|
| 1 | OVERHAULING OF MOTORS & STARTERS ON-BOARD INS TARANGINI (Please refer detailed scope as per tender document) |
| 2 | HYDRAULIC DOOR INDICATION SYSTEM, (MAKE: M/S. WINEL B.V. NETHERLANDS), CHECK LIMIT SWITCH FOR PROPER OPERATION. RENEW DEFECTIVE LIMIT SWITCHES (VENDOR SCOPE) |
| 3 | F.O. CENTRIFUGE SYSTEM(MAKE- M/S. STORK PUMPS LTD, MUMBAI)CARRY OUT CALIBRATION OF OVERLOAD RELAY (OLR)/THERMAL PROTECTION (TP) OF STARTER. |
| 4 | STP SYSTEM (MAKE- M/S. HIGH POINT PVT LTD)OVERHAUL THE MOTOR (1.5KW-03 NOS, 3.7KW-01 NO) AND STARTER. RENEW BEARINGS SUBJECT TO Q.C CHECKS. CALIBRATE OVERLOAD MECHANISM OF THE STARTER. |
| 5 | 1FIRE MAIN SYSTEMOVERHAUL THE MOTOR & STARTERS. REPLACE BEARING (DE: 6206ZZ, NDE: 6206ZZ).CALIBRATE OVER-LOADING MECHANISHM OF THE FIRE MAIN STARTER. |
| 6 | BILGE PUMP SYSTEMOVERHAUL THE MOTOR & STARTERS. REPLACE BEARING (DE: 6206ZZ, NDE: 6206ZZ).CALIBRATE OVER-LOADING MECHANISM OF BILGE PUMP STARTER |
| 7 | GREY WATER PUMP SYSTEMOVERHAUL THE MOTOR & STARTERS. REPLACE BEARING (DE: 6206ZZ, NDE: 6206ZZ).CALIBRATE OVER-LOADING MECHANISM OF GREY WATER PUMP STARTER.3.7 KW, RPM 2840 |
| 8 | COOKING RANGE 7.5KW & 15 KW(MAKE - M/S. KANTILAL CHUNILAL)OVERHAUL THE EQUIPMENT COMPLETELY AND DO AS MENTIONED BELOW:- (A) CHANGE THE ELEMENT IF DEFECTIVE.(B) RENEW THE INTERNAL WIRING IF PERISHED.C) CHECK THE ROTARY SWITCHES, CHANGE WITH NEW ONE IF REQUIRED.(D) CALIBRATE TEMPERATURE SENSORS AND TEMPERATURE GAUGES IF FITTED. (E) CHECK TEMPERATURE CUT-OUT OF WATER HEATERS FOR SATISFACTORY OPERATION AND ADJUST AS REQUIRED |
| 9 | EDA, 6KVA (MAKE- M/S. KIRLOSKAR)1. OVERHAULING OF EDA ALTERNATOR VIEW BEARING DEFECTIVE.2. NAV AIDS NOT GETTING CONTINUOUS SUPPLY FROM EDA. EDA ONLOAD BREAKER GETTING TRIP INTERMITTENTLY. DI/DR TO BE UNDERTAKEN. |
| 10 | ANCHOR WINDLASS(MAKE - RIDDERINKHOF B.V. (HOLLAND))1. OPERATION CHECKS AND OVERHAULING OF ANCHOR WINDLASS MOTOR (5.5KW) AND STARTERS TO BE UNDERTAKEN VIEW HIGH CURRENT. TRIALS OF MOTOR AND BRAKE ASSEMBLY TO BE CARRIED OUT.ABNORMAL NOISE FRO MOTOR AND PANEL ALSO MALFUNCTIONING .DEFECT TO BE RECTIFIED.QTY: 1 SET2. OPERATING PANEL OF ANCHOR WINDLASS (QTY-01) AND MOORING WINCH (QTY-04) IS PERISHED TO BE RENEWED WITH NEW IP-65 COMPATIBLE BOX. DETAILED SOW INCLUDE THE FOLLOWING: -(A) RENEWAL OF THE BOX (IP 65 COMPATIBLE) (QTY-05)(B) RENEW THE PANEL WITH NEW NO/NC PUSH BUTTONS AND INDICATION LAMPS. (QTY-05)(C) CALIBRATE THE AMPERE METER .REPLACE IF DEFECTIVE (QTY-05). |
| 11 | SUPPLY AND EXHAUST FAN SYSTEM(MAKE- M/S. ABB)ABNORMAL NOISE OBSERVED FROM SUPPLY/EXHAUST MOTORS FROM VARIOUS LOCATION. OVERHAULING OF 14 MOTORS OUT OF 42 TO BE CARRIED OUT. JOB INCLUDES REMOVAL OF MOTORS FROM TRUNKING AND FITMENT POST OVERHAULING. CARRY OUT PERFORMANCE TRAILS POST OVERHAUL. MOTOR SPECIFICATION: - 0.5 KW |
| 12 | GROUP STARTER PANEL (MAKE - SWITCH N CONTROLGEAR PVT. LTD BOMBAY)OVERHAULING OF VENTILATION MOTOR STARTER PANEL VIEW ABNORMAL NOISE. |
| 13 | STARTERS AND MOTORSOVERHAULING OF FOLLOWING MOTORS AND STARTERS TO BE UNDERTAKEN VIEW ABNORMAL NOISE FROM MOTORS AND MALFUNCTIONING PANELS: - (A) MOORING WINCH (3.2KW) - QTY: 04 (B) REF PLANT MOTOR (5.5KW) - QTY: 02(C) STANDBY GEAR BOX MOTOR (3.75KW) - QTY: 02 |
| 14 | STARTERSTO OVERHAUL AND CALIBRATE OVER-LOAD MECHANISM OF THE STARTERS:-1) MOTOR FRESH WATER HYDROPHORE PUMP -QTY: 02 (2.2 KW)2) F.O. TRANSFER PUMP MOTOR - QTY: 01 (1.1 KW)3) HOT WATER CIRCULATION PUMP - QTY: 01 (1.1 KW)5) F.O. PURIFIER PUMP โ QTY: 01(1.1KW) |
| 15 | SUBMERSIBLE PUMP STARTEROVERHAULING OF SUBMERSIBLE PUMP STARTERS ARE TO BE CARRIED OUT VIEW NON OPERATIONAL( 415V,3PH,50HZ,20TPH ) |
| 16 | 415V, 3PHASE, 50 HZ TRANSFORMEROVERHAULING OF 415V 3 PHASE 50 HZ TRANSFORERMER BE CARRIED OUT VIEW OVERHEATING. Please Enable Macros to View BoQ information |