| 1 | labour for site clerance |
| 2 | Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50 M. including all lifts, levelling, ramming the foudation trenches, removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/l. |
| 3 | Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including' cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/l (Mode of measurement complacted volume). |
| 4 | Providing designation 75 B one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I. |
| 5 | Earth filling in foundaion trenches and plinth in layers not exceding 150 mm thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation trenches within a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I. (mode of measurement compacted volume) |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centring and shuttering ,finishing and reinforcement-all work upto plinth level:1:3:6 (1 cement : 3coarse sand (zone III) : 6 graded stone aggregates 20 mm nominal size) |
| 7 | Reinforced cement concrete work in walls(any thickness),including attached pilaster,buttresses,plinth and string courses,fillets ,columns,pillars,piers,abutments,posts and struts etc above plinth level upto floor five level,excluding cost of centring ,shuttring,finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand (zone III) : 3 graded stone aggregates 20 mm nominal size) |
| 8 | Centering and shuttering including strutting,propping etc and removal of from forFoundations,footings,base of column etc for mass concrete |
| 9 | Centering and shuttering including strutting,propping etc and removal of from for lintels, beams, plinth beams, girders, bressumers and cantilevers |
| 10 | Centering and shuttering including strutting,propping etc and removal of from for lintels, beams, plinth beams, girders, bressumers and cantilevers (ii) COLUMN(5.3.17.6) |
| 11 | Providing Tor steel reinforcement of 10mm. ,12mm & 16mm dia. bars as per approved design and drawing excluding carriage of M.S. bars to work site , cutting, bending and binding with annealed wire with cost of wire, removal of rust placing the rods in position all complete as per building specification and direction of E/l. 8 mm dia |
| 12 | 10mm dia |
| 13 | 12 mm dia |
| 14 | Providing designation 75 B brick work in C.M. (1:6) in superstructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including, providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth curing, taxes and royalty all complete as per building specification and direction of E/I. |
| 15 | Providing 12mm cement plaster (1:6) with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/l. |
| 16 | Providing two coats of snowcem of approved shade and make over a coat of cement primer on new surface including preparing the plastered surface smooth with sand paper, scaffolding, curing and taxes all complete as per building specification and direction of E/l. |
| 17 | Supplying of vertical Post L50x 50 x5 (Gr-A):- 3.8kg/m |
| 18 | Drilling 6mm dia holes in M.S. angle iron for fixing of staples etc. as per building specification and direction of E/l. |
| 19 | Labour for fabricating, erecting, hoisting and fixing in position structural steel work in R.S. joist, channel, Angle, Tee, flat, plate, latice member, built up compound section in column, girder, staircase or truss including cost of gusset plates, holding down bolts, anchor plates at all heights and depths, bolting, welding (machining wherever necessary) with applying a priming coat of red lead paint all complete as per approved drawing, building specification and direction of E/l. |
| 20 | Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used. |
| 21 | Supplying fitting and fixing M.S grill made of 20x60mm M.S. flat as per approved design and drawing properly fabricated with joints continuous fillet welded and finished smooth carriage of grill to work site hoisting as per building specification and direction of E/I |
| 22 | (a) Cement + Steel lead (5km) |
| 23 | (b) sand lead (15)km |
| 24 | (c) stone chips lead(15)km |
| 25 | (d) bricks lead (10)km |
| 26 | Add cost for Signboard and Photography |
| 27 | Goods & Service Tax (G.S.T. 18%) |
| 28 | 1% Labour Cess Please Enable Macros to View BoQ information |