| 1 | Earth strip laying at Filling shed,loading,unloading,CR shed,TLD,LPG PH,NEW MSV,OLD MSV |
| 2 | High mass cable laying |
| 3 | STP Cable laying |
| 4 | DV Strainer cleaning |
| 5 | DV Strainer removal |
| 6 | Fire engine Blinding works |
| 7 | New mount NRV Fixing |
| 8 | Old mount NRV Fixing |
| 9 | Old mount Local bleeder line modification |
| 10 | STP Check scale Removal & Erection |
| 11 | Gate valve removal |
| 12 | Gate valve Erection |
| 13 | Monitor Removal & Erection |
| 14 | DV Room-4&5 Airlinr bypass arrangement |
| 15 | TLD Sprinklar line welding |
| 16 | TLD Vapour trap sump gril works |
| 17 | TLD SOP Board welding |
| 18 | 47.5KG Evacuvation line modification. |
| 19 | Filling shed Sprinkler cleaning |
| 20 | 47.5kg ILB Grill |
| 21 | Fabrication of SOP Board |
| 22 | Fabrication of Soap oil tray |
| 23 | Servicing of 150mm Gate valve |
| 24 | Removal and Relaying of Fencing |
| 25 | 1\\" Strainer |
| 26 | 1\\" #300 Ball valve flanged end |
| 27 | 1\\" CS Barrel Nipple |
| 28 | 3/4\\" CS Barrel nipple |
| 29 | 1/2\\" CS Barrel Nipple |
| 30 | 1\\" #300 CS Flange sch80 |
| 31 | M16x100mm Stud-Nut |
| 32 | 4c x 2.5sqmm UG Cable |
| 33 | Fencing wire |
| 34 | Steel wire rope |
| 35 | 1\\" Square pipe |
| 36 | Hydrant Line Painting works |
| 37 | Structural supports painting works |
| 38 | Earthpits Painting works |
| 39 | Double hydrant Monitor Painting works |
| 40 | Hose Boxes Painting works |
| 41 | Bulding Painting works- Admin Building, Frisking Gate, DG Room, Main Gate |
| 42 | Lettering work- LPG Hoses, Hydrant Hoses, Water Monitors, Double Hydrant, PAVs, Hose Boxes, Direction marking for Individual hydrant line valves, earthpits lettering work |
| 43 | Store Plastering Work |
| 44 | Cable Laying from PMCC to FLT |
| 45 | Provision of JCB |
| 46 | Earthpit cleaning and charcoal addition |
| 47 | Provision of Tractor for movement of scrap materials |
| 48 | PMCC Mats laying and cleaning work |
| 49 | Clearing the sand below the hydrant line and maintaining 300mm clearence |
| 50 | Rectification of damaged civil structures |
| 51 | Supply and Laying of Msand in LPG PH for Cables |
| 52 | Stores cleaning and shifting of unused materials |
| 53 | METERS CALIBRATIONS FOR ALL INSTRUMENTS |
| 54 | SUPPLYING OF M-32 DC GLANDS |
| 55 | SUPPLYING 4 SQ.MM UN ARMOURED CABLE COPPER |
| 56 | SUPPLYING OF CABLE TAG |
| 57 | CABLE GALAND CHECKING AND TIGHTENING OF SECOND COMPRESSON, MULTIBLE EARTHING CONNECTIONSCHENGE TO SINGLE TERMINATION IN ALL FILLING SHED, MSV AREA, LPG PUMPHOUSE,GREEN BELT ALSO |
| 58 | HIGHMAST SERVICING |
| 59 | SUPPLYING OF 24 V DC INDICATION FOR DV MAIN PANEL USE |
| 60 | SIREN MERGING IN 3 KM SIREN IN PLC AND ALL ARRANGEMENTS IN MAIN GATE |
| 61 | ETB PANEL SOFTWARE RECTIFICATION WORK |
| 62 | MAIN GATE DV PANEL FAULT RECTIFICATION WORK |
| 63 | BATTERY FOR FIRE ENGINES 12V 180Ah |
| 64 | Supply of Cartridge for Xerox multifunction printer |
| 65 | Xerox machine repair |
| 66 | Purchase of GI Sheets for soap oil trays |
| 67 | Servicing of LAN Switches |
| 68 | A1 Prints for Vaious Plant Layouts |
| 69 | LPG Pipeline testing report print |
| 70 | Purchase of 20W Lights |
| 71 | Sprinkler nozzle cleaning work |
| 72 | Hydra for movement of unwanted materials |
| 73 | Factory Layout Liasoning work for In-house STP Final Approval |
| 74 | Statistical Dept Liasoing work |
| 75 | OISD Inspection Food Arrangement |
| 76 | Purchase of Paint and Primer |
| 77 | Provision and fixing of JB for LPG Pump 2 including Glanding work |
| 78 | Cable Glanding work 3/4in |
| 79 | Provision and rectification of tripping control for LPG Pump 1 and 2 |
| 80 | Provision and rectification of tripping control for LPG Comp 1 and 2 |
| 81 | Replacement of Contactors and Relays with siutable size relays and contactors |
| 82 | ON/OFF control shifting in line of sight for OLD and NEW MSV |
| 83 | High Mast light up and termination work |
| 84 | Provision of Al clip and earthing cable for all LPG Hoses |
| 85 | Supply and Fabrication of LPG Vapour and air line for 47.5kg Purging |
| 86 | Supply and Fabrication of Shower for 10kg Purging |
| 87 | Removal and fixing of DU Gearbox |
| 88 | Fabrication of Soap Oil Trays |
| 89 | Fabrication of SRV vent Caps |
| 90 | Replacement of Passing Valves in New Mound Water Drain |
| 91 | Replacement of old LPG Hoses with new one |
| 92 | Fabrication of Stands for STP Shed and name boards for Vapour seal |
| 93 | Fabrication of Earthing Bus bar using GI strip |
| 94 | 3mm Metalic Gasket roll 5.5Feet x 5Feet Supply |
| 95 | 6 Inch Butterfly Valve Supply and Fixing |
| 96 | Checking and servicing of Double Hydrant Points. |
| 97 | Checking and servicing of water monitors. |
| 98 | Wind sock replacement |
| 99 | SCBA kit,Fire Hose Boxes,Fire Hoses,Hand siren,Fire Trolley and Hydrant valves condition checked and serviced. |
| 100 | Fire Pump 1 & 2 Pump Gland Packing done. |
| 101 | Ackerlic sheet Supply and fixing for 42cm x 22cm for Fire Hose Box. |
| 102 | 3/8 x 1/2 Inch Hex Nipple Supply and fixing |
| 103 | Greasing of Hydrant line Gate valves, water monitors, Double Hydrants, Deluge valves etc. |
| 104 | 5/8 x 4 Inch Bolt nut supply and fixing |
| 105 | Emergency Trolley condition checked and two tube replacement in trolley |
| 106 | Hand siren condition checking and greasing |
| 107 | Fire Hose Box condition testing and cleaning work |
| 108 | Servicing of 4\\" gate valves |
| 109 | Fire Hose Pressure testing |
| 110 | 4 Inch valve replacement in MSV Deluge valve and 3 Water monitor and 1Double hydrant point. |
| 111 | Bulk TT Parking two raising water monitor stopper arch provision for EB line. |
| 112 | Supply and fixing Fire Hose Box key. |
| 113 | Supply of Hydrant valve coupling washer. |
| 114 | Supply of Hydrant valve Disc washer. |
| 115 | Supply of Hydrant valve cap. |
| 116 | Supply of Teflon Tape for jointing |
| 117 | Truck DCP Servicing. |
| 118 | CO2 Catridge 200gm. |
| 119 | Truck 9kg DCP new valve replaced. |
| 120 | Truck 9kg DCP Hose replaced. |
| 121 | Truck 9kg DCP Refilling with monomonium pospate powder(9kg). |
| 122 | Failed Fire hose couplings cutted and couplings kept in store room and cutted hoses shifted to scrapyard. |
| 123 | Fire Pump Gland leak arrested and drain line hose pipe cleaned and refixed. |
| 124 | Sprinkler nozzle cleaning. |
| 125 | SECURITY CHECKLIST FOR LPG BULK VEHICLES AND PACKED - EX-MI VEHICLES - 2 Maters |
| 126 | BATCH NUMBER RECORD |
| 127 | RECORDED CCTV FOOTAGE OF PREVIOUS DAY & LIVE FOOTAGE |
| 128 | REGISTER FOR SECURITY GADGET AND EQUIPMENT CHECKLIST |
| 129 | ROUTE CARD - 250 GSM JK BOARD |
| 130 | TREM CARD - 300 GSM ART BOARD - MULTICOLOR PRINT |
| 131 | CONTRACTOR IDENTITY CARD STICKER - FRONT & BACK |
| 132 | UV FLEX PRINTING |
| 133 | UV STAR FLEX PRINTING |
| 134 | VYNYL PRINTING |
| 135 | INKJET PRINTING |
| 136 | DANBER - REFLECTING STICKER |
| 137 | PROHIBITED AREA - REFLECTING STICKER WITH ACP BOARD |
| 138 | Route Cards |
| 139 | TLD 10*8 Banner |
| 140 | MS 2 inch pipes with 1 inch square pipe |
| 141 | Fire Fighting Trolly Material List |
| 142 | SOP for Degassing Unit |
| 143 | SOP number sticker |
| 144 | Fire Fighting equipment Layout & Fire water calculation |
| 145 | Work Permit System |
| 146 | Fire water calculation |
| 147 | Manual call point |
| 148 | Hindi SOP for STP Unit |
| 149 | SOP for Solar Transformer |
| 150 | SOP for Solar Panel |
| 151 | SOP for Deshapping machine |
| 152 | Do&Don't for storage of deshaped/scrap cylinder in yard |
| 153 | Do&Don't for deshapping area |
| 154 | ETB boards |
| 155 | No smoking Boards |
| 156 | Action in emergency |
| 157 | Pump House Equipment details |
| 158 | Air compresser House Equipment details |
| 159 | For covering matter of 425 Kg & Composite cyl SOP |
| 160 | Stand for Role based SOP in filling shed |
| 161 | Do&Don'ts for transformer operation & maintenance |
| 162 | Body leak handling Photo |
| 163 | Caution Board in CCTV Room |
| 164 | Master Cut-off Switch |
| 165 | Deshapping Unit SOP correction |
| 166 | Fail to start - Fire Engine |
| 167 | SPM signature |
| 168 | 425 kg Degassing Unit |
| 169 | 630 KVA transformer standing Instruction |
| 170 | SOP's |
| 171 | SOP's |
| 172 | SOP's |
| 173 | SOP's Please Enable Macros to View BoQ information |