| 1 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete wood work, steel work, including T & P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metresas per MORTH 202 |
| 2 | III) Dismantling Brick/Tile Work (b) In cement mortar |
| 3 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete wood work, steel work, including T & P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metresas per MORTH 202 |
| 4 | I) By Manual means (b) Cement concrete grade M-15 & M-20 |
| 5 | Dismantling guard rails by manual means and disposal of dismantled material with all lifts and upto a lead of 1000 metres, stacking serviceable materials and unserviceable materials separately as per MORTH Specification 202 |
| 6 | Earthwork in excavation for roadway as per drawing and technical specification, in all types of strata comprising any of the material such as soil, silt sand, clay, gravel, murrum of all varieties shingles, pebbles all types of conglomerates, laterite rock etc soft rock, ordinary rock or disintegrated rock fissured shattered/ decomposed rock or weathered rock all such material as described under appendix to those specification either in full or in parts as the case may be adopting mechanical means (hydraulic excavator) or any approved method or methods as the case may be convenient or permitted inclusive of chiseling and wedging etc in all conditions such as dry, moist, saturated, submerged, foul condition etc including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides, ramming of bottoms, getting out the excavated soil/rock to be leveled and neatly dressed, |
| 7 | pumping and bailing out of water, back filling the excavated earth to the extent required and utilizing the remaining earth locally for road work, barricading, danger lightening, guarding and disposal of excavated earth as directed by the engineer in charge all complete including all leads and lifts and up to depth of excavation as per MoRT & H Specification 301. |
| 8 | Rubble packing with hard laterite stone under floors including watering, ramming & consolidating etc. in pipeline trenches and other foundation complete. |
| 9 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 40 mm. nominal size) excluding cost of centering, shuttering and finishing in: |
| 10 | a)All works upto plinth level |
| 11 | Centering & shuttering including Strutting, Propping & removal of formwork for : |
| 12 | i) Foundations, Footings, Bases for columns and mass concrete |
| 13 | Providing and fixing vitrified antiskid tiles (320x320) and 10mm thick tiles in floor, treads of steps, landing on 25mm thick bed of cement mortar 1:3 and jointed with cement slurry complete. |
| 14 | 12mm cement plaster 1:4 (1 cement : 4 fine sand) |
| 15 | Painting three or more coats with acryllic exterior paint of approved brand and manufacture (Such as Dulex/ Asian Paints/ Sherwin Willians) including applying one coat of cement primer and one coat of surface treatment etc. complete. |
| 16 | Providing and fixing in position S.S. hand rail in main stair case, and landing as per approved design shown in the drawing including bending handrail pipe to proper shape in curves with specials, etc. complete. Please Enable Macros to View BoQ information |