|
| 1 | Total amount of Sch 'A' Part-I Building Works Note :- This schedule is not pre-priced by MES and the rate indicated as \\"Rs. 0.00\\" under column 6 signifies this fact only. |
| 2 | Design, Fabrication and Construction of Pump House in Zone IV 'B' in RCC Framed Structure as per Site plan and line plan and revised thereof. Specification given in Sch A Notes and Particular Specifications including complete RCC foundation and plinth, Flooring, Joinery and Finishes complete all as specified. (i) Size – As per Arch drawing (ii) Height – as per Drg(iii) Fdn – To be design as per SBC report with RCC framed construction. (iv) Plinth – Burnt Brick wk in CM 1:6(v) DPC – 40 mm thick PCC 1:2:4 with WPC(vi) Super Structure – All RCC structure to be M25 design mix burnt brick wk wall upto ceiling.(vii) Seismic Zone – Strengthening measures for Zone V(viii) Roof – 0.50mm thick Pre-painted Galvalume sheet with MS steel frame structure on living area, roof slab with roof treatment - 150 mm thick on ground floor roof verandhah & Bathroom. (ix) Ceiling : False ceiling with powder coated snap grid frame work. (ix) Internal Plaster – Internal 15 mm thick in CM (1:6)(x) Plinth Protection – 75 mm thick PCC 1:3:6 over stone hard core(xi) Dado/Skirting – Glazed ceramic tiles over 10 mm thick cement screed in CM (1:3) up to lintel height.(xii) Painting – Synthetic enamel paint on steel/wooden surface.(xiii) Joinery Window – aluminum powder coated window with Guard bars/grill(xiv) Finishes – Internal - 02 coats of oil emulsion distemper incl 1mm thick wall care putty over a coat of primer. External - 02 Coats of weather proof exterior emulsion over one coat of primer. (xv) Antitermite treatment - As per IS-6313 Part-II : 2001 (xx) Mosquito proofing - All external doors & Windows (xxi) 18mm thick granite over CM 1:3 for steps(xvi) Mosquito Proofing – All external Door and window. |
| 3 | NOTE: Schedule ‘A’ Part II to VII are Prepriced by MES. Bidders shall insert their lumpsum amount in the Green coloured. |
| 4 | Total amount of Sch ‘A’ Part II (Site clearance and development incl demolition) |
| 5 | Total amount of Sch ‘A’ Part III (Road/Path/culverts ) |
| 6 | Total amount of Sch ‘A’ Part VI (External Water Supply) |
| 7 | Total amount of Sch ‘A’ Part V (External Electrification) |
| 8 | Total amount of Sch ‘A’ Part VI (Area Drainage) |
| 9 | SCH 'A PART VII (Miscellaneous B/R and E/M works) Note: This schedule is not pre-priced by MES and the rate indicated as \\"Rs 0.00\\" under Col 6 signifies this fact only |
| 10 | M & L for boring 100 mm dia hole in all kind of soil upto maximum depth 6 meter or up to refuse (N=100) whichever meet earlier including collection of undisturbed sample from cohesive soil only conducting standard penitration test at 6 meter and 1.5 meter interval alternatively as per relevant IS code complete all as directed. |
| 11 | Conducting necessary lab test on selected soil sample (obtained from item here in before) as per relevent nature moisture content, bulk and dry density sleve and hydrometer analysis, liquid and plastic limit, SP gravity unconfined compressive test (UU) or direct consolidation test etc complete all as relevant IS codes or all as specified and directed. |
| 12 | Completion of field work & lab test result and submission of report in Per Job quadruplicate suggesting depth of foundation type of fundation and safe bearing capacity with CD-1 (one) copy complete all as specified and directed. |
| 13 | Material and labour for drilling of Trial Bore hole 200 mm dia by ODEX method using power drilling rig as per IS 2800 in any type of soil, boulder or rock or as per site condition upto depth of 180m including disposal of soil from the site complete all as specified and as directed. (Note: This item will be considered for payment if borewell is not successful at site as directed by the Engr-in-charge) |
| 14 | Material and labour for development of trial bore hole by ODEX including full casing pipe method through any kind of soil, boulders rock for a bore of 200mm dia tube well as required as per site condition upto 30mtr from ground level as per IS -2800 including disposal of soil from the site complete all as directed. |
| 15 | All as per item No-14 above but for the depth exceeding 30m and not exeeding 60m below ground level complete in ditto. Please Enable Macros to View BoQ information |
| 16 | All as per item No-14 above but for the depth exceeding 30m and not exeeding 60m below ground level complete in ditto. Please Enable Macros to View BoQ information |