| 1 | Total of Schedule-A (DSR Civil-2023 Items) + Schedule-B (Horticulture & Landscaping DSR-2025 Items) + Schedule-C (NDSR Items) |
| 2 | Total of Schedule-D(Manpower Items) |
| 3 | Total of Schedule-A(DSR Civil-2023 Items) |
| 4 | Total of Schedule-B(Horticulture & Landscaping DSR-2025 Items) |
| 5 | Total of Schedule-C(NDSR Items) |
| 6 | Total of Schedule-D(Manpower Items) OCH-2174 APPENDIX- 3A PROFORMA FOR STATEMENT OF MINOR DEVIATIONS (Refer Clause C 2.2(d) and C 15.1 of ITT) 1. The following are the particulars of minor deviations from the requirements of the Tender Document: Sr. No Clause Deviations Price reduction for each deviation/s Note : 1. The Tenderer shall indicate price reduction against each deviation in Appendix-3A of BOQ. This price is the price which the tenderer shall reduce from this tender price if deviation(s) is/are accepted by the Employer. 2. Where there is no deviation, the statement should be returned duly signed with an endorsement indicating ‘No Deviations’. In case, Performa of deviations is not submitted or submitted as blank, it will be construed that the tenderer has not proposed any deviations from tender documents. 3. It shall be noted that in case Nil/Zero/NA Price quoted by Tenderer in Appendix-3A then it shall mean that contractor has quoted same price for deviation and undeviation bid. 4. If the tenderer proposes deviations in tender documents, and/or any other terms and conditions of the tender, other than in this Appendix, it will have no effect. Signature of authorized signatory On behalf of Tenderer OCH-2174 Preamble |
| 7 | The Bill of Quantities shall be read in conjunction with Notice Inviting Tenders, Instructions to Tenderers, General and Special Conditions of Contract, Employer's Requirement and Technical Specification and other relevant documents. |
| 8 | BoQ1 consists of Schedule 'A' (Civil DSR-2023 Items), Schedule ‘B’ (Horticulture & Landscaping DSR-2025 Items), Schedule 'C' (NDSR Items) and Schedule 'D' (Manpower items). |
| 9 | Tenderers shall quote their offer in Indian Rupees (INR) only. Tenderers are required to be quoted percentage (%) Excess/Less for schedule-A, B & C and percentage (%) Excess for Schedule-D (Manpower) in figures in the appropriate highlighted cells in the BoQ1 sheet. |
| 10 | All the quoted rates will be deemed to include Duties, Taxes, Octroi, Royalty etc., cost of all plants, labour, supervision, materials, transport, all temporary works, erection, maintenance, utility identification, contractor’s profit and establishment/ overheads, together with preparation of design and drawings, all general risks, insurance liabilities, compliance of labour laws and obligations set out or implied in the contracts. For taxes and duties refer clause C2.5 of ITT & clause 17 of SCC. |
| 11 | The rates and prices to be tendered in the unit Priced Bill of Quantities of Schedule ‘A’, ‘B’, ‘C’ & 'D' are for completed and finished items of works and complete in all respect. |
| 12 | The price offer in the BOQ shall be given without considering any deviation mentioned in Appendix-3 of FOT i.e. price in the box shall be quoted as per tender conditions without any deviation. |
| 13 | If the tenderer fails to quote rates against any item, the tender may be treated as incomplete and non- responsive and shall be rejected. |
| 14 | Errors will be corrected by the employer for any arithmetical errors in computation or summation as per contract conditions. |
| 15 | The Financial Proposal (as per BOQ) shall be uploaded online on the website http://etenders.gov.in/eprocure/app. The rates shall be quoted in the excel file provided in the bid documents. The tenderer shall download the excel file and quote the rates against each highlighted cells in BoQ1. After quoting their rates the excel file shall be uploaded accordingly. The rates shall not be offered/quoted elsewhere in the technical submission/ tender submission. |
| 16 | The work executed against all the BOQ items in Schedule ‘A’, ‘B’, ‘C’ & 'D' as detailed in tender document would be paid on measurement basis. |
| 17 | The contractor may raise their “On Account” payments on monthly basis as per the status of work on the last day of the respective month. Please Enable Macros to View BoQ information DELHI METRO RAIL CORPORATION LIMITED BOQ Name of Work:- Contract No.: OCH-2174 - “Development and Maintenance of horticulture works from MVP1 to SVVR Metro Stations including Vinod Nagar Staff Quarters and Yamuna Vihar RSS at Line-7.” S. No. Item No. Description of Item Unit Quantity Rate (₹)(including GST) Amount (₹)(including GST) Schedule-A (DSR Civil-2023 Items) |
| 18 | DSR Civil-2023 Total of Schedule-A (DSR Civil-2023) (including GST) 1000000.0 Total of Schedule-A (DSR Civil-2023) (exclusive of GST@18%) 847457.63 Total of Schedule-A (DSR Civil-2023) (exclusive of GST@18%) considering CPWD adjustment factor of 0.973 824576.27 GST on Schedule-A @18% 148423.73 Total of Schedule-A (DSR Civil-2023) (inclusive of all, GST@18%) 973000.0 Schedule-B : Horticulture & Landscaping DSR-2025 Items |
| 19 | 2.36 2.36.1 Hedge cutting (Normal Hedge) upto 1.2 mtr. Height (As per yard stick 1 mali = 3000 running mtr.) Per mtr./ per month 23000.0 9.1 209300.0 |
| 20 | 2.4 2.40.2 Residential Flats and Govt. Officers Bungalow. (1.25 Acres = One Mali) As per yard stick. Per sqm/ per month 600000.0 4.95 2970000.0 |
| 21 | 2.42 2.42.2 Trees for 500 Nos. / (3 to 8 years of age) Per Plant/ Per Month 5500.0 49.1 270050.0 |
| 22 | Horticulture & Landscaping DSR-2025 Total of Schedule-B (Horticulture & Landscaping DSR-2025 Items) (including GST) 5949350.0 Total of Schedule-B (Horticulture & Landscaping DSR-2025 Items) (exclusive of GST@18%) 5041822.03 GST on Schedule-B @18% 907527.97 Total of Schedule-B (Horticulture & Landscaping DSR-2025 Items) (inclusive of all, GST@18%) 5949350.0 Schedule-C : NDSR items |
| 23 | NDSR-1 |
| 24 | NDSR-2 |
| 25 | NDSR-3 |
| 26 | NDSR-4 Total Amount of Schedule-C (NDSR Items) (including GST) 4677382.3 Total Amount of Schedule-C (NDSR Items) (exclusive of GST@18%) 3963883.31 GST on Schedule-C (NDSR Items) @18% 713499.0 Total Amount of Schedule-C (NDSR Items) (inclusive of all, GST@18%) 4677382.31 Schedule-D (Manpower Items) |
| 27 | NDSR-5 |
| 28 | NDSR-6 Total of Schedule-D (Manpower Items) (including GST) 2305932.0 Total of Schedule-D (Manpower Items) (exclusive of GST@18%) 1954179.66 GST on Schedule-D (Manpower Items) @18% 351752.34 Total of Schedule-D (Manpower Items) (inclusive of all, GST@18%) 2305932.0 Grand Total of Schedule-A + Schedule-B + Schedule-C + Schedule-D (excluding GST) 11784461.27 Grand Total of Schedule-A + Schedule-B + Schedule-C + Schedule-D (inclusive of all, GST@18%) 13905664.31 |