|
| 1 | Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer-incharge. |
| 2 | Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.- in cement mortar |
| 3 | Earthwork in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as per direction of Engineer-in-charge , within a lead of 50m - all kinds of soil |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50m and all lift |
| 5 | Supply of Quarry rubbish including stacking to department gauge for premeasurement and spreading required thickness |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plith level - 1:4:8 (1 cement : 4 fine aggregate : 8 graded stone aggregate 40mm nominal size) |
| 7 | Providing and laying in position specified grade of reinforced cement concrete , excluding the cost of centering , shuttering , finsishing and reinforcement - All work upto plinth level 1:1.5:3 (1cement : 1.5 fine aggregate : 3 graded stone aggregate 20 mm nominal size) |
| 8 | Centering and shuttering including strutting, propping etc and removal of form for - Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. |
| 9 | Steel reinforcement for R.C.C.work including straightening , cutting , bending , placing in position and binding all complete upto plinth level - Thermo -Mechanically treated bars Fe - 500D or more |
| 10 | Providing and fixing 110 mm dia PVC pipes (4kg / cm2) in weep holes including cement concrete 1:5:10 (one cement : 5 sand : 10 graded stone aggregate ) and filling of pebbles etc., |
| 11 | Providing and filling in foundation trenches and at the back of abutments, wing walls etc. and below pipe bed in layers not exceeding 150mm thick including watering and compacting including all lead and lifts. - Selected granular material in filling. |
| 12 | 12 mm cement plaster of mix 1:5 (1 cement : 5 fineaggregate) |
| 13 | Finishing walls with water proofing cement paint of required shade - New work (Two or more coats applied @ 3.84 kg / 10 sqm) Please Enable Macros to View BoQ information |