR-OPERATEDNON-RISING TYPE SLUICE VALVE, PN1.6 OF CWPS-II, GRWWAND OBSERVATION FOR 8 HOURS, INCLUDING RECTIFYINGAND ADJUSTING THE REQUIRD PARTS, INCLUDING ALL SORTSOF ALIIED WORKS, ALL COMPLETE, ADOPTING ALL SORTS OFREQUIRED PRECAUTIONS, SAFETY AND USING ALL SORTS OFMACHINES, INSTRUMENTS, TOOLS AND TACKLES,ARRANGEMENTS, SUPPORTS ETC AS PER SITE-REQUIREMENT AND DIRECTION OF THE EIC. Please Enable Macros to View BoQ information |