| 1 | Construction of Embankment with Material obtained from Borrow pits. (Local Earth) Construction of Embankment with approved Material obtained from Borrow pits with a lift up to 1.5 m, trasporting to site, spreading grading to requred slope and compacting to meat requirement of Tables 300.1 and 300.2 with a lead upto 1000m as per Technical Specification Clause 301.5 But Excluding GST |
| 2 | Granular Sub-base with coarse Graded Material (Table 400.2) Costruction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with relavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per technical specification Clause 401. But Excluding GST |
| 3 | W B M Grade-2 Providing Laying Spreading and Compacting Stone aggregates of specific sizes to water bound macadem specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregates, watering and compacting to the required density grading 2 as per Technical Clause 405(2) But Excluding GST |
| 4 | W B M Grade-3 Providing Laying Spreading and Compacting Stone aggregates of specific sizes to water bound macadem specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregates, watering and compacting to the required density grading 3 as per Technical Clause 405(3) But Excluding GST |
| 5 | Primer Coat :- Providing and applying primer coat with bitumen emulsion (SS-2) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70kg/sqm using mechincal means as per technical specification Clause 502. But Excluding GST |
| 6 | Tack Coat Providing and applying Tack coat with bitumen VG-10 using Bitumen distributor at the rate of 0.25 kg per sqm on the Primed/Granular surface cleaned with Hydraulic broom as per MORD Technical Specification Clause 503. But Excluding GST |
| 7 | 20 mm thick Open-Graded Premix Carpet using Bitumenous (penetration grade /midified bitumen) BinderProviding, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared bas, incluing mixing in a suitable plant, laying and rolling with a three wheel 80-100kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type-C as per Technical Specification Clause 508. But Excluding GST |
| 8 | Seal Coat Type -C Providing, laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type-C as per Technical Specification Clause 510. But Excluding GST |
| 9 | Brick edging on both side of the road of M-150 bricks 8cm. (3\\") wide and 12cm (4½\\") deep laid with mud mortar including all labour and supply of brick finished to required template & ramming the excavated earth as directed by the Engineer-In-Charge. SOR SI No. 765 But Excluding GST |
| 10 | CEMENT CONCRETE PAVEMENT(C.C ROAD):- construction of un-reinforced plain cement concrete pavement thickness as per design, over a prepared sub base with 43 grade cement or any other type as per clause 1501.2.2 M 30 (grade) coarse and fine aggregates conforming to IS 383 maximun size of coarse aggregate not exceeding 25mm mixed in a concrete mixer of not less then 0.2 cum capacity and appropriate weight batcher using approved mix design, laid in approved fixed side from work (steel channel laying and fixing of 125 micron thick plastic sheet, wedges steel plates including levelling the form work as per drawing) spreading the concrete with shovels, rakes compacted using needle, screed and plate vibrators and finished in continuous opration including provision of contraction and expansion construction joints applying debonding strips primer, sealant admixtures as approved curing concrete slabs for 14 days, curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501. But Excluding GST |
| 11 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 But Excluding GST |
| 12 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 But Excluding GST |
| 13 | Providing and laying of 40 mm gauge B/B under Hume pipe culvert foundation in road work including all materials, labours, T&P etc. required for completion of the work. But Excluding GST |
| 14 | Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications Clause no.600,1202&1203 But Excluding GST |
| 15 | Supply, laying and fixing of NP3 class hume pipes in proper position in culvert For 350mm Dia But Excluding GST |
| 16 | Supply, laying and fixing of NP3 class hume pipes in proper position in culvert For 600mm Dia But Excluding GST |
| 17 | Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification Clauses 613.3 and 1204 But Excluding GST |
| 18 | Plastering with cement mortar (1:4), 12 mm thick on brickwork in substructure as per technical specification clauses 613 & 1204 But Excluding GST |
| 19 | White washing with lime on undecorated wall surfaces (Two coats) to give an even shade including thoroughly brooming the surface to remove all dirt, dust mortar drops and loose scales of lime wash and other foreign matters. But Excluding GST |
| 20 | Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8, fixing in position including painting and printing etc Ordinary kilometer stone (precast) But Excluding GST |
| 21 | Hectometer stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8, fixing in position including painting and printing etc Hectometer stone (precast) But Excluding GST |
| 22 | Supply and fixing Sign Board But Excluding GST |
| 23 | Maintenance Charges for Bituminous Road Part Maintenance Charge including repair of painted surface, earthwork on patri, etc. complete as per direction of E.I. for the period of five years from the actual date of completion of work .For First Year @ Zero% (Excluding GST) |
| 24 | 2nd Year @ 0.0.25% For CC Work (Excluding GST) |
| 25 | 3rd Year @ 0.50% For CC Work (Excluding GST) |
| 26 | 4th Year @ 0.75% For CC Work (Excluding GST) |
| 27 | 5th Year @ 1.00 % For CC Work (Excluding GST) |
| 28 | 2nd Year @ 0.75% For Bituminous Work (Excluding GST) |
| 29 | 3rd Year @ 1.50% For Bituminous Work (Excluding GST) |
| 30 | 4th Year @ 2.25% For Bituminous Work (Excluding GST) |
| 31 | 5th Year @ 3.00 % For Bituminous Work (Excluding GST) Please Enable Macros to View BoQ information |