| 1 | Arrangement of Barricading of the site including all material, labour etc. complete. |
| 2 | Dismantling and reinstatement of interlocking Road surface with old and new material including supply of all materials, labour T&P etc. required for proper completion of work. |
| 3 | Making of roka in manhole including all required material like sand bags, safety equipments, labour, T&P etc. all complete. |
| 4 | Excavation 0.0-1.5mtr deep in soil mixed with moorum, shingle, kankar etc. |
| 5 | Excavation 1.5-3.0mtr deep in soil mixed with moorum, shingle, kankar etc |
| 6 | Bailing out or pump out subsoil water |
| 7 | Supply of 200 mm dia RCC NP3 hume pipe |
| 8 | Providing and Laying of cement concrete in 1:5:10 (1 cement : 4 fine sand : 8 graded store aggregate 40mm nominal size) including supply of all material, labours and T&P etc. required for proper completion of the work |
| 9 | Laying and jointing of 200mm dia RCC NP3 hume pipe, 1.5-3.0 deep |
| 10 | Class 150 (Non Modular) Brick Work in 1:4 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of work |
| 11 | Fixing C.I. footsteps in the walls. |
| 12 | 12mm thick plaster in 1:3 Cement and Coarse Sand in mortar including Supply of All Materials, Labours, T. & P. etc all complete |
| 13 | Sand filling in plinth including supply of necessary quantity of sand from any distance at site of work and including watering dressing etc. required for proper completion of work |
| 14 | Opening of roka from manhole including all required material like sand bags, safety equipments, labour, T&P etc. all complete. |
| 15 | Cleaning of site/ Disposal of malwa such as silt, garbage etc/ Photography of site. |
| 16 | Contigency @ 2% |
| 17 | GST @ 18% Please Enable Macros to View BoQ information |