| 1 | Percentage BoQ BoQ_Ver3.0 Percentage Normal INR Only INR Select, At Par, Excess (+), Less (-) IOCL Tender Inviting Authority: Rural Engineering Wing Budgam Name of work :- Extension of RCC Culvert with P Bund near house of moosa bhat at wahapora Scheme: CDF Contract No: of 2025-26 DATED: Adv cost =Rs 1.50 LACS Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # S.No. Item Description Item Code / Make Quantity Units Estimated Rate inRs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes inRs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words |
| 2 | Earth work in excavatiob by manual means in trenches for foundations, Drains, cables etc Cexceeding 30 cm in depth , 1.5 m in width as well as 10 sqm on plan including disposal of excavated earth lead upto 1 m and lift 1.5 m. |
| 3 | Providing and laying of dry stone soling including carriage of 10 km by mechnical transport |
| 4 | Providing and laying of cement concrete of grade M-10 1:3:6 mix excluding the cost of shuttering and centering. |
| 5 | Centering and shuterring including strutting propping etc removal of same for Foundations, footings etc |
| 6 | 12 mm thick cement sand plaster of 1:4 mix |
| 7 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with.1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 8 | Centering and shuterring including strutting propping etc removal of same for Suspended floors, slab etc for mass concreting |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level ,Mild steel and medium tensile steel bars |
| 10 | Carriage of material by M/T with avg lead of 20 kms from source to site for bajri |
| 11 | Contigency Charges |
| 12 | Add provision for cost of photographs, Citizen Information Board & other unforeseen items Total in Figures Excess(+) 1.0 Full Conversion INR 150000.0 150000.0 INR One Lakh Fifty Thousand Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |