| 1 | Construction of Embankment with Material obtained from Borrow pits. (Local Earth) Construction of Embankment with approved Material obtained from Borrow pits with a lift up to 1.5 m, trasporting to site, spreading grading to requred slope and compacting to meat requirement of Tables 300.1 and 300.2 with a lead upto 1000m as per Technical Specification Clause 301.5 But Excluding GST. |
| 2 | Providing, Laying and spreading Material on a prepared sub grade, adding cement @ 2% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub base. But Excluding GST. |
| 3 | Providing, Laying and spreading Material on a prepared sub base, cement @ 4% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of base Quantity of Cement assumed as 4% of quantity by weight for sub base But Excluding GST. |
| 4 | Tack Coat Providing and applying Tack coat with bitumen VG-10 using Bitumen distributor at the rate of 0.35 kg per sqm on the Primed/Granular surface cleaned with Hydraulic broom as per MORTH Technical Specification Clause 503. But Excluding GST. |
| 5 | 20 mm thick Open-Graded Premix Carpet using Bitumenous (penetration grade /midified bitumen) BinderProviding, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared bas, incluing mixing in a suitable plant, laying and rolling with a three wheel 80-100kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type-C as per Technical Specification Clause 508. But Excluding GST. |
| 6 | Seal Coat Type -C Providing, laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type-C as per Technical Specification Clause 510. But Excluding GST. |
| 7 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 But Excluding GST. |
| 8 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 But Excluding GST. |
| 9 | Providing and laying of 40 mm gauge B/B under Hume pipe culvert foundation in road work including all materials, labours, T&P etc. required for completion of the work. But Excluding GST. |
| 10 | Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications Clause no.600,1202&1203 But Excluding GST. |
| 11 | Supply, laying and fixing of NP3 class hume pipes in proper position in culvert. 350 mm Dia NP-3 Hume Pipe. But Excluding GST. |
| 12 | Supply, laying and fixing of NP3 class hume pipes in proper position in culvert. 600 mm Dia NP-3 Hume Pipe. But Excluding GST. |
| 13 | Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification Clauses 613.3 and 1204 But Excluding GST. |
| 14 | Plastering with cement mortar (1:4), 12 mm thick on brickwork in substructure as per technical specification clauses 613 & 1204 But Excluding GST. |
| 15 | White washing with lime on undecorated wall surfaces (Two coats) to give an even shade including thoroughly brooming the surface to remove all dirt, dust mortar drops and loose scales of lime wash and other foreign matters. But Excluding GST. |
| 16 | Supply and fixing Kilometer Stone But Excluding GST. |
| 17 | Supply and fixing Hectometer Stone But Excluding GST. |
| 18 | Supply and fixing Sign Board But Excluding GST. |
| 19 | Maintenance Charges for Bituminous Road Part Maintenance Charge including repair of painted surface, earthwork on patri, etc. complete as per direction of E.I. for the period of five years from the actual date of completion of work .For First Year @ Zero% (Excluding GST) |
| 20 | 2nd Year @ 0.75% (Excluding GST) |
| 21 | 3rd Year @ 1.50% (Excluding GST) |
| 22 | 4th Year @ 2.25% (Excluding GST) |
| 23 | 5th Year @ 3.00 % (Excluding GST) Please Enable Macros to View BoQ information |