| 1 | Material Part of 100KVA S/stn (TS No. 104/2025-26) (WBS No. D-25-2079) |
| 2 | Muff with concerete filling |
| 3 | X-arm [ Chhanel iron (100x50x6mm), Length:2800 mm X 2 Nos] |
| 4 | M S Angle Iron.(50x50x6mm) Length 2800 mmx(1 No) For LA |
| 5 | X-arm [ Chhanel iron (75x40x6mm), Length:2800 mm X 4 Nos] for supporting DO fuse unit & GO switch |
| 6 | X-arm [ Chhanel iron (100x50x6mm), Length:2800 mm X 2 Nos] |
| 7 | X-arm [ Chhanel iron (100x50x6mm), Length:460 mm X 2 Nos for supporting Main Channel of Transformer] |
| 8 | M S Angle Iron (50x50x6mm) Length 2800 mm x 2 Nos |
| 9 | M S Angle Iron (35x35x6mm)Length 460mm x 2 Nos |
| 10 | M S Angle Iron (50x50x6mm) Length 950 mm x 2 Nos |
| 11 | Transformer LT Dist. Box and GO switch fixing assembly |
| 12 | M S Angle Iron (50x50x6mm) Length 2800 mm x 2 Nos |
| 13 | M S Angle Iron (50x50x6mm) Length 450 mm x 1Nos |
| 14 | GO switch handle supporing M S Channel Iron (75x40x6mm) Length 460 mm x 1Nos |
| 15 | GO AB Switch Unit (11 KV. 400A. 25 KA ) |
| 16 | D.O fuse Unit. |
| 17 | Disc insulator sets (comprising 1 No. Disc ^^(Porcelain, BS, 12 KV, 90Kn)including Dead End Clamps etc. |
| 18 | Stay set comp. |
| 19 | Stay wire(7/3.15mm)(7.0 Kg per stay set). |
| 20 | Pipe Earthing set . |
| 21 | 6 SWG GI wire for earthing |
| 22 | Prov. LT Distribution Panel Box with MCCB 160 amp 3P 35kA , ICS =100 % ICU, Kit-Kit 200Amp |
| 23 | Half clamp (M.S. Flat 50x6mm) |
| 24 | Full clamp (M.S. Flat 50x6mm) |
| 25 | M.S. Nuts & Bolts of various sizes (Galvanised/Coated) [Preferably 16 mm phase or more (with flat and spring washers)] |
| 26 | Prov. AluminiumThimble |
| 27 | Prov. copper Thimble |
| 28 | Danger plate |
| 29 | Barbed Wire |
| 30 | L.T. Cable 3.5 X 120 mm² Allumimium Un-Armed |
| 31 | Energy meter (3-p 4-wire) DLMS Compliant 3-ɸ, 4 wire CToperated Static Tri-Vector meter (CT-200/5 A) |
| 32 | Aluminium Paint |
| 33 | Red oxide |
| 34 | LT Switched Capacitors 36-KVAR for 100 KVA ( Rate per KVAR) |
| 35 | Chain Link Fencing, Angle Iron, Gate etc. for transformer fencing |
| 36 | Material Part of HT line (TS No. 104/2025-26) (WBS No. D-25-2079) |
| 37 | Prov. RCC Muff with concerete filling |
| 38 | Prov. 11 KV pin insulator with pin |
| 39 | Prov. Stay set H.T. comp. |
| 40 | Prov. Stay wire(7/3.15mm)(9 Kg per stay set). |
| 41 | Prov. Stay clamp |
| 42 | Prov.MS [ Channel iron (100x50x6mm), Length:1500 mm |
| 43 | Prov. MS [ Channel iron (100x50x6mm), Length:2800 mm |
| 44 | Prov. MS[ Channel iron (75x40x6mm), Length:2800 mm |
| 45 | Prov. Knee Bracing: [Angle Iron (50x50x6mm), (Length 2x750 mm) |
| 46 | Prov.Top clamp |
| 47 | Prov. HT Earthing set complete |
| 48 | Prov. Half Clamps |
| 49 | Prov.Full Clamps |
| 50 | Prov. Nut & Bolts of various sizes (Galvanised / Coated ) [Preferable 16 mm Ø or more (With flat and spring washers )] |
| 51 | Red oxide |
| 52 | Prov. Aluminium paint |
| 53 | GO AB Switch Unit (11 KV. 400A. 11 KV ) |
| 54 | Material Part of LT line (TS No. 104/2025-26) (WBS No. D-25-2079) |
| 55 | Prov. RCC Muff with concerete filling |
| 56 | Shackle insulator |
| 57 | D-iron |
| 58 | Prov. L.T. Stay set Complete |
| 59 | Prov. Stay wire(7/3.15mm)(6.0Kg per stay) |
| 60 | Prov. LT stay clamp |
| 61 | Earth hook |
| 62 | Prov. Nut & Bolts of various sizes (Galvanised / Coated ) [Preferable 16 mm Ø or more (With flat and spring washers )] |
| 63 | Prov. Aluminium Paint |
| 64 | Prov. AB cable (3X95+1X100+1X16mm² ) x 2 Cables) |
| 65 | AB cable suspension Assembly |
| 66 | Anchoring Assembly |
| 67 | Façade Hook |
| 68 | Erection of 100 KVA S/stn (TS No. 104/2025-26) (WBS No. D-25-2079) |
| 69 | Erection of Sub-Station structure, muff with C.C. muffing 1:2:4 ratio, C.I. X-arms 4 Nos size 2800*100*50mm for top fitting and Trans base main channel, 2 Nos CI-X-arm 460*100*50mm for supporting and GO switch handle, 4 Nos AI-X-arm 2800*75*40mm for GO switch and DO Fuse unit, A.I.-X-arms 2800*50*50mm 2 Nos for Trans belting and 2 Nos for LT panel box etc, AI 460*35*35mm for bracing of Trans bed, Strain Insulators,Pin Insulator,bend stepple, ball cleave eye socket, D.O. fuse unit, full and half clamps, MS nuts and bolts off sizes, barbed wire Erection of 100 KVA, 11/0.4 KV transformer, Poles, MCCB for 100 KVA s/Stn, LT cable 3.5 core 50 mm, stay set ,stay wire,G.O Switch,discs Insulator,LA's, S/stn earthing, danger plate,energy meter and Allu paint to all metal parts, jumpering etc.complete in all respect. |
| 70 | Manual carriage for above material (Av. Lead 0.100 Km.) |
| 71 | Erection Part of HT line (TS No. 104/2025-26) (WBS No. D-25-2079) |
| 72 | Erection of ST pole 11/9 mtrs , muff i/c CC muffing with 1:2:4 ratio, CI-X-arm 1500*100*50mm for Single pole structure , drilling of holes in pole , pin insulator with pin, knee bracing set, barbed wire, danger plate, MS full clamps,top clamp, nuts and bolts off sizes, digging of pit, filling ramming and painting to all metal parts etc complete in all respect. |
| 73 | Erection of ST pole 11/9 mtrs , muff i/c CC muffing with 1:2:4 ratio, CI-X-arm 1500*100*50mm for double pole structure , drilling of holes in pole, pin insulator with pin, knee bracing set, barbed wire, danger plate, MS full clamps,top clamp, nuts and bolts off sizes, digging of pit, filling ramming and painting to all metal parts etc complete in all respect. |
| 74 | Erection of HT earthing (pipe earthing) set complete in all respect, digging of earth pit, filling of pit with required material and ramming complete in all respect. |
| 75 | Erection of HT stay set, stay wire, stay clamp, egg insulator, digging of pit, filling and ramming, fixing of stay rod, nozzeling and tightening etc. complete in all respect. |
| 76 | Erection of GO Switch complete in all respect. |
| 77 | Erection AAAC 7/3.15 (50mm2) i/c laying, stringing, sagging, binding with insulators and jumpering etc. complete in all respect. |
| 78 | Laying of G.I. Wire 6/8SWG i/c stringing, sagging and binding with earth hook bolt for continous earth wire complete in all respect. |
| 79 | Manual carriage for above material (Av. Lead 0.100 Km.) |
| 80 | Erection Part of LT line (TS No. 104/2025-26) (WBS No. D-25-2079) |
| 81 | Erection of LT steel poles 8/9 Mtrs long, shackle insulator with D-iron eye hook, digging of pole pit size 1.20x0.80x1.35 filling and ramming and painting etc complete in all respect |
| 82 | Erection of LT stay set, stay clamp, egg insulator, stay wire, stay thimble, nozzeling and tightening, digging of stay pit size 1.20.80*.1.50 mtr, filling and ramming of pit complete in all respect |
| 83 | Erection of LT AB Cable 70 to 95mm2 |
| 84 | Manual carriage for above material (Av. Lead 0.100 Km.) Please Enable Macros to View BoQ information |