|
| 1 | Dismantling and lowering to ground for repair, inspecting defective of Window/Split type AC of capacity 1.5 and 2 Ton and re-installing the same after repair complete, testing and shifting to new locations if required as specified by Engr-in-Charge. Note: 1. Day to day complaints of different items should be attended within 12 hours and the equipment should be operational within 24 hours in case of Minor Complaints and within 72 hours for Major complaints. 2. Failure to attend the complaint within the prescribed time shall attract a penalty of Rs 100 per day per complaint. and Rs. 50 for subsequent days. 3. Decision of Accepting Officer will be final in case of fine payment |
| 2 | Supply and replacement of compressor sealed unit suitable for Window Type ACs 1.5 Ton Capacity , reciprocating type flushing , vacuumising and hydration the system, leakage testing , welding/soldering as required and charging refrigerant gas, reinstalling in position and testing for the desired condition including replacement of strainer complete all as directed Make- Kirloskar/ Godrej/Tecumseh/LG |
| 3 | Supply and replacement of compressor sealed unit suitable for Window Type ACs 1.5 Ton Capacity , Rotary type flushing , vacuumising and hydration the system, leakage testing , welding/soldering as required and charging refrigerant gas, reinstalling in position and testing for the desired condition including replacement of strainer complete all as directed Make- Kirloskar/ Godrej/Tecumseh |
| 4 | Supply and replacement of compressor sealed unit suitable for Split Type ACs 1.5 Ton Capacity reciprocating type flushing , vacuumising and hydration the system, leakage testing , welding/soldering as required and charging refrigerant gas, reinstalling in position and testing for the desired condition including replacement of strainer complete all as directed Make- Kirloskar/ Godrej/Tecumseh |
| 5 | Supply and replacement of compressor sealed unit suitable for Split Type ACs 1.5 Ton Capacity, rotary type flushing , vacuumising and hydration the system, leakage testing , welding/soldering as required and charging refrigerant gas, reinstalling in position and testing for the desired condition including replacement of strainer complete all as directed Make- Kirloskar/ Godrej/Tecumseh |
| 6 | Supply and replacement of compressor sealed unit suitable for Split ACs 2 Ton Capacity ,reciprocating type flushing , vacuumising and hydration the system, leakage testing , welding/soldering as required and charging refrigerant gas, reinstalling in position and testing for the desired condition including replacement of strainer complete all as directed Make- Kirloskar/ Godrej/Tecumseh |
| 7 | Supply and replacement of compressor sealed unit suitable for Split ACs 2 Ton Capacity ,rotary type flushing , vacuumising and hydration the system, leakage testing , welding/soldering as required and charging refrigerant gas, reinstalling in position and testing for the desired condition including replacement of strainer complete all as directed Make- Kirloskar/ Godrej/Tecumseh |
| 8 | Material and labour for charging of gas in window type AC 1.5/2 Ton ( R-22/ R410A/R32) after flushing, vaccumising and dehydration as per laid down standard practice and existing model including replacement of strainer complete as directed. |
| 9 | Material and labour for charging of gas in split type AC 1.5/2 Ton ( R-22/ R410A/R32) after flushing, vaccumising and dehydration as per laid down standard practice and existing model including replacement of strainer complete as directed. Please Enable Macros to View BoQ information |
| 10 | Material and labour for charging of gas in split type AC 1.5/2 Ton ( R-22/ R410A/R32) after flushing, vaccumising and dehydration as per laid down standard practice and existing model including replacement of strainer complete as directed. Please Enable Macros to View BoQ information |